HomeMy WebLinkAboutLot Line Adjustment LLA1989006 - Signed Application0
.JJ
1'UNT11 ETON BEACH
SUBDIVISION APPLICATION:
;- Planning Commission
Zoning Administator
James M . Righeimer
Applicant or Authorized Argent
,4 v c7
10101 Slater Ave. #102,FoLitainValley
Mailing Address
714 963-5568
Telephone Number
City-of Huntington Beach
be^artent of Community Development
20O0=llai n Street
Huntington Beach, CA 92615
(714) 536-5271
C 'S'-0--2 DM'r nt Z '2seoner
Property Owner
suite 210
5772 Bolsa Ave. Huntington Beach, QA- -<-'
Mailing Address 9264 Si
Mailing Address
Engineer
139 E. Alton Ave..
Santa And,, CA 92707
hailing Address
7 54-1510
Tiel pnhono Number
General Plan Designation
-EN TITLEMENI
T'entati,re P i re Mai'
,Centatiyfl Tr gt.?dI _
crt Line di-u$trer E
onmental
.,Exempt ND_.,..._.
EIR ...,.._.,.:_...
Coastal Area.; Yes-,
._w.,. .Exempt CO
,.,Cates rival
FAA Zone
Flood Zone
Oil District
Redevelopment Areal4lquist Priolo Area
ppl cant cf AuthorizatiO m I Receipt
ap.s
Concur'ren,tN i-
Frpvl olls +_;a)50
itiais Pr jest f'l arni>r
REQUEST:
L7bl ect r?i , 1 sl wid e_ The second .,.1ot ..,T G ]t37
like to move the lot line between the er e 1fl " e
40-feet wide.
LOCATION OF PROPERTY
o Street address;1615 and 1617 Iii11crest
o Name and distance to nearest i ntersecting street:
LEGAL DESCRIPTION,
o Assessor's Parcel Number
o Tract- 10218
o Scction
o Acreage
submittal of thy' map and prior to issuance of building permits. i hereby authorize
denied, mod? Fi ed or approved with conditions and that such conditions m;;;zr be corapl i ed with prior
owner of the subject property. Irtereby affirm under penalty o; perjury' that the foregoing statements,
facts, and attachments are true and correct, r understand that tnis application for subdivision may be
Please Print Your i*ame
statements including the filing requirements on the reverse side of this application,. I am the property
James M. Ri heimer
concerning this application.
Signature of
Prooerty OwnJong ua nacnae1,v
Angus Petroleum
R { TREO OF ALL tPPLrCATIONS:
This application rnust be typed or printed and filed in cctrpletrly
act on his behalf and sign this aprxl icatien.
If the applicant is not the property cwner,,* "t: te" p -opryr
3. Tentative Parcel Maps require six (6) cop es iaf the to,,tahv r'zap and Lot L-ir'c: Au, rstmen s rep,
'v (6) copies on the prescribed form available at t8ro 2>niraati r =2oter;,which s10l be stubs:f-. _ review and approval by the Zoning Administrator.
4. Tentative Trac t maps require twenty (20) 1
6. Photographs of the subject property.
for review and approval by the Planning "otmiiiSsin
map drawn to a scale not less than one .nch e u
Fold all urans to a maxi mlum size of dr / `._x,_...
proposed to be completed.
isposal, proposed to be made or Inb.+1.aN,: a,,- -ne
(c) Stater .;'nt of the improvements and public utiJit:,s..
d 3 .a
area, lots or lot proposed for each typo of use shat
liver ' riora;
A written narrative shall accompany this a p)iea4m_.. ar:cl
(a) Existing use or uses of the prof arty A present xi
(b) Proposed use of property , if pr: perty is .proposed
(d) Public areas proposed.
(e) Tree planting proposed,
(f) Restrictive covenants proposed.
The tentative map shall contain the folio
(b) Name and address of record owner or a+ners of said ubd
define the l ocar -urn and boundaries of the prop ,sud sub
-aa
(a) The subdivision n .me and/or aunt er°, date, north
(d) Name, business address ane number, of
prepared map of said subdivision.
(p) Elevations or contourf at interval;; or two (2)
(5) feet up to ten ( C) percent p de, and ten ( 10)
determine slope of the lard and the high arid' lbw pain
from the City Fngireer to allow greater intervals,
(f) The locations , names, widths and approximat e ;rstde or all
and locations of exi ,t ino s t reets in the prcmoscd sr.hdxvi
t t :.-.r ' r = ftr
rie'.'F :nao fr' y.urp
t 'it•ado, give fiv'=
pr , r. t grad, to
.t>
(a) Name and address of the subdivider.
thei eof.
(q) The location and n4 aracter of e"' eyist'.ng or proposed p,ah.lic .`•ii tj facilities in said
(k) If the subdivision is ,wthin a known oil field the :rap shall include the location of all
existing oil wells and appurtenances and a plan of their dsspositi.on or treatment including
abandonment , u;idercround placement, -.„reeving, fencing, landscaping, orvers'.of pumpin
units,etc. Such plan d.hall ioclyde disposition of treatment of all future wells, drill
sites , a:rd ope+'anions, Such plan ;,bail also i ncl u;i s the writt en concurrence of the oil
lessee or operator concerned
9. All decisions by the Zoning Administrator and the 'la.'r,ir-g mmissici are final awnless appealed
within ten (10) days of st :h decision an shall be in writing specifyinr4 the areas of aggrieveme,•it.
10. The approval or conditional approval of a tentative map or tentotiv{. Farce? rap shall expire
twenty-four (24) months frcm the date trto map was approved or corvd'ticnally approved. The expira-
tion f the approved or conditionally approved tentative -ap shall termi ate all proceedings. Any
subsequent subdivision of the same real property shall re iiif°C the filtnq and processing of a new
existing or proposed strect and lot lines.
(j) The outline of any exsting builrings tc remain in place and their location in reiatic
sed easements
(i) A proximate lot layour•. and approximate dimensions of each iyt and nac'+ to be numbered
adjoining and contit 4uous highways, streets and ways.
(h) The approximate wid`hs, location and purpose of all aacistin,J
contiguous to the oroposee subdivision.
map.
11. Extension on tentative maps a,
h pl TPr, ?`'rys`i 4dttirtistr3tontA
(a) The subdivider filing a tentative- map or tentative parcel rap may request an extension Of
the tentative map or tentative parcel map approval by wriften application to the Department
of Community Developmnent, such application to be filed at least thirty '; 0) da's before the
cpiration of the approved or ccnditionally approved reap. The application shall state the
reason ..s for the requested extension. In grantillc?an extension, new conditions and exactions
may be imposed and existing conditions may be revised.
(b) An exteiisien (s) or tentative map or tentative parcel map approval ar condir» coal approval
may be extended by the Zoning Administrator, Planning Commission or City Ceun.<l for a
period not to exceed %ne hoar,with a maximum of three (3) ore-year extensions of time. The
extension of time shall commence with the expiration date of t1t approved or conai- tionally
approved tentative map or tentative parcel map,The approve.:°ew date shall not extmncf mare
than five (5) years beyond the date of initial approval.
Note, Completion of this application does not presume approval Of the subdi vi r,i on . Such approval
ng s,rrm ss q = V V ,or or t e andmin stadiscretionary with the Zoning
or Cormiission may deny, rodify or approve the subdivision with co+oiwion<