Loading...
HomeMy WebLinkAboutLot Line Adjustment LLA2008003 - Signed Application0 HUNTINGTON BEACH SUBDIVISION APPLICATION: Planning Commission Director of Planning Zoning Administrator /C 6-L /,E//V Applicant or Authorized Agent '/ OC,5:4NhJ/L-G DM e Mailing Address City 9Z,i67 I G ( 196 State Zip -oo t 536- Telephone Number Fax Number Al 60 so Property Owner 692 -1TES / - S C/PCG Mailii'nf$ Address1-fdA17_7A1'&7_e)11J B:/i< C 264 City 1 3- S ate Zip Telephone Number Fax Number Subdivider SAME Mailing Address City t/'ZC 7- State Zip Telephone Number Fax Number P f i --Sa vq e PLS 83 Engin@er.-S 0 Rv6Y°4 3¢34 Via Lido Sfe 95o Mailing Address ties off XA ci ty 94q 67 5 8030 Telephone Number RE UEST: C 2663 State Zip s /823 Fax Number M City of Huntington Beach Department of Planning 2000 Main Street Huntington Beach, CA 92648 (714) 536-5271 FOR OFFICIA L USE 0 Y Present Zone General PlanD'esignation -- DM 1 ENTITLEMENT`, FEE CASE # Tentative Tract:Ma TTM Tentative Par -el Ma -TPM - Lot Line'Ad' stment"° 2-- LLA C3$- Q Methane Zone : --Environmental;,",`.-:', Flood Zone _.Exempl='' Oil District _ Assessnient'Required Redevelopment Area% %Earthquake Fault Coastal •Area- Yes Exempt, Scenic Corridor Seismic Hazard Zone Noise/CNEL Categorical Exclusion _CDP# :...eb Qwnership.Verification Applicant Authorization Maps ' Narrative- Public`Notificatiori Preliminary-Title Report SoilsReport 2 Gars /,vr Z Received by Receipt # Project Planner LOCATION OF PROPERTY: • Street Address: if known -7 2 5 6 E/46 14 L l/ D , • Name and distance to nearest intersecting street: LEGAL DESCRIPTION: • Assessor's Par el Number : 3 / 2 (9 • Tract: I f Block: Lot: • Section : Township: Range: • Acreage: fir I,c- G Qom/ g9 Prin Pro e Owner , am the property owner of the subject property and have read and understood all statements including the filing requirements on the reverse side of this application. I hereby affirm under penalty of perjury that the foregoing statements, facts and attachments are true and correct. I understand that this application for subdivision may be denied, modified or approved with conditions and that such conditions must be complied with prior to submittal of the final map and prior to issuance of building permits. I hereby authorize Print A e t to act as my representative and to bind me in all matters concerning this application. Signature of SEE /7L77 4J Z2p Property Owner Date Auth rized Agent Date 0 IA #ff - City of Huntington Beach 2000 MAIN STREET CALIFORNIA 92648 DEPARTMENT OF PLANNING May 30, 2008 Michael Fein 714 Oceanhill Drive Huntington Beach, CA 92648 ENTITLEMENT: Lot Line Adjustment 2008-003 PROJECT ADDRESS : 17725 Beach Boulevard PROPERTY OWNER : John Gunderson 8592 Whitesails Circle Huntington Beach , CA 92646 DATE RECEIVED AT ZONING COUNTER: May 22, 2008 PROJECT PLANNER: Rami Talleh, Senior Planner, (714)374-1682; email. rtalleh@surfcity-hb org Dear Applicant- Thank you for submitting your entitlement to the City of Huntington Beach, Planning Department. The assigned Project Planner is responsible for processing your entitlement and will be responsible for the following tasks: Reviewing your entitlement for completeness; Evaluating the project for conformance with the General Plan, Reviewing plans for compliance with the Zoning Code, Design Guidelines, and applicable City Ordinances, Preparation of environmental documents pursuant to the California Environmental Quality Act (CEQA), Analyzing the site plan layout and, if applicable, the floor plans and elevations, Evaluating the project for compatibility with, and potential impacts to, surrounding uses/structures; Coordinating issues related to the Fire Dept, Public Works Dept, Building and Safety Dept, etc , Obtaining other City department's comments relative to the project, Coordinating any necessary community meetings, Preparing a staff report and recommendation (approval/denial) with suggested findings and conditions of approval Scheduling the project for a public hearing; and Assisting you with any follow-up actions and/or conditions of approval Phone 714-536-5271 Fax 714-374-1540 www surfcity-hb org Entitlement Page Two Please be advised that a Notice of Filing Status letter will be sent to you regarding the status/completeness of your entitlement(s) notifying you of the pending hearing date within 30 da s of receipt of the entitlement(s) at the zoning counter The letter will indicate one of the following circumstances Entitlement Deemed Incomplete , additional information is required (e.g, revised plans, supplemental plans, environmental information, additional entitlements, etc ), or Entitlement Deemed Complete, the Project Planner is continuing to process your entitlement(s) and you will be notified as to when your project will be scheduled for a hearing by (1) the Design Review Board, (2) the Zoning Administrator, or (3) the Planning Commission The three scenarios listed below are the subsequent steps to the above notification If the project is subject to Planning Commission review, a staff report with a full analysis of the proposal will be prepared Your plans and supplemental information will be attached to the staff report. A copy of the staff report will be mailed to you prior to the hearing, If the project is scheduled for Zoning Administrator review, an executive summary with staff's recommendation for the project will be prepared A copy of the executive summary will be mailed to you prior to the hearing; If the project is scheduled for Design Review Board action, no staff report will be prepared, however staff will advise you of the staff recommendation prior to the meeting. Generally, the complete processing time from submittal to final action by the reviewing body and expiration of the appeal period is as follows Design Review Board : 30-45 days (dependent upon the complexity of your project) Zoning Administrator : 2-3 months (dependent upon the complexity of your project) Planning Commission : 4-6 months (dependent upon the complexity of your project) Please note: When Zone Changes, General Plan Amendments, Tentative Maps, or preparation of environmental documents are involved, additional processing time is necessary Please direct your questions and communications to the assigned Project Planner . If you have any subsequent comments or need additional clarification, please contact me at 714-536-5271. Thank you in advance for your interest in Huntington Beach - we look forward to working with you! Sin rely, Herb Fauland Planning Manager xc: Property Owner Project File