Loading...
HomeSearchMy WebLinkAbout2003/2004 Annual Review of the Flood Management Plan (FMP) a2007-2008 Flood Management Plan - FMP - for Period Covering2008/2009 Planned Local Drainage Facility Fund Annual CompliACCEPT ANNUAL REVIEW OF THE FLOOD MANAGEMENT PLAN - FMP - FOAccept Annual Review of the Flood Management Plan (FMP) andACCEPT THE FLOOD MANAGEMENT PLAN ANNUAL REVIEWAcceptance of Improvements - McDONNELL DOUGLAS REALTY COMPAAdopt Ordinance 3198 - Code Amendment 92-4 - Amending SectioAdopt Resolution No. 2007-73 Approving Plans and SpecificatiAdopt Resolution No. 2015-41 approving plans and specificatiAdopt Resolution No. 2020-38 Approving Plans and SpecificatiAlternative Proposals for Flood Control and Allied PurposesANNUAL DRAINAGE FUND REPORT - FY 2005/06Appropriate $210,000 from the Drainage Fund (211) to Repair (2)Approve Sole Source Procurement Request with Murcal IncorporApprove Sole Source Procurement Request with Murcal Incorpor (2)Bartlett Basin Inlet Project - Adams Avenue - County of OranCathodic Protection Project of Orange County's Talbert (D01)Construction within Huntington Beach Channel - Atlanta Ave.County of Orange East Garden Grove Wintersburg Channel ProjeEdinger Storm Channel - Facility No. C05S05 - Parcel 104 - EEdinger Storm Channel - Resolution 2010-36 - Improvements toFiscal Year 2006/2007 Annual Drainage Fund Compliance ReportFiscal Year 2007/2008 Planned Local Drainage Facility Fund AFlood Control- 1960-1987 -( See brief description of file doFlood Control Reports/Studies 8-20-90FLOOD CONTROL-Administration 1-8-89 - 7-29-91Flood Damage February 1983 - Testimony Before House & SenateFlood Hazard StudyFlood Management Plan - Identification of local flood hazardFloodplain District Regulations - Code Amendment 82-13 - AmeFloodplain Management Plan to be prepared by Planning DepartInitial Study/IP05-322 Negative Declaration for the Bolsa ChInterim Improvements to the Santa Ana River ChannelJune 1997 Santa Ana River Flood Protection Agency (SARFPA) ELand Purchase Agreement for Flood Control Channel tract 5581Miscellaneous staff reports related to drainage throughout tNewland Street Residential Storm Drain Improvements ProjectOrange County City Engineers Flood Control Advisory CommitteOrdinance 3812 Amending Chapter 8.17 of the Huntington BeachPlanned Local Drainage Facility Fund Annual Compliance ReporPreparing for El Nino, Huntington Beach City Council Study SPub Hear - Res 2000-85 Flood Management Plan (FMP) conformanResolution 2000-77 - Approves Orange County Flood Control DiResolution 2001-27 - Approves Plans and Specifications for CResolution 2002-46, 2002-47 - Flood Control Improvements - HResolution 2004-28 - Approve Plans and Specifications for thResolution 2009-25 Authorizing the City to enter into a finaResolution 2014-10 - Plans and Specifications for the OrangeResolution 6243 - Construction of improvements to East GardeResolution 6421 - Construction of Improvements to the ExistiResolution 6697 - Plans and Specifications for the constructResolution 96-98 - Approving Plans and Specifications for FlResolution 97-29 - Approving Plans and Specifications for FlResolution 98-44-Approves Orange County Environmental AgencySECURITY FORE CORP Drainage Agrmt Reimb Agrmt #89SECURITY FORE CORP Drainage Reimbursement Agreement #143SHAFFER DEV Storm Drain Construction at Heil Avenue and ASole Source Procurement Request - Cascade Pump Company - Ser (2)Sole Source Procurement Request with Murcal for Hardware andSpecifications for the Construction of Huntington Beach PumpStorm Drain MapsWintersburg Flood Control Channel - H-Item submitted by Mayo