Loading...
HomeMy WebLinkAboutLimited Sign Permit LSP1991004 - Staff Report/Executive SummarysrAfF huntington beach department of community development EW"IOR TO:Planning Commission FROM:Community Development DATE:June 18, 1991 SUBJECT:CONDITIONAL USE PERMIT NO. 91-1'7/LIMITED SIGN PERMIT NO. 91-4/NEGATIVE DECLARATION NO. 91-11 APPLICANT:Presbytery of Los Ranchos DATE ACCEPTED: c/o Joseph L. Woollett, AIA April 26, 1991 58 Plaza Square Orange, CA 92666 MANDATORY PROCESSING DATE: 60 days from Final PROPERTY John March Environmental Determination OWNER:17211 Sandra Lee Lane Huntington Beach, CA 92649 ZONE: C2 (Community Business District) REQUEST:'(P: Phase I-includes the occupancy of an existing GENERAL PLAN: General 7,190 square foot structure.Commercial Phase II-includes the construction of a 21,492 EXISTING USE: Vacant square foot church with an Restaurant Building attached parking garage. LSP: A request to retain LOCATION: 16871 Bolsa the existing 13 foot high, Chica Road 36 square foot changeable copy sign for a period ACREAGE: 1.34 acres of two years. 1.0 SUG E TED ACTI N: Approve Negative Declaration No. 91-11, Conditional Use Permit No. 91-17 with a special permit to allow two (2) compact spaces, and Limited Sign Permit No. 91-4 with findings and suggested conditions of approval and deny the request for a special permit to delete the requirement of the perimeter landscape planter on the western side of the parking structure. 2.0 GENERAL INF RMATION: Conditional Use Permit No. 91-17 is a request for a phased Master Plan for a 21,492 square foot, 400 seat Presbyterian Church with seven (7) classrooms pursuant to Section 9630.C of the Huntington Beach Ordinance Code. The request includes a two level semi-subterranean parking structure to be located at the rear of the property, with special permits to allow two (2) compact parking spaces and to eliminate the required ten (10) foot landscape planter around two (2) sides of the structure. I R Ulm ''+}jJ A-FM-23C Limited Sign Permit No . 91-4 is a request to retain the existing 13 foot high, 36 square foot changeable copy signfor a period of two (2) years pursuant to Section 9610.8 (c) of the Huntington Beach Ordinance Code. Section 9610.8 (c) specifies that the Planning Commission may grant a two (2) year extension of time fora non-conforming signs. A cash bond of $2,000 is required to guarantee the removal after the expiration of '-he extension of time. SURROUNDIN LAND USE Z NING AND GENERAL PLAN DESIGNATIONS: S Pr rt . GENERAL PLAN DESIGNATION: ZONE: LAND USE: General Commercial C2 (Community Business District) Vacant Commercial Building N r h f S Pr ry: GENERAL PLAN DESIGNATION: Medium -High Density ZONE: R3 (Medium -High Density Residential) LAND USE: Multiple Single Family Dwellings East of Sub ' Pro ert : GENET PLAN DESIGNATION: ZONE: LAND USE: General Commercial C2 (Community Business District) Commercial Retail Center South of S "e Pr r . GENERAL PLAN DESIGNATION : General Commercial ZONE: C2 (Community Business District) LAND USE : Single Family Dwelling We of S b ' Pro ert : GENERAL PLAN DESIGNATION : Medium-High Density ZONE: R3 (Medium-High Density Residential) LAND USE: Apartment Complex 4.0 ENVIRONMENTAL STAT . Pursuant to the environmental regulations in effect at this time, the Department of Community Development advertised draft Negative Declaration No. 91-i1 for twenty -one (21) days, and no comments, either verbal or written were received . The staff , in its initial study of the project, has recommended that a negative declaration be issued. Prior to any action on Conditional Use Permit No. 91-17 and Limited Sign Permit No . 91-4, it is necessary for the Planning Commission to review and act on Negative Declaration No. 91-i1. 5.0 OASTAL TAT Not applicable. 6.0 REDEVELOPMENT STATUS: Not applicable. Staff Report - 6/18/91 -2- (9909d) 7 PE IFI PLAN: Not applicable. UBDIVISI N COMMITTEE: Not applicable. 9.0 ISS ES AND ANALYSIS: Pr D ri i n Phase I. During Phase I, the church is proposing to occupy the existing 7,190 square foot structure (formerly the Seafood Grotto Restaurant) by renovating the building interior and enterior for services and educational classes. The church will provide up to two (2) Sunday services and concurrent Sunday School classes for students grades K-12. Weeknight use will include Committee meetings, choir practice and community group functions. The church will consist of a 190 seat sanctuary, 1,638 square foot fellowship hall, classrooms and offices. Parking will be provided at the rear cf the church with a total parking count of eighty-two (82). Access to the site can be taken from one (1) of two (2) existing driveways located on both the north and south property lines. In addition, the church will provide additional landscaping within the parking area. Phase II. Phase II, anticipated to oc,.ur in three (3) to five (5) years, consists of the demolition of a section of the existing structure and the construction of a 21,492 square foot church with a two (2) level semi-subterranean parking structure. The proposed two (2) story building includes a 400 seat sanctuary, 5,790 square foot fellowship hall, classrooms and offices. The proposed parking structure includes 134 stalls (128 standard, 4 handicap, 2 compact) and is located at the rear of the property. a. Ti,a applicant is requesting special permits for two (2) compact spaces and to delete the requirement of a ten (10) foot perimeter landscape planter adjacent to the parking structure. The two (2) compact spaces will be located at both ends of the drive aisle on the lower level. The ten (10) foot perimeter landscape planter which the applicant is requesting to eliminate is located along the west and south property lines adjacent to an apartment complex and tennis courts. The construction of Phase II will also constitute the removal of the north driveway and the addition of the front driveway utilizing the existing curb cut (see Attachment No. 4). The front driveway will be used for deliveries and wedding and memorial services. On-site circulation will be affected with the removal of the north driveway requiring vehicles to enter the parking structure from the south driveway only. A required six (6) foot high masonry wall will be erected along the north property line to help screen the adjacent residentially zoned property. Staff Report - 6/18/91 -3-(9909d) The church facility is to be used primarily on Sundays with up to two (2 ) morning services with concurrent Sunday School activities in adjacent classrooms . It is estimated that between 5-35 people will use the church on weeknights for Board/Committee meetings, choir practice and other community group functions . There will also be six (6) to eight (8) staff personnel in the church during