HomeMy WebLinkAboutAdministrative Permit CDP2006012 - Project Implementation Code RequirementsCITY OF HUNTINGTON BEACH
G PLANNING DEPARTMENT
HUNTINGTON BEACH
DATE:
PROJECT NAME:
ENTITLEMENTS:
PROJECT IMPLEMENTATION CODE REQUIREMENTS
PROJECT LOCATION:
PLANNER:
TELEPHONE/E-MAIL:
PLAN REVIEWER-FIRE:
TELEPHONE/E-MAIL:
PROJECT DESCRIPTION:
July 18, 2007
Chi Residence
Coastal Development Permit No. 2006-012 & Administrative Permit No.
2007-013
3301 Devon Circle, Huntington Beach, CA 92649
Jennifer Villasenor
(714) 374-1661/jvillasenor@surfcity-hb.org
Lee Caldwell
(714) 536-5531/IaIdwelI@surfcity-hb.org
To permit an approximately 1,400 square foot addition to an existing single-
family residence to match an existing non-conforming front yard setback of
6 ft.-1 1 in. at the nearest point in lieu of the minimum required front yard
setback of 15 ft.
The following is a list of code requirements deemed applicable to the proposed project based on plans
received and dated July 24, 2006, with subsequent revisions submitted on June 20, 2007 and July 5,
2007. The list is intended to assist the applicant by identifying requirements which must be satisfied
during the various stages of project permitting and implementation. A list of conditions of approval
adopted by the Zoning Administrator in conjunction with the requested entitlement(s), if any, will also be
provided upon final project approval. If you have any questions regarding these requirements, please
contact the Plan Reviewer.
1. The site plan, floor plans, and elevations approved by the Zoning Administrator shall be the
conceptually approved design with the following modifications:
a. - The addition of the second floor shall not project beyond the existing nonconforming first floor
front yard setback. Elevations and floor plans dated June 20, 2007, shall be revised to illustrate
that the proposed second floor balcony will not project beyond the existing first floor or the
balcony shall be removed and a non-projecting architectural feature shall be provided to minimize
massing.
b. Depict all utility apparatus, such as but not limited to, back flow devices and Edison transformers
on the site plan. Utility meters shall be screened from view from public right-of-ways. Electric
transformers in a required front or street side yard shall be enclosed in subsurface vaults.
Backflow prevention devices shall be prohibited in the front yard setback and shall be screened
from view.
c. All exterior mechanical equipment shall be screened from view on all sides. Rooftop mechanical
equipment shall be setback a minimum of15 feet from the exterior edges of the building.
Page 2 of 3
Equipment to be screened includes, but is not limited to, heating, air conditioning, refrigeration
equipment, plumbing lines, ductwork and transformers. Said screening shall be architecturally
compatible with the building in terms of materials and colors. If screening is not designed
specifically into the building, a rooftop mechanical equipment plan showing proposed screening
must be submitted for review and approval with the application for building permit(s). (HBZSO
230.76)
d. Depict the location of all gas meters, water meters, electrical panels, air conditioning units,
mailboxes (as approved by the United States Postal Service), and similar items on the site plan
and elevations. If located on a building, they shall be architecturally integrated with the design of
the building, non-obtrusive, not interfere with sidewalk areas and comply with required setbacks.
e. Any proposed walls or fences, or modifications to existing walls or fences, which exceed 42
inches in height, require separate building permits and, in the case of walls or fences which
straddle a property line, an executed City of Huntington Beach common wall agreement form.
2. Prior to submittal for building permits, the following shall be completed:
a. Zoning entitlement conditions of approval, code requirements identified herein and code
requirements identified in separately transmitted memorandum from the Departments of Fire and
Public Works shall be printed verbatim on one of the first three pages of all the working drawing
sets used for issuance of building permits (architectural, structural, electrical, mechanical and
plumbing) and shall be referenced in the sheet index. The minimum font size utilized for printed
text shall be 12 point
3. Prior to issuance of demolition permits, the following shall be completed:
a. The applicant shall follow all procedural requirements and regulations of the South Coast Air
Quality Management District (SCAQMD) and any other local, state, or federal law regarding the
removal and disposal of any hazardous material including asbestos, lead, and PCB's. These
requirements include but are not limited to: survey, identification of removal methods,
containment measures, use and treatment of water, proper truck hauling, disposal procedures,
and proper notification to any and all involved agencies.
b. The applicant shall disclose the method of demolition on the demolition permit application for
review and approval by the Director of Building and Safety. (B&S)
4. Prior to issuance of building permits, the following shall be completed:
a. All applicable Building & Safety, Public Works and Fire Department fees shall be paid.
b. State-mandated school impact fees shall be paid.
c. All new commercial and industrial development and all new residential development not covered
by Chapter 254 of the Huntington Beach Zoning and Subdivision Ordinance, except for mobile
home parks, shall pay a park fee, pursuant to the provisions of HBZSO Section 230.20 -
Payment of Park Fee. The fees shall be paid and calculated according to a schedule adopted by
City Council resolution (City of Huntington Beach Planning Department Fee Schedule).
5. The Planning Director ensures that all requirements herein are complied with. The Planning Director
shall be notified in writing if any changes to the site plan, elevations and floor plans are proposed as
a result of the plan check process. Building permits shall not be issued until the Planning Director
has reviewed and approved the proposed changes for conformance with the intent of the Zoning
Administrator's action and the conditions herein. If the proposed changes are of a substantial nature,
Page 3 of 3
an amendment to the original entitlement reviewed by the Zoning Administrator may be required
pursuant to the Huntington Beach Zoning and Subdivision Ordinance.
6. The applicant and/or applicant's representative shall be responsible for ensuring the accuracy of all
plans and information submitted to the City for review and approval.
7. Coastal Development Permit No. 06-012/ Administrative Permit No. 07-013 shall not become
effective until the ten working day appeal period from the Zoning Administrator approval of the
entitlements has elapsed. For projects in the appealable area of the coastal zone, there is an
additional ten working day appeal period that commences when the California Coastal Commission
receives the City's notification of final action.
8. Coastal Development Permit No. 06-012/ Administrative Permit No. 07-013 shall become null and
void unless exercised within one year of the date of final approval or such extension of time as may
be granted by the Director pursuant to a written request submitted to the Planning Department a
minimum 30 days prior to the expiration date.
9. The Zoning Administrator reserves the right to revoke Coastal Development Permit No. 06-012/
Administrative Permit No. 07-013 pursuant to a public hearing for revocation, if any violation of the
conditions of approval, Huntington Beach Zoning and Subdivision Ordinance or Municipal Code
occurs.
10. The project shall comply with all applicable requirements of the Municipal Code, Building & Safety
Department and Fire Department, as well as applicable local, State and Federal Fire Codes,
Ordinances, and standards, except as noted herein.
11. Construction shall be limited to Monday - Saturday 7:00 AM to 8:00 PM. Construction shall be
prohibited Sundays and Federal holidays.
12. The applicant shall submit a check in the amount of $50.00 for the posting of the Notice of Exemption
at the County of Orange Clerk's Office. The check shall be made out to the Count of Oran e and
submitted to the Planning Department within two (2) days of the Zoning Administrator's action.
13. Any proposed cantilevered deck, dock, and/or ramp improvements located in the public waterway
shall require separate permits.