Loading...
HomeMy WebLinkAboutInitial Plan; Zoning Review IPZR2007003 - Project Implementation Code Requirements0 HUNTINGTON BEACH DATE: PROJECT NAME: ENTITLEMENTS: 4 HUNTINGTON BEACH ,?oo, PUBLIC WORKS DEPARTMENT PROJECT IMPLEMENTATION CODE REQUIREMENTS DATE OF PLANS: PROJECT LOCATION: PLANNER PLAN REVIEWER: TELEPHONE/E-MAIL: PROJECT DESCRIPTION: MAY 3, 2007 METROPRO PARKING LOT INITIAL PLAN, ZONING REVIEW NO. 2007-003 PLANNING APPLICATION NO. 2007-0055 MARCH 8, 2007 18931 GOTHARD ST. (WEST SIDE, NORTH OF GARFIELD) RAMI TALLEH, ASSOCIATE PLANNER STEVE BOGART, ASSOCIATE CIVIL ENGINEER lj4 714-374-1692 / SBOGART@SURFCITY-HB.ORG TO PAVE AN EXISTING GRAVEL IMPOUND YARD The following is a list of code requirements deemed applicable to the proposed project based on plans as stated above. The items below are to meet the City of Huntington Beach's Municipal Code (HBMC), Zoning and Subdivision Ordinance (ZSO), Department of Public Works Standard Plans (Civil, Water and Landscaping) and the American Public Works Association (APWA) Standards Specifications for Public Works Construction (Green Book), the Orange County Drainage Area management Plan (DAMP), and the City Arboricultural and Landscape Standards and Specifications. The list is intended to assist the applicant by identifying requirements which shall be satisfied during the various stages of project permitting, implementation and construction. If you have any questions regarding these requirements, please contact the Plan Reviewer. THE FOLLOWING DEVELOPMENT REQUIREMENTS SHALL BE COMPLETED PRIOR TO ISSUANCE OF A GRADING PERMIT: 1 A Precise Grading Plan, prepared by a Licensed Civil Engineer, shall be submitted to the Public Works Department for review and approval. (MC 17.05/ZSO 230.84) The plans shall comply with Public Works plan preparation guidelines and include the following improvements on the plan: a. If the existing driveway approach on Gothard Street does not conform to Public Works Standard Plan No. 211, it shall be removed and replaced with an ADA compliant driveway approach per the aforementioned standard plan.. (ZSO 230.84) b. Survey elevations, the proposed drainage pattern and construction of the proposed site design water quality Best Management Practices (BMPs). Page 2 of 2 2. A Project WQMP shall be submitted to the Public Works Department for review and acceptance and shall include the following: a. Discusses regional or watershed programs (if applicable) b. Addresses Site Design BMPs (as applicable) such as minimizing impervious areas, maximizing permeability, minimizing directly connected impervious areas, creating reduced or "zero discharge" areas, and conserving natural areas c. Incorporates the applicable Routine Source Control BMPs as defined in the Drainage Area Management Plan (DAMP) d. Incorporates Treatment Control BMPs as defined in the DAMP e. Generally describes the long-term operation and maintenance requirements for the Treatment Control BMPs f. Identifies the entity that will be responsible for long-term operation and maintenance of the Treatment Control BMPs g. Describes the mechanism for funding the long-term operation and maintenance of the Treatment Control BMPs h. Includes an Operations and Maintenance (O&M) Plan for all structural BMPs i. After incorporating plan check comments of Public Works, three final WQMPs (signed by the owner and the Registered Civil Engineer of record) shall be submitted to Public Works for acceptance. After acceptance, two copies of the final report shall be retuned to applicant for the production of a single complete electronic copy of the accepted version of the WQMP on CD media that includes: j. i) The 11" by 17" Site Plan in .TIFF format (400 by 400 dpi minimum). ii) The remainder of the complete WQMP in PDF format including the signed and stamped title sheet, owner's certification sheet, Inspection/Maintenance Responsibility sheet, appendices, attachments and all educational material. The applicant shall return one CD media to Public Works for the project record file. THE FOLLOWING DEVELOPMENT REQUIREMENTS SHALL BE COMPLETED PRIOR TO GRADING PERMIT CLOSEOUT: 1. The applicant shall: a. Demonstrate that all structural Best Management Practices (BMPs) described in the Project WQMP have been constructed and installed in conformance with approved plans and specifications. b. Demonstrate all drainage courses, pipes, gutters, basins, etc. are clean and properly constructed. c. Demonstrate that applicant is prepared to implement all non-structural BMPs described in the Project WQMP. d. Demonstrate that an adequate number of copies of the approved Project WQMP are available for the future occupiers. 2. All applicable Public Works fees shall be paid at the current rate unless otherwise stated, per the attached Public Works Fee Schedule adopted by the City Council Resolution 2006-47. (ZSO 240.06/ZSO 250.16) G:\Engineering Division\ELLIOTT\Conditions 2007\IPZR 07-03 PA 07-0077 (18931 Gothard - Metropro) Dev Req 5-3-07.doc