business hours (9:00 AM - 5:00 PM). There will be church work projects occurring on two (2) Saturdays per month between the hours of 8:00 AM to 12:00 noon. The following is a zoning conformance matrix which compares both phases of the proposed project with the development standards of Article 922 (Commercial District Standards), Article 960 (Off-street Parking, Loading and Landscaping ) and Article 963 (Unclassified Uses): PHASE I Section Issue Required Proposed 9220.7 Setbacks Min. 50 ft. (front) 36 ft. (front) Min. 10 ft. (side,rear) 32-47 ft . (side) 160 ft. (rear) 9601.5 Stall Dimensions 9' x 19'9' x 19' Aisle Width 26 ft. (90°)26 ft. (90°) 20 ft. (60°)20 ft. (60°) 9602 Number of 1 per 3 seats parr-,ng spaces =63 82 9630.c Landscape area in parking lot 10% of parking area = 3,236 sf 3,567 sf PHASE II 9220.7 Setbacks Min. 50 ft. (front) Min. 10 ft. (side) Min. 10 ft. (rear) 36' (front) (additional 14' of landscaping) 0' (south side)* 10' (north side) 0' (west side)* 9601.5 Stall Dimensions 9' x 19'9' x 19' Aisle Width 26 ft. (90°)26 ft. (90°) 9602 Number of 1 per 3 seats 134 parking spaces = 134 (128 standard, 4 handicap, 2 compact*) 9601 .6 Parking Structure Ramp Slopes Max. 10%10% *Special Permit Required Staff Report - 6/18/91 -4- (9909d) PHASE II (Continued) Section Is sue Required 9606.3 Special Permit Compact Spaces 20% of total spaces=26 Proposed 2* Perimeter Landscape Planter 10 ft. around 0 ft.* structure at along west and ground level south sides *Special Permit Required Parking The applicant has proposed to construct a two (2) level semi-subterranean parking structure during Phase II of the Presbyterian Church. The 134 stall parking structure includes two compact parking stalls which would require a special permit. Pursuant to Section ial P rmit , the Planning Commission may grant a special permit for compact parking spaces for up to 20% of the total number of spaces. The applicant is also requesting a special permit to delete the requirement for a ten (10) foot landscape planter around the entire parking structure. The proposed parking structure is proposed to have a zero (0) foot setback along the south and west property lines (see Attachment No. 4). Currently , there are tennis courts adjacent to the south, and an apartment building to the west. The building is situated approximately ten (10) feet from the location of the proposed parking structure. At the rear property line, the upper parking deck will be four (4) feet above grade , with a five (5) foot, ten (10) inch wall extending above the deck. The structure will appear as a nine (9) foot, ten (10) inch wall from the western property side. The upper story of the parking garage will be open and visible to the residents in the apartments from the second story. Section 9603 (d) Parkin S ruct r of the Huntingtion Beach Ordinance Code states that deviations from any of the requirements involving parking structures may be granted with approval of a special permit by the Planning Commission. Staff n r the special permit for a zero setback for the parking structure on the rear property line due to compatibility concerns with the adjacent apartment complex. Staff however, does support the special permit request for zero setback on the south property line due to the adjacent tennis court use. Staff also does support the special permit required for two compact parking spaces. Staff Report 6/18/91 -5- (9909d) Noise Noise impacts generated by the number of people and cars in the parking structure on Sunday mornings may affect the adjacent residents. However, mitigation measures identified in the negative declaration will mitigate the impacts on the adjacent properties. Staff is recommending conditions of approval to require that the parking structure incorporate textured , non-squeal surfaces ; outdoor music, chimes, bells , etc. be prohibited ; and the existing six (6) foot high masonr .• wall along the west property line remain . The Planning Commission may also wish to consider having the parking structure roofed and mechanically ventilated to avoid future conflict with the residential. Signs The applicant is requesting to retain the existing 13 foot high, 36 square foot changeable copy sign for the purpose of advertising services and special events. The applicant understands that the permit (Limited Sign Permit No. 91-4) is for a maximum period of two (2) years. After the two (2) year period , the sign shall be brought into conformance with the current code requirements. Upon the construction of Phase II, the applicant is requesting to construct a three (3) foot , four (4) inch high garden wall along the front landscape planter for the purpose of screening the front driveway and installing an identification sign. The applicant is requesting approval of a garden wall with a finished height of five (5) feet within the front setback in lieu of the maximum height limit of 42 inches. The Huntington Beach Ordinance Code Section 961 .5 Permitted Signs, allows freestanding identification signs to be a maximum of 32 square foot and seven (7) feet in height . The applicant will be required to meet the standards of the sign code. 1 RE DATI N: Staff recommends that the Planning Commission approve Negative Declaration No. 91 -11, Conditional Use Permit No. 91 -17 and Limited Sign Permit No. 91 -4 with the following findings and suggested conditions of approval: FINDING F R APPROVAL ONDITIONAL E PERMIT 91-17: 1. The location , site layout , and design of the proposed 21,492 square foot church properly adapts the proposed structures to streets, driveways, and other adjacent structures and uses in a harmonious manner. 2. The combination and relationship of one proposed use to another on site are properly integrated with deletion of special permit. 3. The access to and parking for the proposed church does not create an undue traffic problem as the parking structure. Staff Report - 6/18/91 -6- (9909d) F P R VAL - L PER IT : 1. The requested special permits provide for maximum use of aesthetically pleasing types of architecture , landscaping , design and building layout. 2. The requested special permits will not be detrimental to the general health , welfare, safety and convenience , nor detrimental or injurious to the value of property or improvements of the neighborhood or of the City in general. FINDIN F R APPR VAL LIMITED I N PERMIT NO 91-4: 1. Allowing the maintenance of the sign for an additional two (2) years will not adversely affect other signs in the area with the following modifications: a. A four (4) foot wide landscape planter shall be provided in the center of the rear parking area. b. Landscape pockets shall be provided along the north property line. 2. The proposed extension of time will not be detrimental to property located in the vicinity of such sign , and will be in keeping with the character of the surrounding area. 3. The sign in its existing location along Bolsa Chica Road will not obstruct pedestrian or vehicular traffic vision. 