Loading...
HomeMy WebLinkAboutInitial Plan; Zoning Review IPZR2011008 - Signed Application40 For your convenience, you may reques an appointment to submit your entitlement application by contacting the Planning Department at 714-536- 5271 HUNTINGTON BEACH City of Huntington Beach Planning Department 2000 Main Street Huntington Beach, CA 92648 (714) 536-5271 www.surfcit -hb or /Cit De artments/Plannin GENERAL APPLICATION: Planning Commission Zoning AdministratorJa" Staff Review Design Review £r /C0.4561 Ap licant r uthorized A t (Contact Person) 020 4. %rcclorlct /`f c e-u iTt Ma' ing Address Qh '? 8D City 'State Zip Tele hone Number / / 7 -s/ 4,2-L Fax Number 71 ! - 3 2a E-mail Address Gl/ '00 e dr-i& t -n / , 3c /\ Co ar ' lc' t Holf Property Owne 5301 O/L$o Maili Address zi)u &'7 /in &C ftcj 4 City State Zi Tele hone Number 5 1ra) 79 7-1 .2$ Fax Number 5 1 ;?0?-17 E-mail Address-ft n E. 710 H e /6041 FOR OFFICIAL USE ONLY Present Zone "I ( I DIi4 General Plan Designation - - G(- S PLANNING APPLICATION NO. ENTITLEMENT $FEE 17 CASE # Coastal Develo ment Permit CDP Conditional Use Permit CUP Desi n Review DR Entitlement Plan Amendment EPA General Plan Amendment GPA Local Coastal Pro ram Amend LCPA Planned Si n Pro ram PSP Si n Code Exce tion SCE Tern ore Use Permit TUP Variance V Zonin Ma Amendment ZMA o in Text Amendment ZTA Environmental Review Flood Zone _Exempt Sec. Class_ _Assessment Req EA Coastal Area Yes- No-- Categorical Exclusion -Appeal _Non App -Exempt Sec Earthquake Fault Zone Oil District Methane District Dc Redevelopment Area Noise/CNEL Seismic Hazard Zone Scenic Corridor Military Buffer Zone -WAw Ceres ca ¢ov/olamm¢ (services) [Ownership Verification Pursuant to, Applicant Authorization -V APN Plans Notification Req -Narrative h(4 Photographs/Slides ntertainment Permit HOA approval Computer Log _, Map Book Log ,/Plans Date Stamped In Lieu of Date Received I Receipt #- I& Received by -TKJ Project Planner Distributed by Concurrent Cases Previous Cases REQUEST (Use additional page ifnecessa ry) / / / t'3i G C Q s i C L EXISTING USE:07 LOCATION AND DESCRIPTION OF PROPERTY:/ L/ • Street Address: 30 /3D/Scz A\(&7U6 0 f-4 O/ -6 • Nearest Major Intersection ,Up/ Av&7 c. / .s,'SGC (/7 CLZ. 517-td I B • Assessor's Parcel Number(s) 75-1 J .3 Lot Area: 7 ,4 . • Tract. Block:Lot: - -I, nntPro e Owners name At itG.L am the property owner of the subject property and have read and understa d all statements inclu n the filing requirements on the reverse side of this application. I hereby authorize Pnnt A ent's name V11 to act as my representative and to bind me in all matters concerning this appli Lion I hereby firm under penalty of perjury that the regoing statements, facts and attachments are true and correct I d rstand that this application for entitlement or variance enied, modified or approved with conditions and t s I condition o odifi tions must be s tisfi7d prior to issuance o i ermits. / Signature of //_/ . /L _U Prop Owner Date uthori Agent Date Cit of Huntin ton Beach Plannin Division 714.536.5271 November 15, 2011 2000 MAIN STREET CALIFORNIA 92648 DEPARTMENT OF PLANNING AND BUILDING www.huntin onbeachca. ov DG Engineering Alberto Rossel 4420 E. Miraloma Ave, Suite A Anaheim, CA 92807 ENTITLE MENT: PROJECT ADDRESS: PROPERTY OWNER: Initial Plan Zoning Review No. 2011-008 5301 Bolsa Avenue Parking Lot C The Boeing Company Wayne Holt 5301 Bolsa Avenue Huntington Beach , CA 92647 DATE RECEIVED AT ZON ING COUNTER: November 14, 2011 Buildin Division 714.536.5241 PROJECT PLANNER: Ethan Edwards, Associate Planner (714) 536-5561; Dear Applicant: Ethan.Edwards surfci -hb.or Thank you for submitting your entitlement to the City of Huntington Beach, Planning Department. The assigned Project Planner is responsible for processing your entitlement and will be responsible for the following tasks: Reviewing your entitlement for completeness; Evaluating the project for conformance with the General Plan; Reviewing plans for compliance with the Zoning Code, Design Guidelines, and applicable City Ordinances; Preparation of environmental documents pursuant to the California Environmental Quality Act (CEQA); Analyzing the site plan layout and, if applicable, the floor plans and elevations; Evaluating the project for compatibility with, and potential impacts to, surrounding uses/structures; Coordinating issues related to the Fire Dept., Public Works Dept., Building Division, etc.; Obtaining other City department's comments relative to the project; Coordinating any necessary community meetings; Preparing a staff report and recommendation (approval/denial) with suggested findings and conditions of approval Scheduling the project for a public hearing; and Assisting you with any follow-up actions and/or conditions of approval. Entitlement Page Two Please be advised that a Notice of Filing Status letter will be sent to you regarding the status/completeness of your entitlement(s) notifying you of the pending hearing date within 30 da s of receipt of the entitlement(s) at the zoning counter. The letter will indicate one of the following circumstances: Entitlement Deemed Incomplete ; additional information is required (e.g., revised plans, supplemental plans, environmental information, additional entitlements, etc.); or Entitlement Deemed Complete; the Project Planner is continuing to process your entitlement(s) and you will be notified as to when your project will be scheduled for a hearing by (1) the Design Review Board, (2) the Zoning Administrator, or (3) the Planning Commission. The three scenarios listed below are the subsequent steps to the above notification: If the project is subject to Planning Commission review, a staff report with a full analysis of the proposal will be prepared. Your plans and supplemental information will be attached to the staff report. A copy of the staff report will be mailed to you prior to the hearing; If the project is scheduled for Zoning Administrator review, an executive summary with staffs recommendation for the project will be prepared. A copy of the executive summary will be mailed to you prior to the hearing; If the project is scheduled for Design Review Board action, no staff report will be prepared, however staff will advise you of the staff recommendation prior to the meeting. Generally, the complete processing time from submittal to final action by the reviewing body and expiration of the appeal period is as follows: Design Review Board : 30-45 days (dependent upon the complexity of your project) Zoning Administrator : 2-3 months (dependent upon the complexity of your project) Planning Commission : 4-6 months (dependent upon the complexity of your project) Please note : When Zone Changes, General Plan Amendments, Tentative Maps, or preparation of environmental documents are involved, additional processing time is necessary. Please direct your questions and communications to the assigned Project Planner. If you have any subsequent comments or need additional clarification, please contact me at 714-536-5271. Thank you in advance for your interest in Huntington Beach - we look forward to working with you! Sin rely, Herb Fauland Planning Manager xc: Property Owner Project File