Loading...
HomeMy WebLinkAboutAdministrative Permit APX2008025 - Signed ApplicationHUNTINGTON BEACH City of Huntington Beach Planning Department 2000 Main Street Huntington Beach, CA 92648 (714) 536-5271 www surfcit -hb or /Cit De artments/Plannin GENERAL APPLICATION: Fax Number Planning Commission Zoning Administrator /Staff Review C_ Design Review Applicant or Authorized Agent (Contact Person) ?SL Lam. Mailing Address City State Tele hone Number Z3 •O Fax Number • E-mail Address Wk REQUEST ' %.I w k- Uri4. h EXISTING USE: For your convenience, you may request n appointment to submit yourOaentitlement application by contacting the Planning Department at 714-536-5271 FQ1'041AL.Usg pry; Present Zone,r-General Plan Designation-' , 1, p GI V Pi operty wner We Mailing Address Los At3 LE3 Cdr j00 City State Zip Tele hone Number 0 0 0 E-mail Address ilp Ga za ivy 0 e cON T 16OCA ION AND DESCRIPTION OF PROPERT : V • s • Street Address. CI IA-.I . LA to Ii PLANNING APPI ,f6k ION NO:" D Y ' CASE #ENTITLEMENT $FEE Coastal Develo ment Permit Conditi n I Use'Permi Desi n Review Entitl m nt P an Amen ner 1 PI n nd ent L I Coas al Pro 'Amen 1 nne i Pro r'. Si n C de E c tion Te r seP 'rmitr Vaasa ce, -F,,n`-, mn 'Ma Amendm nt omn Text Aniendmen r'ZMA . r !0ZTA' 1 J e l J . "` a Env onmental Review FlopdZone a` -z= Exempt , -Earthquake Fault Zone 1_ Sec. Class__ _Assessment Req. ` e n^ Methane Di trict' EA 'rltedtelopmeit Area' Coastal Ai ea Yes I1o i,lotse/CNEI = Categoncal Exclusion ,nSeismic:Hazard Zones Appeal. ANon°°APPS tC iTidor Exempt Sec. _ '-;Military Buffer:Zgne er ip,Verifi,4ti6nx ,Applicant •Authoriz'ation APN ans°k' . otification,RRq P hs/S1ideS Entertaimhent Permit"n jAKHOA,hp _Computei"Lgg , 7Iy1ap ook' ,Log,,,Plans DateStamiied I CDP CUP, Munnt<to; ' In;1ieuMof. , 11 tDate. R ceived Receipt 6 Received by ;Project Planner`;°-- -,,D`iptributed by T'S i-VU* ,Concprrent,Cases,, Previous Cases, 0p- © `0 q'DZ CU O O Y' 1 OG ' >s e ,jc ,t o14r or • Nearest Major Intersection: _r&M M i WA W O IN 6 • Assessor's Parcel Number(s): •o- 4-Lot Area: of 527 -0 1 -a to -«v • Tract: Block: Lot: I, Print Pro ert Owners na ne 0 am the property owner of the subject property and have read and er nd all s a rpents including the filing requirements on the reverse side of this application. I hereby authorize Ptin its „ to act as my representative and to bind me in all matters concerning this application. I hereby affirm under penalty of perjury that the foregoing statements, facts and attachments are true and correct. I understand that this application for entitlement or variance may be denied, modified or approved with conditions and that such conditions or modifications must be satisfied prior to issuance of building permits. I understand that by filing the application, information on the application including, but rot necessarily limited to the name and address will be included on public records that are posted on the internet. Signature of .Property Owner Date Authorized Agent Date I City of H untington B eac h 2000 MAIN STREET CALIFORNIA 92648 DEPARTMENT OF PLANNING December 9, 2008 Kathleen Kim 6922 Hollywood Boulevard Los Angeles, CA 90028 ENTITLEMENT: Design Review 2008-044; Administrative Permit 2008-025 PROJECT ADDRESS: 500 Pacific Coast Highway PROPERTY OWNER: CIM/Huntington, LLC 6922 Hollywood Boulevard Hollywood, CA 90028 DATE RECEIVED AT ZON IN G COUNTER: December 8, 2008 PROJECT PLANNER : Ethan Edwards, Associate Planner, (714)536-5561; email: ethan.edwards@surfcity-hb.org Dear Applicant: Thank you for submitting your entitlement to the City of Huntington Beach, Planning Department. The assigned Project Planner is responsible for processing your entitlement and will be responsible for the following tasks: Reviewing your entitlement for completeness; Evaluating the project for conformance with the General Plan; Reviewing plans for compliance with the Zoning Code, Design Guidelines , and applicable City Ordinances; Preparation of environmental documents pursuant to the Californ ia Environmental Quality Act (CEQA); Analyzing the site plan layout and, if applicable , the floor plans and elevations; Evaluating the project for compatibili ty with, and potential impacts to, surrounding uses/structures, Coordinating issues related to the Fire Dept , Public Works Dept., Building and Safety Dept., etc ; Obtaining other City department's comments relative to the project, Coordinating any necessa ry communi ty meetings; Preparing a staff report and recommendation (approval/denial) with suggested findings and conditions of approval Scheduling the project for a public hearing; and Assisting you with any follow-up actions and/or conditions of approval Phone 714-536-5271 Fax 714-374-1540 www.surfcity-hb.org Entitlement Page Two Please be advised that a Notice of Filing Status letter will be sent to you regarding the status/completeness of your entitlement(s) notifying you of the pending hearing date within 30 da s of receipt of the entitlement(s) at the zoning counter. The letter will indicate one of the following circumstances: Entitlement Deemed Incomplete ; additional information is required (e.g., revised plans, supplemental plans, environmental information, additional entitlements, etc.); or Entitlement Deemed Complete ; the Project Planner is continuing to process your entitlement(s) and you will be notified as to when your project will be scheduled for a hearing by (1) the Design Review Board, (2) the Zoning Administrator, or (3) the Planning Commission. The three scenarios listed below are the subsequent steps to the above notification: If the project is subject to Planning Commission review, a staff report with a full analysis of the proposal will be prepared. Your plans and supplemental information will be attached to the staff report. A copy of the staff report will be mailed to you prior to the hearing; If the project is scheduled for Zoning Administrator review, an executive summary with staff's recommendation for the project will be prepared. A copy of the executive summary will be mailed to you prior to the hearing; If the project is scheduled for Design Review Board action, no staff report will be prepared, however staff will advise you of the staff recommendation prior to the meeting. Generally, the complete processing time from submittal to final action by the reviewing body and expiration of the appeal period is as follows: Design Review Board : 30-45 days (dependent upon the complexity of your project) Zoning Administrator : 2-3 months (dependent upon the complexity of your project) Planning Commission : 4-6 months (dependent upon the complexity of your project) Please note: When Zone Changes, General Plan Amendments, Tentative Maps, or preparation of environmental documents are involved, additional processing time is necessary. Please direct your questions and communications to the assigned Project Planner. If you have any subsequent comments or need additional clarification, please contact me at 714-536-5271. Thank you in advance for your interest in Huntington Beach - we look forward to working with you! Sin rely, Herb Fauland Planning Manager xc: Property Owner Project File