4. Due to the unique circumstances applicable to the sign, immediate alteration , removal or replacement of the sign will result in an economic hardship. SUGGESTED CONDITI NS F APPR VAL - ONDITIONAL SE PERMIT NO 1-11/PHA E I: 1. The site plan, floor plans, and elevations received and dated J'.ne 11, 1991 shall be the conceptually approved layout. 2. Prior to submittal for building permits, the applicant/owner shall complete the following: a. Submit copy of revised site plan for review and approval. A four (4) foot by 144 foot landscape planter along the center of the parking area. b. The site plan shall include (or reference page) all conditions of approval imposed on the project printed verbatim. 3. Prior to issuance of building permits, the applicant /owner shall complete the following: a. Submit copy of the revised site plan, floor plans and elevations pursuant to Condition No. 1 for review and approval and inclusion in the entitlement file. Sta:E . _iiort - 6/18/91 -7- (9909d) b. A Landscape Construction Set must be submitted to the Departments of Community Development and Public Works ar,d must be approved . The Landscape Construction Set shall include a landscape plan prepared and signed by a State Licensed Landscape Architect and which includes all proposed /existing plant materials (location , type, size, quantity ), an irrigation plan, a grading plan, an approved site plan , and a copy of the entitlement conditions of approval . The landscape plans shall be in conformance with Section 9607 and Article 963 of the Huntington Beach Ordinance Code. The set must be approved by both departments prior to issuance of building permits. Any existing mature trees that must be removed shall be replaced at a 2 to 1 ratio with minimum 36-inch box trees , which shall be incorporated into the project 's landscape plan. c. All applicable Public Works fees shall be paid. d. Perimeter fencing plans for review and approval which depict decorative materials. 4. Fire Department Requirements are as follows: a. An automatic fire sprinkler system shall be approved and installed pursuant to Fire Department regulations. b. Service roads and fire lanes , as determined by the Fire Department, shall be posted and marked. c. Fire access lanes shall be maintained . If fire lane violations occur and the services of the Fire Department are required, the applicant will be liable for expenses incurred. d. The applicant shall meet all applicable local, State and Federal Fire Codc,,s, Ordinances , and standards. e. Address numbers shall be installed to comply with Fire Department Specifications. 5. Hours oc operation shall be limited to Monday through Friday 9:00 APi to 10:00 PM, Saturday 8:00 AM to 9 :00 PM, Sunday morning use shall be limited to two (2) services with a minimum period of one (1) hour between services . Other use of the building on Sunday shall be ancillary only. 6. Seating in the sanctuary shall be limited to 190 seats (a maximum of 285 linear feet of pew seating). 7. The Fellowship Hall shall not be used in conjunction with thc Sanctuary. 8. There shall be no use of outdoor bells, chimes public address systems, music, or other source sound which may disturb adjacent residents.* *Mitigation Measures Staff Report - 6/18/91 -8- (9909d) 9. All signs shall conform to the Huntington Beach Ordinance Code Article 961 or permitted otherwise. 10. A minimum six (6) foot high concrete block or masonry wall shall be constructed on both side and rear property lines as required pursuant to Section 9772 R it Wall of the Huntington Beach Ordinance Code. 11. A conditional use permit shall be approved for the establishment of a school operating from Monday through Friday. 12. The development shall comply with all applicable provisions of the Ordinance Cede, Building Division, and Fire Department. 13. All building spoils, such as unusable lumber, wire , pipe, and other surplus or unusable material , shall be disposed of at an off-site facility equipped to handle them. 14. Installation of required landscaping and irrigation systems shall be completed prior to final inspection. 15. Prior to final building permit approval or issuance of a Certificate of Occupancy , the following shall be completed: a. The applicant shall obtain the necessary permits from the South Coast Air Quality Management District and submit a copy to Community Development Department. b. The applicant shall restripe the parking lot so that it conforms to provisions of Article 960 of the Huntington Beach Ordinance Code. c. All improvemenLs (including landscaping ) to the property shall be completed in accordance with the approved plans and conditions of approval specified herein. d. Compliance with all conditions of approval specified hereir. shall be accomplished. 16. The developer shall be responsible for the payment. of the Traffic Impact Fees at the time of final inspection. 17. The Planning Commission reserves the right to modify the terms of this Conditional Use Permit No. 91 -17 if any violation of these conditions or the Huntington Beach Ordinance Code occurs. 18. Conditional Use Permit No. 91-17 shall become null and void unless exercised within one (1) year of the date of final approval, or such extension of time as may be granted by the Planning Commission pursuant to a written request submittei to the Planning Department a minimum 30 days prior to the expiration date. Staff Report - 6/18/91 -9 - (9909d) TED N ITI N F APPR VAL - NDITI NAL E PERMIT N 1-•11 P II: 1. The site plan, floor plans, and elevations received and dated June 11, 1991 shall be the conceptually approved layout with the following modifications: a. A ten (10) foot landscape setback shall be provided along the western property line. 2. Prior to submittal for building permits, the applicant/owner shall complete the following: a. Submit copy of revised site plan for review and approval. b. Depict all utility apparatus , such as but not limited to backflow devices and Edison transformers , on the site plan. They shall be prohibited in the front and exterior yard setbacks unless properly screened by landscaping or other method as approved by the Community Development Director. c. Floor plans shall depict natural gas and 220V electrical shall be stubbed in at the location of clothes dryers; natural gas shall be stubbed in at the locations of cooking facilities, water heaters , and central heating units ; and low-volume heads shall be used on all spigots and water faucets. d. The structures on the subject property, whether attached or detached , shall be