HomeMy WebLinkAboutAdministrative Permit APX2009011 - Project Implementation Code RequirementsCity of Huntington Beach
0- 2000 MAIN STREET CALIFORNIA 92648
DEPARTMENT OF PLANNING
July 28, 2009
Hannibal Petrossi
3700 Campus Drive #200
Newport Beach CA 92660
SUBJECT: ADMINSTRATIVE PERMIT NO. 09-011 (TRI-MODEL INC. PRIVACY GATE
AND WALL)--5322 OCEANUS DRIVE
PROJECT IMPLEMENTATION CODE REQUIREMENTS
Dear Mr. Petrossi:
In order to assist you with your development proposal, staff has reviewed the project and
identified applicable city policies, standard plans, and development and use requirements,
excerpted from the City of Huntington Beach Zoning & Subdivision Ordinance and Municipal
Codes. This list is intended to help you through the permitting process and various stages of
project implementation.
It should be noted that this requirement list is in addition to any "conditions of approval" adopted
by the Planning Director. Please note that if the design of your project or if site conditions
change, the list may also change based upon modifications to your project and the applicable
city policies, standard plans, and development and use requirements.
If you would like a clarification of any of these requirements, an explanation of the Huntington
Beach Zoning & Subdivision Ordinance and Municipal Codes, or believe some of the items
listed do not apply to your project, and/or you would like to discuss them in further detail, please
contact me at 714-374-1744 (tn u en surfcit -hb.or and/or the respective source
department (contact person below).
Sincerely,
'1,6'Z7 NW-
TESS NGUYEN
Associate Planner
Enclosures
cc: Gerald Caraig, Building & Safety Department - 714-374-1575 Herb Fauland, Planning Manager
Darin Maresh, Fire Department - 714-536-5531 Jason Kelly, Planning Department
Prince Herzog, Property Owner Project File
Phone 714-536-5271 Fax 714-374-1540 www.surfcity-hb.org
G
HUNTINGTON BEACH
HUNTINGTON BEACH FIRE DEPARTMENT
PROJECT IMPLEMENTATION CODE REQUIREMENTS
DATE:
PROJECT NAME:
ENTITLEMENTS:
PROJECT LOCATION:
PLAMMER:
TELEPHONE/E-M\j AOL:
PLAN REVIEWER-FIRE:
TELEPHONE/E-MAIL:
PROJECT DESCRIPTION:
JULY 14, 2009
TRI-MODELS INC.
PLANNING APPLICATION NO 09-173
5322 OCEANUS DRIVE, HUNTINGTON BEACH, CA
TESS NGUYEN, ASSOCIATE PLANNER
(714) 374-1744/ tnguyen@surfcity-hb.org
DARIN MARESH, FIRE DEVELOPMENT SPECIALIST
(714) 536-5531/ dmaresh surfcit -hb or
TO PERMIT THE FOLLOWING:
1) A 7.5 FT. HIGH, 26 FT. LONG MASONRY WALL TO REMAIN;
2) A 7.5 FT. HIGH, 24 FT. LONG METAL GATE TO REMAIN; AND
3) A 13.5 FT. HIGH, 62 FT. LONG, AND 20 FT. WIDE METAL CANOPY
TO REMAIN ON THE SIDE OF THE BUILDING.
The following is a list of code requirements deemed applicable to the proposed project based on plans
received and dated June 29, 2008. The list is intended to assist the applicant by identifying requirements
which must be satisfied during the various stages of project permitting and implementation. A list of
conditions of approval adopted by the Planning Commission in conjunction with the requested
entitlement(s), if any, will also be provided upon final project approval. If you have any questions
regarding these requirements, please contact the Plan Reviewer- Fire: DARIN MARESH, FIRE
DEVELOPMENT SPECIALIST.
PRIOR TO DEMOLITION, GRADING, SITE DEVELOPMENT, ISSUANCE OF GRADING
PERMITS, BUILDING PERMITS, AND/OR CONSTRUCTION, THE FOLLOWING SHALL BE
REQUIRED:
Secured Vehicle Entries shall utilize KNOX® activated access switches (Knox switches for
automated gates, Knox padlocks for manual gates), and comply with City Specification #403,
Fire Access for Pedestrian or Vehicular Security Gates & Buildings. Reference compliance in
the plan notes. (FD)
THE FOLLOWING CONDITIONS SHALL BE MAINTAINED DURING CONSTRUCTION:
a. Fire/Emergency Access And Site Safety shall be maintained during project construction phases in
compliance with HBFC Chapter 14, Fire Safety During Construction And Demolition. (FD)
Page 2 of 2
b. Fire/Emergency Access And Site Safety shall be maintained during project construction phases in
compliance with City Specification #426, Fire Safety Requirements for Construction Sites. (FD)
OTHER:
a. Discovery of additional soil contamination or underground pipelines, etc., must be reported to the
Fire Department immediately and the approved work plan modified accordingly in compliance
with City Specification #431-92 Soil Clean-Up Standards. (FD)
b. Outside City Consultants The Fire Department review of this project and subsequent plans may
require the use of City consultants. The Huntington Beach City Council approved fee schedule
allows the Fire Department to recover consultant fees from the applicant, developer or other
responsible party. (FD)
Fire Department City Specifications may be obtained at:
Huntington Beach Fire Department Administrative Office
City Hall 2000 Main Street, 5th floor
Huntington Beach, CA 92648
or through the City's website at www.surfcity-hb.org
If you have any questions, please contact the Fire Prevention Division at (714) 536-5411.
