HomeMy WebLinkAboutLot Line Adjustment LLA2003003 - Signed ApplicationG
HUNTINGTON BEACH
SUBDIVISION APPLICATION:
Planning Commission
Zoning Administrator
ALFKEO E. FAA-S
Applicant or Authorized Agent
/ 5 / /°R O/' UG,&R LANE 61N17- 85
Mailing Address
(4, '726-47
City State Zip
7/¢ 20 -3327
Telephone Number
CA ,,rC, //A eAT L..L
Property Owner
Fax Number
ND Z--?N0 /n/6
Any AS
Mailing Address
City of Huntington ech
Planning Department
2000 Main Street
Huntington Beach, CA 92648
(714) 536-5271
FOR OFFICIAL USE ONLY
Present Zone ^] DM
General Plan Designation
ENTITLEMENT $FEE CASE #
Tentative Tract Ma TTM
Tentative Parcel Ma TPM -
ot Line Ad'ustmen LLA -
Environmental
Exempt
Assessment Required
EA
Coastal Area Yes_No•
Methane Zone
Flood Zone
Oil District
Redevelopment Area 14
Earthquake Fault L`1_.
Scenic Corridor
Seismic Hazard Zone
Noise /CNEL Ll
Distributed byCity State Zip Exempt
Categorical Exclusion
Telephone Number Fax Number
5A4%4 A9 146tq
Subdivider
Mailing Address
City State Zip
Telephone Number Fax Number
i1-1,f 4 4 L D A)6/Nz2/Af6,
Engineer
/g 600 /y.4/n/ Sr S TE. /60
Mailing Address
vi Ti/6To/t/ &Ac/V C4 9Z6¢'g
City State Zip
/ 4 84'8 -¢55/
Telephone Number Fax Number
CDP #
Ownership Verification
i.J/!bApplicant Authorization
aps
Narrative
44" ublic Notification
Preliminary Title Report
')/rSoils Report
Concurrent Cases:
Previous Cases:
. - 3
Date Received
Received byO3'11
Receipt #
Project Planner
RE UEST: Lo7- G/Alb .I vsTM T /G/14O`1 3 Z-07-S
/At/TV l 4 2 6' L
LOCATION OF PROPERTY:
• Street Address : if known 6!9-2 / /20 TT,E/2
• Name and distance to nearest intersecting street: ,i=AS7 .S/ DLL O/--- UWA/LO ST 5 0 LOLL/S 4-V-4.
LEGAL DESCRIPTION:
• Assessor 's Parcel Number: - 3 S (O Oz 43
• Tract://$ D S Block: Lot: X k
• Section : 3 Township : S Range:
• Acreage: O. 2 7 4 R E S
1, E-. FAA S Print Pro e Owner am the property owner of the subject property and have read
and understood all statements including the filing requirements on the reverse side of this application. I hereby affirm under
penalty of perjury that the foregoing statements, facts and attachments are true and correct. I understand that this application for
subdivision may be denied, modified or approved with conditions and that such conditions must be complied with prior to
submittal of the final map and prior to issuance of building permits. I hereby authorize Print A ent to
act as my representative d bind me in matters concerning this application.
Signature of X / 3-11-0
Property Owner Date Authorized Agent Date
RE UIRED OF ALL APPLICAT S:
lO This application must be typed or printed and filled in completely.
V n21 If the applicant is not the property owner, the property owner shall designate the applicant to act on his behalf and sign this
application.
Tentative Tract Ma s require twenty (20) 18" x 26" copies and two (2) 8-1/2" x 14" copies of the map drawn to a scale not
less than one inch equals 100 feet (1" = 100').
Tentative Parcel Ma s require twelve (12) copies of the tentative map.
Lot Line Ad'ustments require six (6) copies on the prescribed form available at the Zoning Counter.
4. Fold all lans to a maximum size of 8-1/2" x 14" (lower right print side out).
5. The tentative map application shall be accompanied with the following data and reports:
(a) Completed environmental assessment form.
(b) Preliminary title report not more than three (3) months old identifying the legal owners at the time of filing the tentative
map.
(c) Three (3) copies of a preliminary soils report and engineering geology report.
(d) Public notification requirements (see supplemental handout).
(e) Photographs of the subject property.
(1) Written narrative which includes the following:
(1) Existing use or uses of the property and present zoning.
(2) Proposed use of property. If property is proposed to be used for more than one purpose, the area, lots or lot proposed
for each type of use shall be shown on the tentative map.
(3) Statement of the improvements and public utilities, including water supply and sewage disposal, proposed to be made
or installed and the time at which such improvements are proposed to be completed.