constructed in compliance with the State acoustical standards set forth for units that lie within the 60 CNEL contours of the property . Evidence of compliance shall consist of submittal of an acoustical analysis report, prepared under the supervision of a person experienced in the field of acoustical engineering , with the application for building permit(s). e. Elevations shall depict colors and building materials proposed. f. All rooftop mechanical equipment shall be screened from any view. Said screening shall be architecturally compatible with the building in terms of materials and colors. If screening is not designed specifically into the building, a rooftop mechanical equipment plan must be submitted showing screening and must be approved. g. If outdoor lighting is included , high-pressure sodium vapor lamps or similar energy savings lamps shall be used. All outside lighting shall be directed to prevent "spillage" onto adjacent properties and shall be noted on the site plan and elevations. Staff Report - 6/18/91 -10 - (9909d) h. A detailed soils analysis shall be prepared by a registered Soils Engineer . This analysis shall include on-site soil sampling and laboratory testing of materials to provide detailed recommendations regarding grading, soil corrosivity, fill properties, foundations , retaining walls, streets, and utilities. i. The Design Review Board shall review and approve the colors, materials and architectural features for the proposed parking structures. j. The site plan shall include (or reference page ) all conditions of approval imposed on the project printed verbatim. 3. Prior to issuance of building permits , the applicant /owner shall complete the following: a. Submit copy of the revised site plan , floor plans and elevations pursuant to Condition No. 1 for review and approval and inclusion in the entitlement file. b. A Landscape Construction Set must be submitted to the Departments of Community Development and Public Works and must be approved . The Landscape Construction Set shall include a landscape plan prepared and signed by a State Licensed Landscape Architect and which includes all proposed /existing plant materials (location, type, size , quantity ), an irrigation plan, a grading plan, an approved site plan , and a copy of the entitlement conditions of approval . The landscape plans shall be in conformance with Section 9607 and Article 963 of the Huntington Beach Ordinance Code. The must be approved by both departments prior to issuance of uilding permits. Any existing mature trees that must be removed shall be replaced at a 2 to 1 ratio with minimum 36-inch box trees, which shall be incorporated into the project 's landscape plan. c. A grading plan shall be submitted to the Department of Public Works fur review and it must be approved (by issuance of a grading permit ). A plan for silt control for all water runoff from the property during construction and initial operation of the project may be required if deemed necessary by the Director of Public Works. d. Hydrology and hydr aulic studies shall be submitted for Public Works approval. e. All applicable Public Works fees shall be paid. 4. Fire Department Requirements are as follows: a. An automatic fire sprinkler system„ shall be approved and installed pursuant to Fire Department regulations. Staff Report - 6/18/91 -11- (9909d) b. Service roads and fire lanes , as determined by the Fire Department, shall be posted and marked. c. Fire access lanes shall be maintained . If fire lane violations occur and the services of the Fire Department are required, the applicant will be liable for expenses incurred. d. On-site fire hydrants shall be provided in number and at locations specified by the Fire Department. e. The applicant shall meet all applicable local, State and FQderal Fire Codes , Ordinances , and standards. f. Elevators shall be sized to accommodate an ambulance gurney (mm. 6' 8" wide by 4' 3" deep with 42" opening). g. Address numbers $hall be installed to comply with Fire Department Specifications. 4. Hours of operation shall be limited to Aonday through Friday 9:00. AM to 10 :00 PM, Saturday 8:00 AM to 9 :00 PM, Sunday morning use shall be limited to two (2) services with a minimum period of one (1) hour between services . Other use of the building on Sunday shall be ancillary only. 5. Seating in the sanctuary shall be limited to 400 seats (a maximum of 600 linear feet of pew seating). 6. The Fellowship Hall shall not be used in conjunction with the Sanctuary. 4p 7. There shall be no use of outdoor bells, chimes public address systems, music , or other source sound which may disturb adjacent residents.* 8. The parking structure shall incorporate textured, non-squeal surface.* 9. All signs shall conform to the Huntington Beach Ordinance Code Artirie 961 or permitted otherwise. 10. The development shall comply with all applicable provisions of the Ordinance Code, Building Division , and Fire Department. 11. All building spoils , such as unusable lumber, wire, pipe, and other surplus or unusable material , shall be disposed of at an off-site facility equipped to handle them. 12. Installation of required landscaping and irrigation systems shall be completed prior to final inspection. *Mitigation Measures Staff Report - 6/18/91 -12-(9909d) 13. During construction, the applicant shall: a. Use water trucks or sprinkler systems in all areas where vehicles travel to keep damp enough to prevent dust raised when leaving the site; b. Wet down areas in the late morning and after work is completed for the day; c. Discontinue construction during second stage smog a.erts. 14. Construction shall be limited to Monday - Saturday 7:00 AM to 8:00 PM. Construction shall he prohibited Sundays and Federal holidays. 16. Prior to final building permit approval or issuance of a Certificate of Occupancy, the following shall be completed: a. The applicant shall obtain the necessary permits from the South Coast Air Quality Management District and submit a copy to Community Development Department. b. The applicant shall restripe the parking lot so that it conforms to provisions of Article 960 of the Huntington Beach Ordinance Code. c. All improvements (including landscaping ) to the property shall be completed in accordance with the approved plans and conditions of approval specified herein. d. Compliance with all conditions of approval specified herein shall be accomplished. 17. The developer shall be responsible for payment of any additional fees adopted in the opcoming Water Division Financial Master Plan. 18. The developer shall be responsible for the payment of the Traffic Impact Fees at the time of final inspection. 19. The Planning Commission reserves the right to modify the terms of this Conditional Use Permit No. 91-17 if any violation of these conditions or the Huntington Beach Ordinance Code occurs. 