HomeMy WebLinkAboutLot Line Adjustment LLA2005009 - Project DescriptionEMERALD ENGINEERING
JULY 25, 2005
CITY OF HUNTINGTON BEACH
PLANNING DEPARTMENT
2000 MAIN STREET
HUNTINGTON BEACH, CA.
REFERENCE : NARRATIVE FOR: 1119 PINE STREET
ASSESSOR 'S PARCEL NUMBERS : 023-085-10
DEAR STAFF:
Cm D
tJUL.2 5 2005
THE OWNER OF SUBJECT PROPERTY , ERICA S. ALVAREZ , PROPOSES TO ADJUST
LOT LINE TO CREATE 1 LOT FROM 2 LOTS.
THE EXISTING & PROPOSED USE OF PROPERTY IS RESIDENTIAL.
THE PRESENT AND PROPOSED ZONE FOR SUBJECT PROPERTY IS RL.
THE PROPERTY IS BOUNDED ON THE EAST BY PINE STREET, ON THE WEST BY AN
ALLEY, ON THE NORTH BY LOMA AVE.AND ON THE SOUTH BY RESIDENTIAL.
THE STREET IMPROVEMENTS & PUBLIC UTILITIES , INCLUDING WATER SUPPLY &
SEWAGE DISPOSAL ARE EXISTING.
THERE ARE NO PUBLIC AREAS , TREE PLANTING OR RESTRICTIVE COVENANTS
PROPOSED WITH THIS APPLICATION.
THANK YOU FOR CONSIDERATION ON THIS MATTER.
S ERELY,
DONALD G. BAKER , P.L.S.
18600 Main Street, Suite 160 • Huntington Beach, CA 92648 • (714) 848-4551