(4) Public areas proposed.
(5) Tree planting proposed.
(6) Restrictive covenants proposed.
(g) Coastal Development Permit application if the subdivision is located within the Coastal Zone.
6. The Tentative Map shall contain the following information:
(a) The subdivision name and/or number, date, north point, scale and sufficient description to define the location and
boundaries of the proposed subdivision.
(b) Name and address of record owner or owners of said subdivision.
(c) Name and address of the sudivider.
(d) Name, business address and number of the registered engineer, or licensed surveyor, who prepared map of said
subdivision.
(e) Elevations or contours at intervals or two (2) feet up to five (5) percent grade, give five (5) feet up to ten (10) percent
grade, and ten (10) feet over ten (10) percent grade, to determine slope of the land and the high and low points thereof,
unless approval is obtained from the City Engineer to allow greater intervals.
(f) The locations, names, widths and approximate grades of all roads, streets, highways, ways and locations of existing streets
in the proposed subdivision and along the boundaries thereof.
(g) The location and character of all existing or proposed public utility facilities in said adjoining and contiguous highways,
streets and ways. -
(h) The approximate widths, location and purpose of all existing or proposed easements and contiguous to the proposed
subdivision.
(i) Approximate lot layout, approximate dimensions of each lot, approximate lot sizes (sq. ft./acre), and each to be numbered.
(j) The outline of any existing buildings to remain in place and their location in relation to existing or proposed street and lot
lines.
(k) If the subdivision is within a known oil field, the map shall include the location of all existing oil wells and appurtenances
and a plan of their disposition or treatment including abandonment, underground placement, screening, fencing,
landscaping, conversion of pumping units, etc. Such plan shall include disposition of treatment of all future wells, drill
sites and operations. Such plan shall also include the written concurrence of the oil lessee or operator concerned.
(I) The flood hazard zone and elevation of the base flood.
7. All decisions by the Zoning Administrator and the Planning Commission are final unless appealed within ten (10) days of such
decision and shall be in writing specifying the areas of aggrievement.
.8. The approval or conditional approval of a tentative map or tentative parcel map shall expire twenty-four (24) months from the
date the map was approved or conditionally approved. The expiration of the approved or conditionally approved tentative map
shall terminate all proceedings. Any subsequent subdivision of the same real property shall require the filing and processing of
a new map.
9. Extension on tentative maps and tentative parcel maps:
(a) The subdivider filing a tentative map or tentative parcel map may request an extension of the tentative map or tentative
parcel map approval by written application to the Planning Department, such application to be filed at least thirty (30) days
before the expiration of the approved or conditionally approved map. The application shall state the reasons for the
requested extension. In granting an extension, new conditions and exactions may be imposed and existing conditions may
be revised.
(b) An extension(s) or tentative map or tentative parcel map approval or conditional approval may be extended by the Zoning
Administrator, Planning Commission or City Council for a period not to exceed one (1) year, with a maximum of three (3)
one-year extensions of time. The extension of time shall commence with the expiration date of the approved or
conditionally approved tentative map or tentative parcel map. The approved new date shall not extend more than five (5)
years beyond the date of initial approval.
NOTE: Completion of this application does not presume approval of the subdivision. Such approval is discretionary with the
Zoning Administrator or the Planning Commission. The Zoning Administrator or Planning Commission may deny, modify or
approve the subdivision with conditions.
g:\forms\planning\subap_tm REV. - 5/02
oWN •CCITY Off' HUNTING NBFAH
PROJECT PROCESSING CHECKLIST
(For Planning Staff Use)
ENTITLEMENT NO:PLANNER:
APPLICANT:PROJECT ADDRESS:
APPLICATION FORM REVIEW:
uest Com lete S ecial Permits , Variances ) Photo hs
Pro it Owner's Si Lure or Letter of Authorization Additional Fees Paid
Le al Descri tion/AP No /AP Ma Address Correct
Ver Zonin Narrative Justification for Re nest)
Verif General Plan (Sub-Areas & FAR)
PLANS:
Pro er Number of Plans A licant's Name, Address, Tele hone Number
Develo meat Corn liance Matrix Entitlement No. On Plans
Com lete and internall consistent Sets Site Plan, Elevations, Floor Plans, Sections Drawin s
Accurate, Full Dimensioned, Drawn to Scale and with North Arrow
Must include Property Lines, Street Names, Street Width, Existing and Proposed Buildings, Easements, Adjacent
fin rovements & Uses, Floor Plan
A licant's Name, Address, Tele hone Number
DEVELOPMENT REVIEW REQUEST SENT to Other Departments (Tract Maps ASAP)
See Entitlement Review Re nest List Memo (EP-6R)
ENVIRONMENTAL REVIEW
Cate oricall Exem t Ne ative Declaration
Check lvhti ation Measures of Previousl a roved EIR/N D.