20. The Planning Commission reserves the right to modify the terms of this Conditional Use Permit No. 91-17 if any violation of these conditions or the Huntington Beach Ordinance Code occurs. ONDITION OF APPROVAL - LIMITED SIGN PERMIT NO 1-4: 1. The site plan and sign elevation received and dated June 11, 1991, shall be the conceptually approved layout. Staff Report - 6/18/91 -13- (9909d) 2. Limited Sign Permit No. 91-4 shall be valid for two (2) years (until June 18, 1993). 3. Prior to issuance of building permits, the applicant shall file a cash bond in the amount of $2,000 with the City for t:.e purpose of indemnifying the City for any and all costs incurred in the removal of the sign. If the sign is not made to conform with the applicable provisions of the sign ordinance after two (2) years from the date of approval, or remodel of the property , whichever comes first , the City of Huntington Beach or its agents or employees may enter the property where said sign is located and remove said sign and the cost of removal shall be deducted from the cash bond and summarily forfeited and paid over to the City of Huntington Beach, and the remainder , if any, returned to the person depositing the bond. 11.0 ALTERNATIVE A TION: A. The Planning Commission may approve Negative Declaration No. 91-11, Conditional Use Permit Eo. 91 -17 with special permits and Limited Sign Permit No. 91-4 with findings and suggested conditions of approval. B. The Planning Commission may deny Conditional Use Permit No. 91-17 and Limited Sign Permit No. 91-4 with findings. ATTACHMENTS: 1. Area map 2. Narrative 3. Negative Declaration No. 91-11 4. Site plans , elevations , and floor plans dated June 11, 1991 5. Alternative Findings for Denial HS:WC:kj1 Staff Report - 6/i8/91 -14 - (9909d) RIRI-CZR2R3'r;wNNiit- 0-MEADOWLARKR2 R3 R2 SPECIFIC PLAN1. C.SR R3,AA. ,01A2C2R3R3cqC2. _¢_oPWARNERL.._RINRIRlRI-CZao,c4°„OP fl3•P0(0) e4R3C4iRI2C2io tea._.'RIR3RI23An.' R2R3N3.23 OLENROYCUP 91-17/ LSP 91-4/ND 91-11C4-CZrr_ xLay"AhCZ3N9RR3R2,CF-R! R2RlVl/!/l111 _it j(OL/2UIJ. A2 R2U, A3 uumF,R22 R,A R3-19-EL 0 RA00 ORRIRlh IRSIPENRI„IIf JHUNTINGTON BEACH PLANNING DIVISION ii.. PROJECT NARRATIVE All Churches must follow the CUP procedure for new facilities. regardless of site location. The Presbytery of Los Ranchos (a regional division of the Presbyterian Church. USA) has determined the need for a Presbyterian Church to serve the north Huntington Beach area. A recent new church development study (prepared by Church Information and Development Services. January 3, 1989) showed an immediate potential membership of 544 people for this specific location. Currently many Presbyterian Huntington Beach residents drive to St. Andrews Presbyterian Church in Newport Beach to attend church. The proposed project is designed to provide Presbyterian facilities for present and future Presbyterian residents in north Huntington Beach. Currently the surrounding area is comprised of primarily multi-family residential and strip commercial development. The proposed project will provide the community with a 400-seat sanctuary and meeting hall, both of which are suitable for meetings and performances in addition to Sunday morning worship services. Typically, the Presbyterian church also provides such valued community functions as youth activities, counseling and family-oriented social activities. a I A,- pvCtf Nwl" 3 ENVIRONMENTAL CHECKLIST FORM CITY OF HUNTINGTON BEACH PLANNING DIVISION ENVIRONMENTAL ASSESSMENT NO. 91-11 1. Name of Proponent PRE BYTERY F L RAN Q Address 0 se h L. We lle 8 P1 za uare Oran e CA 2 6 Phone Number 714 997-1 02 2. Date Checklist Submitted for Review Ma 8 1 3. Concurrent Entitlement(s) Condi ion 1 U e Permit 91-17 onditional Exception 91-14 and Limi d Si n P rmi 1-4. 4. Project Location 1 71 B 1 a hi a 5. Project Description T es blish and con ru t a chur h wi h educational/ ffic f ili i n 1. 4 r ss a re in 2 ha e Pha I n ist f rem d lin h xi in r s our n tr r r o a omm dat a 1 ea an ar las r m and office facilities. Pha II n i s f d m li i n of h exi in r stauran and ,on truc ion f a 4 0 ea 1 ar fe t s n tuar are 87 sonar f d ati n ffi r nd 1 a rking structure. ENVIRONMENTAL IMPACTS (Explanations of answers are included after each subsection.) Yes Maybe No 1. Earth. Will the proposal result in: a. Unstable earth conditions or changes in geologic substructures?-X Discussion: Phase II of the project proposes construction of a 133 space split level parking structure; the lowest level will be below existing grade and will require removal of approximately 2,500 cubic yards of cut which may alter earth conditions on the site. However, pursuant to standard conditions of approval, the project will be required to submit a soils study which includes on-site sampling and provides specifications for grading, foundations, etc. The project will be required to implement specifications contained therein. No significant impacts are anticipated. e Yes _M4ybq No b. Disruptions, displacements, compaction or overcovering of the soil? X - Discussion: Phase II of the project proposes partial removal of the existing structures and construction of a new church facility and parking which will result in displacement, compaction and overcovering of soil. However, through implementation of standard conditions of approval which require submittal of soils studies and drainage plans, no significant impact is anticipated. c. Change in topography or ground surface relief features?X Discussion: Phase II construction of the parking structure wig' involve alteration to the existing topography of the site. However, with implementation of statd;> conditions of approval requiring submittal of soils studies and drainage plans, no significant impacts to c,•ound surface relief features of drainage are anticipated to result from the proposed project. d. The destruction, covering or modification of any unique geologic or physical features? _ _ X Discussion: The site is currently occupied by a vacant restaurant and has previously been graded. No unique geological or physical features are present on the site. e. Any increase in wind or water erosion of soils, either on or off the site? X Discussion: Development of the proposed project may result in short-ter.:, wind and water erosion impacts during the demolition, grading and construction for Phase IT. However, the project will be subject to standard conditions of approval requiring implementation of dust control measures during construction as well as submittal of drainage and erosion control plans to prior to issuance of grading permits. No significant impacts are anticipated. Changes in deposition or erosion of beach sands, or changes in siltation, deposition or erosion which may modify the channel of a river or stream or the bed of the ocean or any bay, inlet or lake? g. Exposure of people or property to geologic hazards such as earthquakes, landslides, mudslides, ground failure, or similar hazards? X X Discussion: The proposed project site is not located within the Alquist-Priolo Special Study Zone or in the vicinity of any known unstable earth conditions; therefore, no significant impacts are anticipated. 