Loading...
HomeMy WebLinkAboutInitial Plan; Zoning Review IPZR2010002 - Project DescriptionARCHITECTURE May 18, 2010 Hayden Beckman, Planner City of Huntington Beach 2000 Main Street Huntington Beach, CA 92648 • ••• • ••• • • •• •• • • • • • Subject:Agnes L. Smith E.S. Parking Lot Expansion NTD No. 2009-0409 Huntington Beach City School District DSA No. 04-111069 Re:24' Driveway between Agnes L. Smith E.S. and First Christian Church Huntington Beach Dear Mr. Beckman: The following is the requested narrative as required by Item 15 on the IPZR Application. a) The project includes improving queuing for pick up and drop off of students at Agnes L. Smith E.S. (Smith), expanding the parking lot with an additional 35 spaces, and removing the parking lot exit to 17`h Street from Smith, which had been opposite Aqua Drive. A new driveway passage will be created between Smith and First Christian Church Huntington Beach (FCCHB) for egress using the existing FCCHB exit. The Huntington Beach City School District and FCCHB have signed a joint use agreement (attached) allowing FCCHB access to Agnes L. Smith E.S. Parking Lot. Days of operation of the joint use parking agreement are Saturdays from 5:00 p.m. to 7:30 p.m., and Sundays 7:00 a.m. to 1:00 p.m. Other Church events that occur and require the use of the School Parking Lot are arranged as needed. b) Reason for initiating this application is for City permission for a new driveway passage between the properties of consenting owners. c) Description of surrounding uses to the north, south, east and west is as follows: Smith property on the south and west remains unchanged. The Smith property's northern boundary removes one exit onto 17th Street. The eastern boundary is altered by the new driveway passage between properties of consenting owners. The Smith parking lot expansion entrance is on Smith property, and exits via FCCHB. The new driveway displaces three (3) FCCHB parking spaces and relocates them in the additional 35 spaces gained in the parking lot expansion with the joint use parking agreement. d) Descriptions of population served by the proposed project are parents of students of Agnes L. Smith E.S. and FCCHB members. The general public is served by the reduction of exits onto 17`h Street. If you have any questions or should need additional information for the above project, please do not hesitate to contact me. Sin e , is el Director of Operations, EPG Group ME:kps cc: Jon Archibald, HBCSD Bob Ewing, First Christian Church Jay Tittle, NTD Architecture 955 Overland Court, Suite 100, San Dimas, California 91773-1718 P 909/450.2180 F 909/592.6153 www.ntd.com Lan Dieao • Los Artri,i s • „ r.rn • ,nsa4a • Pic _ni,