Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Administrative Permit APX2006017 - Supporting Documents
Entitlement Page Two Please be advised that a Notice of Filing Status letter will be sent to you regarding the status/completeness of your entitlement(s) notifying you of the pending hearing date within 30 days of receipt of the entitlement(s) at the zoning counter. The letter will indicate one of the following circumstances: Entitlement Deemed Incomplete; additional information is required (e.g., revised plans, supplemental plans , environmental information, additional entitlements, etc.); or o Entitlement Deemed Complete; the Project Planner is continuing to process your entitlement(s) and you will be notified as to when your project will be scheduled for a hearing by (1) the Design Review Board, (2) the Zoning Administrator, or (3) the Planning Commission. The three scenarios listed below are the subsequent steps to the above notification: a If the project is subject to Planning Commission review, a staff report with a full analysis of the proposal will be prepared. Your plans and supplemental information will be attached to the staff report. A copy of the staff report will be mailed to you prior to the hearing; o If the project is scheduled for Zoning Administrator review, an executive summary with staffs recommendation for the project will be prepared. A copy of the executive summary will be mailed to you prior to the hearing; o If the project is scheduled for Design Review Board action, no staff report will be prepared, however staff will advise you of the staff . ' prior to the meeting. Generally, the complete processing time from submittal to final action by the reviewing body and expiration of the appeal period is as follows: a Design Review Board : 30-45 days (dependent upon the complexity of your project) a Zoning Administ ratoe: 2-3 mates (dependent upon the complexity of your project) Planning Commission: 4-6 months (dependent upon the complexity of your project) Please note: When Zone Changes, General Plan Am, Tentative Maps, or preparation of • environmental documents are involved, additional processing time is necessary. Please direct your questions and co cations to the assigned Pro'ect Planner at 714-536-5271. If you .have any subsequent comments or need additional clarification, please contact me at the same number Thank you in advance for. your interest in Huntington Beach - we look forward to veoddng with yon! S'Y, limb Fauland Prin :pal Planner C., Property Owner Project File _ ,,aty .4 Hunfingbn Beach WAIVER OF DEVELOPMENT STANDARDS REQUEST LETTER SEP 01 2006 Date: A . I a -aG To: City of Huntington Beach Planning Department 2000 Main Street Huntington Beach , CA 92648 714-536-5271 From: Name : e .5 W, Ison) Address: 1 o e/ G a e Telephone #: 56Z % - a Property Owner: e ; 5so. Wit Address: saw A Telephone #: O SUBJECT : WAIVER OF DEVELOPMENT STANDARDS - HBZSO SECTION 241.22 REQUEST: P katr 5 T.e. 4- IMPROVES DESIGN BY: i4o4 i b d vq i S Nws aid S 1 t, 5A. Su S o 3 t4, e Sq O I t '5 a n Thank you for your prompt consideration in this matter. Sincerely, Si nature Re aired: (Authorized Agent/or Applicant) Si nature Re aired: (Property Owner) Date: CA a 5 e- 401141e,1j Date: o g G:\FORMS\PLANNING\Waiver of Dev Stds Letter.doc Revised September 17, 2002 C'7v Vja *0 e eoma ARCHITECTS ARTHUR F. KENT A.I.A. ARCHITECT Icy';ac11 A-vr. -hIa Tl *-r 4! *Jj a o't'-r WMN aP PVVa4vOFfAfflVrr STANDS Fg3Q r k! t pr'.- c, 6 N a" fvi+ -4,- COft;c7rt o . j L$ 5 C -TK-pgAw446 wew i 'f COAA fP4.VrM G*P-%f A4 E vi g7S 7w 7-4,1N8N& C2PV' io1'--®vp- tr4^Wpm.- -JJ403- 74 sp- pityofHunttfn9tonBeach t ©1574 JAN2 5 2001 c 325 A 2nd St. Huntington Beach CA 92648 714\969-6306 FAX 714\536-4917