HomeMy WebLinkAboutInitial Plan IPZR2004006 - Project DescriptionA. J. Koltavary I Civil Engineers
17802 Mitchell North
Irvine, California 92614
949.752 5466 - Fax 949.752.6455
January 29, 2004
Howard Zelefsky, Planning Director
City of Huntington Beach
2000 Main Street
Huntington Beach, Ca 92648
Re C.U P 98-89 Jiffy Lube
9032 Adams Ave,
Huntington Beach, CA
Dear Mr Zelefsky
We have been asked by staff to submit a ZA narrative on our C U P for staff
review This submittal outlines the changes requested on our original C U P
We have not made any changes to the site layout or grading plan once
approved
The changes that have been made were made to the massing of the building and
a reduction in service bays None of the conditions of approval have been
changed We continue to accept the conditions originally placed on this project
and will meet those conditions
Our building is now reduced in size We have reduced our basement area from a
3 bay lube to a two bay lube with only a pit area rather then a full basement
The bay doors on the building have been reduced from 6 sectional doors to 4
sectional doors and the profile of the building height has been reduced
We have removed the gazebo structure placed in front of the budding and
replaced it with the extension of screen wall to continue to hide the visibility of the
sectional doors from Adams Ave
The function of the building has remained the same but the scope of operations
has been reduces along with the overall impact of the building on site
We would ask that new construction permits be issued under the new building
plans and that we may be able to continue with the development and
improvement of this now vacant pad within the existing shopping center
Thank you,
Sinc I ,
nd w Koltavary,
Jiffy Lube Representative
d32 1s k j 4L J! r-Y
t"IEb..-1-1.15..- - - •-- /
'4
LIJ
= 44 r=Ii 45: UA-rs 1-._
-+-(: E-) v i -- e-u- - - -