S \Prevention\1-Development\1-Planning Department - Planning Applications, CUP's\2009 CUP's\Oceanus 5322 (Tri-Models) PA#09-173 07-
14-09 DM doc
•
Jj
HUNTINGTON BEACH
DATE:
PROJECT NAME:
ENTITLEMENTS:
CITY OF HUNTINGTON BEACH
BUILDING AND SAFETY DEPTARTMENT
PROJECT IMPLEMENTATION CODE REQUIREMENTS
DATE OF PLANS:
PROJECT LOCATION:
PROJECT PLANNER:
PLAN REVIEWER:
TELEPHONE/E-MAIL:
PROJECT DESCRIPTION:
07/14/2009
TRI-MODELS INC.
PLANNING APPLICATION NO. 2009-173: ADMINISTRATIVE PERMIT
NO. 2009-011
06/29/2009
5322 OCEANUS DRIVE, HUNTINGTON BEACH
TESS NGUYEN, ASSOCIATE PLANNER
EDWARD S. LEE, PLAN CHECKER II
(714) 374-1538 / ELEE@SURFCITY-HB.ORG
TO PERMIT THE FOLLOWING:
1) A 7.5 FT. HIGH, 26 FT. LONG MASONRY WALL TO REMAIN;
2) A 7.5 FT. HIGH, 24 FT. LONG METAL GATE TO REMAIN; AND
3) A 13.5 FT. HIGH, 62 FT. LONG AND 20 FT. WIDE METAL CANOPY
TO REMAIN ON THE SIDE OF THE BUILDING
The following is a list of code requirements deemed applicable to the proposed project based on plans
received and dated 06/29/2009. The list is intended to assist the applicant by identifying requirements
which must be satisfied during the various stages of project permitting and implementation. Electrical,
plumbing, and mechanical items are not included in this review. If you have any questions regarding
these comments, please contact the plan reviewer. Compliance is required prior to building permit
issuance and all applicable items must meet the Huntington Beach Municipal Code (HBMC) and the
California Code of Regulations (CCR or Title 24).
GENERAL:
1. The codes in effect are the: 2007California Building Code ('07CBC), 2007California Plumbing
Code ('07CPC), 2007California Mechanical Code ('07CMC), 2007California Electrical Code
('07CEC) and 2007California Energy Efficiency Standards as adopted by the City.
2. The masonry wall & metal gate shall be under a same building permit and a separate building
permit shall be required for the metal canopy.
3. Structural plans & calculation prepared by a California registered engineer/architect shall be
provided under the building permits for the proposed 7.5 ft. tall masonry wall & metal gate, and
the metal canopy for review.
G
HUNTINGTON BEACH
DATE:
PROJECT NAME:
PLANNING
APPLICATION NO.:
CITY OF HUNTINGTON BEACH
PROJECT IMPLEMENTATION CODE REQUIREMENTS
ENTITLEMENTS:
DATE OF PLANS:
PROJECT LOCATION:
PROJECT PLANNER:
PLAN REVIEWER:
TELEPHONE/E-MAIL:
PROJECT DESCRIPTION:
JUNE 30, 2009
TRI-MODELS INC.
PLANNING APPLICATION NO. 09-173
ADMINISTRATIVE PERMIT NO. 09-011
JUNE 29, 2009
5322 OCEANUS DRIVE, HUNTINGTON BEACH
TESS NGUYEN, ASSOCIATE PLANNER
(714) 536-XXX/ XXXXX@surfcity-hb org
TO PERMIT THE FOLLOWING:
1) A 7.5 FT. HIGH, 26 FT. LONG MASONRY WALL TO REMAIN;
2) A 7.5 FT HIGH, 24 FT. LONG METAL GATE TO REMAIN; AND
3) A 13.5 FT. HIGH, 62 FT. LONG, AND 20 FT. WIDE METAL CANOPY
TO REMAIN ON THE SIDE OF THE BUILDING.
The following is a list of code requirements deemed applicable to the proposed project based on plans
stated above The list is intended to assist the applicant by identifying requirements which must be
satisfied during the various stages of project permitting and implementation. A list of conditions of
approval adopted by the Planning Commission in conjunction with the requested entitlement(s), if any,
will also be provided upon final project approval. If you have any questions regarding these
requirements, please contact the Plan Reviewer.