2. Air. Will the proposal result in: a. Substantial air emissions or deterioration of ambient air quality? Discussion: Short-Term: The proposed project may result short-term emissions from construction equipment and grading activities. However, the project will be subject to standard conditions of approval requiring implementation of dust control measures and restriction of construction activities during second stage smog alerts and high ozone days. No significant impact is anticipated. Long-Term: Developments of the project will generate automotive and off-site energy generation emissions (by attracting users and establishing a use on a vacated site). These emissions may incrementally contribute to the degradation of local air quality. However, the project's contribution is not considered significant. Environmental Checklist -2- (9586d) Yes Maybe No b. The creation of objectionable odors? Discussion: The proposed project is not anticipated to generate any objectional odors. c. Alteration of air movement, moisture, or temperature, or any change in climate, either locally or regionally? 3.Water. Will the proposal result in: a. b. Changes in currents, or the course of direction of water movements, in either marine or fresh waters? Changes in absorption rates, drainage patterns, or the rate and amount of surface runoff? _X - Discussion: The project site is currently completely covered by impervious surfaces. Construction of Phase II of the proposed project is not anticipated to impact absorption rates on the site. However, proposed grading associated with development oc the project site may result in alteration of currents, flow patterns and drainage for the site. The project will be subject to standard conditions of approval which require submittal of a grading plan prior to issuance of grading permit. The project will not be allowed to drain onto adjacent properties. No significant impacts are anticipated. c. Alterations to the course or flow of flood waters? Discussion: The project site is not located within the 100 year floodplain. No impacts to flood flows are anticipated. d.Change in the amount of surface water in any water body?X e.Discharge into surface waters, or in arv alteration of surface water quality, including but not limited to temperature, dissolved oxygen or turbidity?-_X f.Alteration of the direction or rate of flow of ground waters?X g. h. Change in the quantity of ground waters, either through direct additions or withdrawals, or through interception of an aquifer by cuts or excavations? Substantial reduction in the amount of water otherwise available for public water supplies?_ _X Discussion: The proposed project will increase water usage on the site compared to the existing vacated restaurant building but is not anticipated to be substantially different than the water usage generated by an operating restaurant and may actually use less water. No significant impact is anticipated. i. Exposure of people or property to water related hazards such as flooding or tidal waves? Discussion: See 3c. 4. Plant Life. Will the proposal result in: a. Change in the diversity of species, or number of any species of plants (including trees, shrubs, grass, crops, and aquatic plants)? Environmental Checklist -3- (9586d) Yes Maybe No b. Reduction of the numbers of any mature, unique, rare or endangered species of plants? c. Introduction of new species of plants into an area, or in a barrier to the normal replenishment of existing species? d. Reduction in acreage of an agricultural crop? Discussion (a-d): The site has previously been cleared of its natural vegetation and developed; no unique X 5. plant species will be affected by the proposed project. Animal Life. Will the proposal result in: a. b. Change in the diversity of species, or numbers of any species of animals (birds, land animals including reptiles, fish and shellfish, benthic organisms or insects)? Reduction of the numbers of any unique, rare or endangered species of animals?-Y c.Introduction of new species of animals into an area, or result in a barrier to the migration or movement of animals?- -.X d.Deterioration to existing fish or wildlife habitat?X Discussion (a-d): The site has previously been developed and does not appear to support any unique animal species. No unique animal species will be effected by the proposed project. 6. Noise. Will the proposal result in: a. Increases in existing noise levels? X Discussion: Short-Term: - Development of the proposed project may result in short-term noise increases associated with grading and construction activities. However, the project will be subject to standard conditionyg of approval which restrict the hours of :onstruction to 7:00 a.m. to 8:00 p.m., Monday - Saturday. No significant impact is anticipated. Long-Term: Operation of the church will increase noise levels compared to those currently generated by the vacated restaurant. The applicant has indicated that a maximum of one service will be held on Sundays with the the possible exception of Holidays, such as Christmas and Easter, when two services may be held. The gathering of 190 to 400 people (presumably mora if services are closely scheduled) prior to and after services and events may adversely impact adjacent residences. Although the main entrances are located at the center of the project site and face away from residences, the noise increase will be noticeable. However, with implementation of mitigation measures identified below, no significant impacts are anticipated. Mitigation: Possible measu:is to mitigate this impact include: 1. The existing 9* high masonry wall which currently exists along the western perimeter of the site should be maintained. 2. No outdoor music, chimes, bells, etc., should be permitted. 3. The parking structure should utilize textured "non-squeal" surfaces. h. Exposure of people to severe noise levels? Discussion: See 6a. Environmental Checklist -4- (9586d) Yes Havbe No 7. Light and Glare. Will the proposal produce new light or glare? Discussion: The project site is currently occupied by a vacated restaurant building. The proposed project will ultimately replace the structure with church, educational and parking facilities and will increase the light produced by the site. However, the project will be subject to standard conditions of approval which require submittal of a lighting plan to insure that lighting on the site will be directed away from adjacent properties. No significant impacts are anticipated. 