II EIR
COASTAL STATUS:
Not A licable A ealable Area Non-A ealable Area
Exein t Cate oncall Excluded Coastal Develo meat Permit
CONCURRENT PROCESSING Other Entitlements/Fees)
FIELD INSPECTION:
Existin On-Site Use(s) and Ad'aeent Uses Parkin Lot Condition/ Drivewa s/ Reci rocal Access
Landsca in Condition/ Mature Trees Ille al Structures & Additions/ Non-Conformin Si s
Grade Differentials with Adoinin Lots Fences/ Walls - Hei ht/ Condition) Location
PRELIMINARY PLAN CHECK (See Plan Check Sheet)
URBAN DESIGN GUIDELINES See Desi Review Checklist)
OTHER ISSUES:
Flood Plain Easements Previous Entitlements and Conditions
Al uist-Priolo S ecific Plan Area Ad acent Entitlements and Conditions
Seismic Oil Wells Reci rocal Access on Ad'acent Pro e
Hazardous Waste Site Infill Lot Ordinance Pro a Maintenance Ordinance
Redevelo ment Area DAC Meetin
PROJECT REVIEW MEETING with Plannin Staff
SEND FILING STATUS LETTER TO APPLICANT (and property owner, if different ) within 30 days.
Have meetin with A licant, if necessa
COMMUNITY MEETING for Ma'or or Controversial Pro'ccts (Send Notices, include Plannin Commission
SUBDIVISION MEETING REQUIRED (Send Notices)
DESIGN REVIEW MEETING RE UIRED Materials & Color Board (Send Notices
LEGAL SERVICES REQUEST SENT Ordinance, 0 inion, Resolution Zonin Text and Ma Amendments
ENVIRONMENTAL ASSESSMENT COMMITTEE (Send Notices
PLANNING COMMISSION STUDY SESSION Send Notices)
OWNERSHIP MAILING LIST AND MAP ACCURACY: Verified & Most Current (Map and Mailing labels of Owners
and/or Tenants, A licant, Site Pro e Owner, A ent and Matrix)
SEND LEGAL NOTICES FOR PUBLIC HEARING includin Infill Lan a e, if a licable (with labels)
- CONTINUED ON BA CK SIDE -
(glomu :dik1st3b) (10/23/2002)
PREPARESTAFFREPORT/CONDITIONS OFAPPROVAL:
Pre are Attachments Reduced Size Plans Revised Plans
LATE COMMUNICATIONS SENT TO PC, STAFF PLANNER, DIRECTOR, PLANNING MANAGER, &
PRINCIPAL PLANNE PUBLIC WORKS & FIRE STAFF LIAISONS, APPLICANT
PLANNING COMMISSION/ ZO NI NG A D MI MS TR A TOR MEETING :
Colored Site Plans, Floor Plans and Elevations Slides/Photo hs
Massin Model PowerPoint Presentation
After Final Meeting
NOTICE OF ACTION LETTER MAILED TO APPLICANT &/ PROPERTY OWNER
CE A NOTICE AND MITIGATION MONITORING FEE if re uired
APPEALABLE DEVELOPMENT OR CATEGORICAL EXCLUSION LETTER FOR COASTAL , if a licable
PLANS STAMPED WITH NOTED ACTION
MINUTES IN FILE
ORGANIZE ZONING FILE AND PLACE IN FILE CABINET see De t. Polic Memo for file or anization
(g fornu chklst3b) (10)23/2002)0
HUNTINGTON BEACH
Plan Checked By
Date
Entitlement No(s)._
0
CITY OF HUNTINGTON BEACH
PLANNING DEPARTMENT
PLANNING AND ZONING PLAN CHECK
Job Address
Review Body: Planning Commission Zoning Administrator
Proposed Use
1.
2.
Legal Description: Lot
Assessor's Parcel Number (s)
General Plan Designation
Existing Lot Size
RESIDENTIAL
Telephone: (714)536-5271 or Plan Check No.
