HomeMy WebLinkAboutInitial Plan IPZR1998002 - Signed ApplicationHUNTINGTON PEACH
City of Huntington Beach
Department of Community Development
2000 Main Street
Huntington Beach, CA 92648
(714) 536-5271
GENERAL APPLICATION:
Planning Commission
Zoning Administrator
Staff Review
Design Review
Ai plieant or Authorized Agent
Mailing Address
14A/4..y 04R 64
City State
Telephone Number
1 /9 C D Co PAS
Property Owner
4 7-.b
purr
FOR OrFICIAL USE ONLY
Present Zone _- DM [
General Plan Designation C
Coastal Develonment Permit
Conditional Use Permit
Design Review
Entitlement Plan Amendment
General Plan Amendment
Limited Si n Permit
Planned Si n Pro rain
Prec. Phan Street All n.
S ecial Si n Permit
Tern ora Use Permit
Variance
Zoninr. Map Amendment
Zoni,i Text Amendment
Other I M t°
Environme
-Exempt
eview
See. Class
,Assessment Req.
CDP
CUP
DRB
EPA -
GPA -
LSP
PSP -
PPSA -
SSP
TUP
V -
ZMA -
ZTA -
Flood Zone
Earthquake Fault Zone
Oil District
Methane District
Redevelopment Are
Noise/CNEL
Seismic Hazard Zone
Scenic Corridor
Coastal Area Yes_No_
Categorical Exclusion
Exempt Sec.
ENTITLEMENT SFEE CASE #
Pursuant to:
10 '6 , C" .0 4l4/, ,p /t/I).Appeal. Non. App. In Lieu o
Mailing Address
Ownership VerificationO f/ / i? X39 c 9i)3
City State Zip Applicant Authorization
s-C5-9 C5 Plans
Telephone Number
REQUEST Use additional a e if necessa Notification Req.
57-Ac-i` 'r-vn/? /4R//4/ Z.o h' c`.D . 'ic
/A/CA 45't/c 6 TtJRt? 'c V? P4'.
5-PA Cc`s RCD s"rAlCY"41 //We:` e f
` 4 E S/C h' 7/I / 'oW i 169S
Existing Use., 5-//4"P/lti k`r tQ
Date Received _ 'i l-_
Received by
Project Planner
_Narrative & Hazardous
Site letter Concurrent Cases:
Photographs/Slides
Entertainment Permit
I
-Map ,Book Log Previous Cases:
p -Plans Date Stamped
LOCATION AND DESCRIPTION OF PROPERTY:
Street Address:Ici ) - I i i
i Assessor's Parcel Number:/ "3 "s-Z/-C 3
a T 13oo-rt 2 Ga<`q/
Acreage: . 7Z •4 Cke
t m L, fC
1, C-7,Q. "A// 5'/iV C Pro e Owner have read and understood all statements "rding the filing
requirements on the reverse side of this application. I am the property owner of the subject property. I Hereby affirm under
penalty of perjury that the foregoing statements, facts and attachments are true and correct, 1 understand that this application for
entitlement or variance may be denied, modif ied or approved with conditions and that such conditions or modifications must be
satisfied prior to issuance of building permits, 1 hereby authorize r0,SrW/ ?_ ktkift',A ent to act as rtiy
representative and to bind me in all matters concerning this application.
Signature of l r '
=Prop>arty Owner Dat ,,authorized Agp Date
APr'L.ICATTON RR UiREMGNTti 2omplete the following eiro_ Ind 'items rlor to pittal nnrd return this application with
your submittal)
(T)This application must be typed or printed. and filled in completely.
If the applicant is not the property owner, the property owner shall designate the applicant as the authorized agent to act on his
behalf and both shall sign this application.
3, Planning Commission, Twelve (12) preliminary site plans, floor plans and building elevations (and for new construction
submit preliminary grading plans) a maximum of 24" X 36" in size. Upon acceptance and scheduling of hearing date, two (2)
sets of plans reduced to 8-1/2" X I1" and one (1) set of plans colored to illustrate the design and development concept of the
project shall be submitted. Other plans may be required depending on the complexity of the project.
4, Zoning Administrator: Ten (10) sets of site plans, floor plans and building elevations (and for new construction submit
preliminary grading plans) a maximum of 24" X 36" in size, and one (1) set of plans reduced to 8-1/2" X I 1 ", Other plans may
be required depending on the complexity of the project,
jtaff Review or Design Review: Si (6) ets of site plans, floor plans and building elevations a maximum of24" X 36" in
size. A materials palette and colored rendering are also required for design review.
Il ;Mans shall conform to the following requirements:
(a) Draw to scale (minimum scale 1/8" or 30'), indicate scale; indicate dimensions of building and floor uses; and north
direction arrow. Plans shall be oriented so that north is at the top of the page.
(b) Plot the entire parcel and dimension all pertinent data such' as easements, driveways, landscaring, parking, and distances to
all property lines.
(c) Plot all existing and proposed physical features and structures on the subject property and abutting properties,
(d) Dimension to the nearest intersecting street and identify all street names,
(e) Include a legend (locate in lower right corner of the site plan) which lists the name, address, and phone number of the
recorded owner and the applicant,
(f) Identify the legal description of the subject property on the site plan.
(g) Label existing and proposed uses of each room on floor plan.
(h) Fold all plans to a maximum size of 8-1/2" X 14" (lower right corner out).
(i) Indicate colors and materials on all building elevations.