8. Land Use. Will the proposal result in a substantial alteration of the present or planned land use of an area? Discussion: The proposed project is permitted under the existing General Plan Land Use designation and Zoning on the site subject to Conditional Use Permit Approval by the Planning Commission. 9. Natural Resources. Will the proposal result in: a. Increase in the rate of use of any natural resources? b. Substantial depletion of any nonrenewable natural resource? Discussion (a-b): Ultimate replacement of the existing restaurant building on the site with the 400 seat sanctuary, classroom and office facilities may increase the demand of natural and energy resources on the site. However, the increase usage is not anticipated to be substantial and any impact to the rate of usage or depletion of supplies is anticipated to be negligible. Impacts will be minimized further through implementation of the Energy Conservation Standards in Title 24 of the California Administrative Code as required through standard conditions of approval. 10. Risk of Upset. Will the proposal involve: a. A risk of an explosion or the release of hazardous substances (including, but not limited to oil, pesticides, chemicals or radiation) in the event of an accident or upset conditions? b. Possible interference with an emergency response plan or an emergency evacuation plan? 11. Population. Will the proposal alter the location, distribution, density, or growth rate of the human population of an area? 12. Housing. Will the proposal affect existing housing, or create a demand for additional housing? x 13, Transportation/Circulation. Will the proposal result in: a. Generation of substantial additional vehicular movement? .,_ x _ Discussion: Operation of the proposed church facilities will increase the number of trips generated by the site. However, the City's Traffic Division has analyzed the project and has indicated that the arterials in the vicinity can adequately accommodate the additional trips generated by proposed buildout and operation of the 400 seat, 16,550 square foot sanctuary and 8,597 square feet of education/office facilities. The Traffic Division has indicated that the church facility's weekday uses are minimal and will not significantly effect weekday traffic circulation in the area; furthermore, since the majority of trips will be generated on weekends when traffic volumes on the surrounding arterials are typically lower, the proposed facilities are not anticipated to significantly impact weekend traffic circulation. Higher numbers of trips are expected during religious holidays, such as Easter and Christmas when the applicant anticipates one additional service will be held (two total); however, no significant impact is anticipated. Environmental Checklist -5- (9586d) Yes Maybe No b. Effects on existing parking facilities, or demand for new off-site parking? Discussion: The project will be required to comply with Article 960 of the Huntington Beach Ordinance Code which requires that all parking be provided on-site. c. Substantial impact upon existing transportation systems? -X Discussion: As discussed above, under item 13a, the additional vehicle trips are not anticipated to substantially impact the existing transportation system. No significant impact is anticipated. d. Alterations to present patterns of circulation or movement of people and/or goods? - -X Discussion: The project proposes using existing curb cuts to access the site. No substantial alterations to the circulation system are proposed. No significant impact is anticipated. e. Alterations to waterborne, rail or air traffic? f. Increase in traffic hazards to motor vehicles, bicyclists or pedestrians? X X Discussion: Due to the presence of construction traffic, the project may result in an increased number of obstacles to vehicles, bicyclists and pedestrians during the construction phases of the project. However the hazards are short-term and are not anticipated to be substantial. Furthermore, standard conditions of approval require that adequate warning signage for vehicles, bicyclists and pedestrians. 14. Public Services. Will the proposal have an effect upon, or result in a need for new or altered governmental services in any of the following areas: a. Fir- protection? b. Police protection? Discussion (a-b): Police and Fire Service are currently operating at an adequate level of service and will not require any additional manpower or facilities to serve the proposed project. c. Schools? Discussion: No schools will be affected by the proposed project. d. Parks or other recreational facilities? Discussion: The project will not impact any parks or other recreational facilities. e. Maintenance of public facilities, including roads? Discussion: No new public improvements will be required for the proposed project; therefore, no additional maintenance will be required as result of the proposed project. f. Other governmental services? Discussion: No additional governmental services will be required to serve the project. X X X Environmental Checklist -6- (9586o Ygi Mavbe No Energy. Will the proposal result in: a. Use of substantial amounts of fuel or energy? b. Substantial increase in demand upon existing source of energy, or require the development of sources of energy? Discussion (a-b): See 9(a-b). 16. Utilities. Will the proposal result in a need for new systems, or substantial alterations to the following utilities: X X a.Power or natural gas?X b.Communication systems? c.Water?x d.Sewer or septic tanks?X e.Storm water drainage?X f.Solid waste and disposal?X Discussion (a-f): All utilities are currently available to the site and can adequately accommodate the proposed project. No additional facilities will be required to serve the proposed project. i1. Human Health. Will the proposal result in: 18. a.Creation of any health hazard or potential health hazard (excluding mental health)?- - -K- b.Exposure of people to potential health hazards?X Aesthetics. Will the proposal result in the r the public, or will the proposal result in thr: open to public view? ;ruction of any scenic vista or view open to -eation of an aesthetically offensive site X Discussion: The project site does not provide any view opportunities; the proposed project is not anticipated to create an aesthetically offensive site. The parking structure will not exceed 9 feet in height and will not be visible over the perimeter wall. Taller structures will be separated from adjacent residences by the parking structure. No significant impact is anticipated. 