Plan Dated:
Expiration Date
Design Review Board Director
Block Tract
DM Zone
General Plan Sub Area Requirements
Dedication Required Yes/No (alley, comer, street) Net Lot Size
Proposed Total Building Floor Area
Environmental Status: Study required? Y/N
Proposed Number Units
Exempt (sec. class EA/EIR number
7. Coastal Zone: Y/N Appealable/Nonappealable area Exempt_ Categorical exclusion (sec. class-
8.Special Areas (circle if applicable) Residential lnfill Noise Contour Design Overlay Redevelopment Earthquake
Flood Oil Methane Seismic Liquefaction FAA Historic
Plan Check per HB Zoning and Subdivision Ordinance and General Plan
Section 210.06,
Minimum Building Site
Requirements
RL,RM ,RMH-A RMH RH RMP Additional
Provisions
Proposed
Area (sq. ft.)6,000 6,000 2,500 6,000 6,000 10 ac.(A)(B)(C)
Width(ft.)60 60 25 60 60 -
Cul de sac frontage 45 45 _45 45
Minimum Setbacks (D(R)
Front (ft.)15 15 12 10 10 (E)(F)
Side (ft.)3;5 3;5 3 3;5 3;5 -(G)(l)(J)
Street Side (ft.)6;10 6;10 5 6;10 6;10 -(H)
Rear (ft.)10 10 7.5 10 10 -(I)(J)
Accessory Structure (U)
Garage
Projections Into Setbacks
Maximum Height (ft.)
(K)
(L)(R)
Dwellings 35 35 35 35 35 20 (M)
Accessory Structures
Maximum Floor Area Ratio (FAR)
15 15 15 15 15 15 (L)(R)
Minimum Lot Area per Dwelling
Unit (sq. ft.)
6,222 2,904 *1,742 1,244 _
Maximum Lot Coverage (%)50 50 50 50 50 75 (V)
Minimum Floor Area Required Provided (N)
Courts (P)
Minimum Usable Open Space Common Private (0)
Accessibility within Dwellings (Q)
Waterfront Lots (R)
Landscaping (See Chapter 232)40% front yard = Proposed Yard trees Required Proposed
Fences and Walls (visibility)See Section 230.88
Lighting (T)
Underground Utilities See Chapter 17.64
Screening of Mechanical Equipment See Section 230.76
Refuse Storage Areas See Section 230.78
Antenna See Section 230.80
Performance Standards See Section 230.82
Off-Street Parking and Loading See Chapter 231 See Page 2
Signs See Chapter 233
Nonconforming Structures See Chapter 236
Upper-Story Setbacks Required Provided (F)(M2c)
' Lots 50 feet or less in width = 1 unit per 25 feet of frontage
Lots greater than 50 feet in width = 1 unit per 1,900 square feet
G:\FORMS\PLANNING\pl ancheck_residenti al.doc
0
06/12/00 See Page 2
RESIDENTIAL
Page 2
ADDITIONAL PROVISIONS
HBZSO Section
230.22 Residential Infill Lot
230.62 & 258.02 Legal Building Site
230.64 Substandard Lot
230.68 Projections into Yards
Fireplace or chimney
Cornice, eaves and ornamental
features
Mechanical equipment
Uncovered porches, terraces,
platforms, subterranean garages,
decks, and patios not more than 3
feet in height serving only the first
floor
Stairs, canopies, awnings and
uncovered porches more than 3
feet in height
Bay windows
Balconies
Covered patios
230.70 Measurement of Height
Chapter 231 Off-street Parking
Single family
One bedroom unit
Two bedroom unit
Three bedroom unit or more
Total required
Non-residential requirement
Size
Compact
Turning Radius
Driveway width
Striping Detail
Wheel stops/curbs
Urban Design Guidelines
General Plan,
Maximum Height
Affordable Housing
Density
Noise
ScenictLandscape Corridor
Urban Design
Historical/Cultural
Economic
Requirements,
Required Yes/No or Not Applicable Compliance - windows deck Notice submitted
Yes/No Proof Required Yes/No If yes, submit copy of recorded map or Certificate of Compliance
Yes/No If yes, Conditional Use Permit approval by Zoning Administrator required
No individual projection shall exceed 1/3 of the building length, and the total of all projections
shall not exceed 2/3 of the building length on which they are located.