1'4J14 7, Public notification requirements for Coastal Development Permit, Variance, Conditional Use Permit, Zoning Map Amendment,
Precise Plan Street Alignment, General Plan Amendment, and Special Sign Permit (See attached sheet).
08, All Planning Commiss;gin items require photographs and slides of the subject site and surrounding properties. All other
entitlements require Ehotographs only.
9. Environmental Assessment Form if determined necessary per California Environmental Quality Act.
10.. A massing model will be required for all commercial development and for all residential developments 3f ten (10) units or
mor; (three [3] units or more in redevelopment project areas), `Minimum scale 118" or 30'.
l A written narrative of the proposed use or project shall accompany this application. The narrative shall contain the following
minimum information:
(a) Reasuns for initiating this application.
(b) Area description and population served by the proposed use of project,
(c) Description of project and services, including square footage, hours and days of operation, number of employees, and
other information as appropriate.
(d) Description of surrounding uses to the north, south, east and west.
(e) A signed statement declaring whether the project site is or is not located within a Hazardous Waste and Substancesite pursuant to Section 65962.5 of the Government Code,
12, In order to support findings for approval for a Variance answer the following questions;
(a) What exceptional circumstances apply to the subject property (including size, shape, topography, location or surroundings)
that deprive it of privileges normally enjoyed?
(b) Explain why the request will not constitute a grant of special privilege inconsistent with normal limitations,
(c) Why is this request necessary for the preservat=,n and enjoyment of one or more substantial property rights?
(d) State reasons why the granting of this request will not be materially detrimental to the public welfare,
13. If-required by the Police Department, an entertainment permit shall accompany this application.
14. Supplemental application submittal requirements (see attached sheet),
FOR YOUR INFORMATION: All entitlement decisions are final gl1ess appealed within ten (10) days of such decision.. The
appeal shall be in writing specifying the areas of aggrievement. In no case shall building permits, certificates of occupancy, or
licenses be issued until the appeal period has elapsed. All appeals shall be accompanied by a processing fee,
All applications shall become null and void if the approved use or project has not been initiated within one (1) year from the
approval date,
Other submittal information may be deemed necessary by Staff. Completion of the application does not presume approval of the
application. Such approval is discretionary with the Director, Zoning Administrator or the Planning Commission. The Zoning
Administrator or Planning Commission may deny, modify or conditionally approve the application. The Design Review `s action is
a recommendation to the Director, Zoning Administrator, or Planning Commission unless the application has been submitted for
Design Review Board final approval
g:lformslplanning\gcnappl REV, - 5/98
City of Huntington Beach
2000 MAIN STREET CALIFORNIA 92648
DEPARTMENT OF COMMUNITY DEVELOPMENT
Building
Planning
536-5241
536-5271
October 21, 1998
Joseph T. Kung
20866 E. Quail Run Dr.
Diamond Bar, CA 91789
ENTITLEMENT (S): Initial Plan, Zoning and Review 98-2
PROJECT ADDRESS: 19171 Magnolia
Huntington Beach, CA 92646
PROPERTY OWNER: ABCD Company, Ltd.
DATE RECEIVED AT
ZONING COUNTER: October 20, 1998
PROJECT PLANNER:, Victor Van Zandt
Dear Applicant:
Thank you for submitting your entitlement(s) to the City of Huntington Beach, Community
;Development Department. The Project Planner indicated above is assigned to processing your
entitlement(s). The Project Planner is responsible for:
Reviewing your entitlement{'s) for completeness;
Reviewing plans for compliance with the Zoning Code and applicable City Ordinances;
• Evaluating the project for conformance with the General Plan,
• Preparation of environmental documents pursuant to the California Environmental
Quality Act (CEQA);
• Obtaining other City department's comments relative to the project;
• Analyzing the site plan layout and, if applicable, the floor plans and elevations;
• Evaluating the project for compatibility witll, and potential impacts to, surrounding
uses/structures;
• Coordinating issues related to the Fire Dept., Public Works Dept., Building Division, etc.;
Scheduling the project for a public hearing;
Preparing a recommendation(approvaUdenial) with findings and conditions; and
2 Assisting you, with any follow-up actions and/or conditions of approval.
A letter will be sent to you regarding the status/completeness of your entitlement(s), or your
pending hearing date, within four weeks. The letter will indicate either additional information is
required (e.g., revised plans, supplemental plans, environmental information, additional
entitlements, etc.), or that the planner is continuing to process your entitlement(s) and that you
will be notified as to when your project will be scheduled for a Zoning Administrator, Planning
Commission, and/or Design Review Board hearing.
If the project is subject to Planning Commission review, a staff report will be prepared with your
maps and supplemental information attached; no written staff reports are prepared for Zoning
Administrator or Design Review Board action.
Generally, the total processing time (from submittal to final action by the reviewing body and
expiration of the appeal period) is two (2) to three (3) months for Zoning Administrator action,
four (4) to six (6) months for Planning Commission action, and one (1) month for Design Review
Board action, depending upon the complexity of your project. When Zone Changes, General
Plan Amendments, Tentative Maps, or preparation of environmental documents are involved, a
longer processing time is necessary.
Please direct all of your questions and communications to the Project Planner using the
entitlement number(s) assigned to your case. You should contact the Project Planner at
714/536-5271 to discuss any concerns you may have regarding your project. Should youhave
any comments or need additional clarification, please contact meat the same number.
Thank you.
Sincer
Scott Hess, AICP
Senior Planner
Current Planning Section
cc. Property Owner
Project File
(g:kim:form.s:entltr)