19. Recreation. Will the proposal result in an impact upon the quality or quantity of existing recreational opportunities? Discussion: See 14d. 20. Cultural Resources. a. Will the proposal result in the alteration of or the destruction of a prehistoric or historic archaeological site? b. Will the proposal result in adverse physical or aesthetic effects to a prehistoric or historic building, structure, or object? Environmental Checklist -7- X r-T-- Yes Mavbe No C. Does the proposal have the potential to cause a physical change which would affect unique ethnic cultural values? d. Will the proposal restrict existing religious or sacred uses within the potential impact area? Discussion (a-d): Tha project site is not located in the vicinity of any known archaeological sites. No significant impact is anticipated. 21. Mandatory Findings of Significance. a. Does the project have the potential to degrade the quality of the environment, sub- stantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self sustaining levels, threaten to elim' a plant or animal community, reduce the number or restrict the range of a rare or enoangered plant or animal or eliminate important examples of the major periods of California history or prehistory? b. Does the project have the potential to achieve short-term, t' the disadvantage of long-term, environmental goals? (A short-term impact on the environment is one which occurs in a relatively brief, definitive period of time while long-term impacts will endure well into the future.) c. Does the project have impacts which are individually limited, but cumulatively consid- erable? (A project may impact on two or more separate resources where the impact on each resource is relatively small, but where the effect of the total of those impacts on the environment is significant.) d. Does the project have environmental effects which will cause substantial adverse effects on human beings, either directly or indirectly? x Environmental Checklist -8- (9586d) DETERMINATION n the basis of this initial evaluation: I find that the proposed project COULD NOT have a significant effect on the environment, and a NEGATIVE DECLARATION will be prepared. I find that although the proposed project could have a significant effect on the environment, there x will not be a significant effect in this case because the mitigation measures described on an attached sheet have been added to the project. A NEGATIVE DECLARATION WILL BE PREPARED. I find the proposed project MAY have a significant effect on the environment, and an ENVIRONMENTAL IMPACT REPORT is required. Date I Sign re Revised: March, 1990 F r: it of Hun in t n B h C mmunit Develo m nt De ar men Environmental Checklist -9-(9586d) /t-.. 5I2 . 19-5-i1 OM28' 04121 30-5-11 AM 35 9.511 DM S OM•II '1 16-5-I1 t5-5-71 DMil8 DM17 PRA?EC. ..,.. I a 5116 21ill 22-I-II ON. ; at 24 0 25 29-5-II - 26 t;)i DM 34 DM 33 33-5.11 OM 37 2 -5-II 25- -II D.M 31 DM 30 1-4 5-6-I1 DM4 27-5-I1 D 32 ..$4- -II 35-5 -11 36-5-I1 1 i 38 f 39, DM 40 W- -IY -- L 3-6-II "' OM 3 9-6-II 0-6-I1 DM10 DM A&L CITY OF HUNTINGTON BEACH ORANGE COUNTY CALIFORNIA '- . n -w u.e tul h x/.•x0[[pxie[IOx .[IWUlxlx[IIT Cplxp[ p1pIYxK xp [t. VICINITY MAP 2u-II I-6 -II- -y.D 2 - OM 1 U- -II 12-6-11 0 12 .DM13 p4 \ DA 14 24-6-I DM 29 ZONING INDEX MAP LEGEND 19-6-10-SECTION-TOWNSHIP- RANGE 2M22-DISTRICT MAP 22 I6-6-10 5-t6-10 D 6 DM / 7-6-10 8-6-10 DM7 DM8 18-6-l0, 17-6-10 DM20 DM19 19- -10 0 w22/ iPRAIRIEN1,I;aBEBa::prDRNC F-R(na9a: v:=:1MILONR1AVE HEILTI !a"1 1 77! Frv,s;. c; ST-LLIONI liII I(Itr !SThrA :NgCA CEUGUNLFI alVH 1 _ "hz 1a i4N PJx I 0t IWARNERAVEENVIROMMF-WrAL.ASsE33,ENTNo, 91.11HUNTINGTON BEECH PLANNING DIVISIONCR52.HUNTINGTON BEACH ATTACHMENT 3 Recommended Mitigation Measures for Environmental Assessment No. 91-11 Impact Mitigation Measure y-n l;-Operation of the church facilities will 1. increase noise generated on the site. 2. 3. The existing 9 foot high masonry wall located along the western perimeter of the site should be maintained. No outdoor music, chimes, bells, etc., should be permi tted. The parking structure should utilize textured "non-squeal" surfaces. Environmental Checklist -10- (9586d) NV7d 2I2LSYNM1 lc 3SOINNrIfviv .u3-Lal Naasorrowwy .o7$,t- 14 _--0?vars +nfl w+swwrwAe vr..uaw re wawwr avpan w•a ..uwa way, b i° ei°ki+.nrvm aiux rou aa..w. . n:n. +.un uv a ks>w'6"lamanuo vsroe --d 8041! 2=A37 M07/jcrM za'I1-1.562n...a a'm50*-411"r; Itz 11i11fitii t1 If{Ilf1}t111 Ili1111CHARLENEC'.RC.ER3R3"2 5DR1CR+2 S11 trRPlRTAEI' RLALB".GAPAREAIE'11 BNLTIIG444--i--v-+-+iA 1I 1 1rsP.w.t unP u.atlR1ub. PLEDE SC»E' LCVESDA. S.4GL_ Lc-DUSTING BUILDING DATA90 SESmBe Slory, 112,Ertl Sem.'amPARKING AREAIota Arch 289-! SLcnae:ape29e Sr (t;;;2B': Sr (::)tot: 5B 3 Sf (2.)MARQUIS ELEVATION19BOLSA CHICAPHASE I SITE/FLOOR PLANNc Mnthpllo Bran BWf.nm OrvruLean ed.. StAeXunIL9lcn 5.001 GlpnySptow..a EY pr.drl.ry.l(e. RmCraJ.OS PH- -WlO' U.E1 AllPHASE IIBD2flCA775N Or ==VVG 5M0= LPARKING STRUCTURE SECTION20 11 11PY, 1 11 1ma(.pKx-IO111 1 u1'y'h l_JJ_'n000East ElevationBoise Chica_•-----",................4........................... -..._---.-....-._..._.---._.......,West Elevation (Charlene Circlexe. M..r mar w.p rlauu,r.+.><wmiron a+b cnmnwr:gip eep, Imp.1oa.p.e ry ur.n+pp1 w Iv eppa,LOSEPH_l. M'90LLE7._A!5- -__. nlMo-emMASTER PLANELEVATIONSSouth Elevation ATTA HMENT NO. 5 ALTERNATIVE FINDIN FOR DENIAL ONDITI E ERMI N 1-17 LIMITED I N PERMI N 1-4 1. The proposed church and parking structure will not be compatible with adjacent properties because of its intensity. 2. The establishment , maintenance and operation of the church will be detrimental to the general welfare of persons residing in the vicinity due to increased noise and traffic. 3. On-site circulation is inadequate for the proposed church and have the potential of creating a congestion and circulation hazard. 4. Ingress and egress to the site has the potential of creating additional traffic impacts to the 4-:tersections along Bolsa Chica Road. 5. The location , site layout , and design of the proposed church and parking structure does not properly adapt the proposed structures to adjacent structures in a harmonious manner. FINDIN F R DE IAL - LIMITED I N PERMIT NO. 91-4: 1. Allowing the maintenance of the sign for an additional two (2) years will adversely affect other signs in the area. 2. The pi '.*)osed extension of time will be detrimental to property located in the vicinity of such sign, and will not be in keeping with the character of the surrounding area. 3. The sign in its existing location along Rolsa Chica Road may destruct pedestrian or vehicular traffic vision. 4. Due to the unique circumstances applicable to the sign , immediate alteration , removal or replacement of the sign will not result in a substantial economic hardship. (9909d-15)