Provided
Front Yard Side Yard Street Side Yard Rear Yard
2.5'2.5' (30" min clearance)2.5'2.5'
3'2.5' (30" min clearance)3'3'
2'2' (30" min clearance)2' (30" min clearance)2'
6'3'4'5'
4'2' (30" min clearance)4-4'(30" min
clearance)
2.5'2.5' (30" min clearance)2.5'2.5'
3'2' (30" min clearance)3'3'
0 0 5' (max projection 1/2 width of 5'
Dimensions shown: datum top of slab
street side yard)
top of roof
@ enclosed + open + guest = total
@ enclosed + open + guest = total
@ enclosed + open + guest = total
@ enclosed + open + guest = total
enclosed + open + guest = grand total
sq.ft. _ = total
9' x 19' minimum with 7' vertical clearance
8' x 17' (max. 20% on non-guest spaces in projects with 50 or more units
25' residential' 26' nonresidential use in residential zone
10' = if length 150' or less for single family; 20' = all others
Shown per Diagram A Key to site plan
Adjacent to walkways, buildings, fencing, or landscaping
Subject to separate plan check
Requirements Provided
REQUIRED PRIOR TO BUILDING PERMIT SUBMITTAL, ISSUANCE, AND/OR FINAL INSPECTION
Required Item; 'Amount/Due Date Completed
Residential Infill Proof of Mailing
Noise Study
Reciprocal Access Easement Document
Maintenance Easement Document
Joint Use Parking Agreement
Copy of Recorded Map
Copy of Certificate of Compliance
Approval from Coastal Commission
Categorical Exclusion (Coastal) Letter
Landscape and Irrigation Plan
Lighting Plan
Grading Plan
CC&R Review and Approval
Elevation Certificate
Mitigation Monitoring Program
Notice of Exemption
Parkland Dedication In-lieu Fee $
Downtown Specific Plan Fee $831 per acre = $
In-lieu Parking Fee
G:\FORMS\PLANNING\plancheck_residential.do 0 06/12/00
March 11, 2003
Alfred E. Faas
15661 Producer Lane, Unit B
Huntington Beach CA 92649
ENTITLEMENT: Lot Line Adjustment No. 03-03
PROJECT ADDRESS: 6521 Trotter Drive
PROPERTY OWNER: Same
DATE RECEIVED AT
ZONIN COUNTER: March 11, 2003
PROJE PLANNER: Rami Talleh
Dear Applicant:
Thank you for submitting your entitlement to the City of Huntington Beach, Planning Department. The
assigned Project Planner is responsible for processing your entitlement and will be responsible for the
following tasks:
Reviewing your entitlement for completeness;
Evaluating the project for conformance with the General Plan;
Reviewing plans for compliance with the Zoning Code, Design Guidelines,and applicable City
Ordinances;
Preparation of environmental documents pursuant to the California Environmental Quality Act (CEQA);
Analyzing the site plan layout and, if applicable, the floor plans and elevations;
Evaluating the project for compatibility with, and potential impacts to, surrounding uses/structures;
Coordinating issues related to the Fire Dept., Public Works Dept., Building Division, etc.;
Obtaining other City department's comments relative to the project;
Coordinating any necessary community meetings;
Preparing a staff report and recommendation (approval/denial) with suggested findings and conditions of
approval
Scheduling the project for a public hearing; and
Assisting you with any follow-up actions and/or conditions of approval.
Entitlement
Page Two
Please be advised that a Notice of Filing Status letter will be sent to you regarding the status/completeness of
your entitlement(s) notifying you of the pending hearing date within 30 days of receipt of the entitlement(s) at
the zoning counter. The letter will indicate one of the following circumstances:
a Entitlement Deemed Incomplete; additional information is required (e.g., revised plans,
supplemental plans, environmental information, additional entitlements, etc ); or
a Entitlement Deemed Complete; the Project Planner is continuing to process your entitlement(s)
and you will be notified as to when your project will be scheduled for a hearing by (1) the
Design Review Board, (2) the Zoning Administrator, or (3) the Planning Commission.
The three scenarios listed below are the subsequent steps to the above notification-
a If the project is subject to Planning Commission review, a staff report with a full analysis of the
proposal will be prepared. Your plans and supplemental information will be attached to the staff
report. A copy of the staff report will be mailed to you prior to the hearing;
• If the project is scheduled for Zoning Administrator review, an executive summary with staffs
recommendation for the project will be prepared. A copy of the executive summary will be mailed
to you prior to the hearing;
o If the project is scheduled for Design Review Board action, no staff report will be prepared,
however staff will advise you of the staff recommendation prior to the meeting.
Generally, the complete processing time from submittal to final action by the reviewing body and expiration
of the appeal period is as follows:
o Design Review Board: 30-45 days (dependent upon the complexity of your project)
o Zoning Administrator: 2-3 months (dependent upon the complexity of your project)
a Planning Commission: 4-6 months (dependent upon the complexity of your project)
Please note: When Zone Changes, General Plan Amendments, Tentative Maps, or preparation of
environmental documents are involved, additional processing time is necessary.
Please direct your questions and communications to the assigned Project Planner at 714-536-5271. If you
have any subsequent comments or need additional clarification, please contact me at the same number.
Thank you in advance for your interest in Huntington Beach - we look forward to working with you!
Sin ely,
Herb Fauland
Principal Planner
c: Property Owner
Project File