HomeMy WebLinkAboutGeneral Plan Amendment GPA1990004 - Rock E Miller & Associates Traffic AnalysisU /1± 44
Rock E. Miller & Associates
K. C. Coultrup
Coultrup Development Company
13001 Seal Beach Blvd, Suite 300
Seal Beach, CA 90740
July 11, 1990
Subject: Bay Club Phase II (Your Project D-1444)
Dear Mr. Coultrup:
This letter report is submitted to provide the traffic information
necessary for the City of Huntington Beach to process an
application for a general plan amendment for your project on Warmer
Avenue at Sceptre Lane . A traffic study was previously complett:-.d
for the sits as a portion of a completed Environmental Impact
Report (EIR). The purpose of this study is to verify that the
proposed project will generate no more traffic than the project
studied in the EIR.
The proposed project is the construction of 19 attached, dwelling
units on a site of approximately 2.5 acres, net. Access to the
project is proposed off Sceptre Lane, 200 feet north of Warner
Avenue. All site traffic will use Sceptre Lane to access Warner
Avenue. Warner Avenue provides regional access to the project site
and currently carries approximately 25,000 daily vehicles in the
project vicinity.
The property site previously included a restaurant/lounge/banquet
facility. A general plan change is pending to allow the proposed
project.
Traffic Generation
Traffic Generation is the number of vehicle trips which will be
generated by the project. These trips would be measured as traffic
on the project driveway and on Sceptre Street. Traffic Generation
is forecast by utilizing the. generation rates compiled in the
Institute of Transportation Engineers publication, Tri Generation
4th Edition, published in 1987.. The appropriate land use category
is residential condominium. While the units can be considered to
be single-family detached housing, inspection of the site plan
1833 Fit Seventeenth Street, Suite/I!, Santa Ana, CA 92 70I
FAX (714) 836-5745 TEL. (714) 541-2054
U /,--/®
Rock E. Miller & Associates
K.C. Coultrup
Page 2
confirms that the development is similar to a town-house or
condominium development. There is not sufficient setback for
parking on driveways in front of garages, and guest parking is
offered in designated areas. Table 1 indicates the traffic
generation factors utilized and calculates the total traffic
generation for the proposed project.
Com arison to General Plan Amendment 82-1
The traffic generation for the project analyzed in the previous
general plan amendment was 385 trips. The proposed project will
generate 160 trips compared while the first phase of the project,
now under construction will generate 273 trips. The total project
generation is thus 433 trips. An increase of 48 trips is thus
forecast over the volume suggested in the previous general plan
amendment.
The previous development on the site was a banquet facility
occupyinf about 9000 sq. ft of floor space. The facility was not
used on a continuous daily basis, but its usage would most closely
parallel a high quality restaurant, in terms of traffic
generatioin. Application of a restaurant generation rate would
suggest that the site generated over 900 trips per day, on days
when the facility was being used.
The proposed development will generate approximately 740 trips less
than the previous banquet facility use. At the same time, the
Phase I and Phase II project will generate only 48 daily trips more
than the level forecast in 1982 for Phase I alone.
Conclusion
The proposed development of 19 dwelling units will generate 160
daily trips to and from the site. This level of traffic is
considered to be negligible, amounting to less than one percent of
the traffic level now existing on Warner Avenue adjacent to the
project site. This volume of traffic will not cause any traffic
impact at any location. The proposal is essentially comparable in
traffic generation to the land uses proposed in the 1982 General
Plan Amendment.
1833 East Seventeenth Street, Suite 111, SantaAna, CA92701
FAX (714) 836-5745 TEL. (714) 541-2054
Rock E. Miller & Associates
K.C. Coultrup
Page 3
It has been a pleasure to provide this traffic information to the
Coultrup Development Company. If you have any questions or require
any further information please contact me.
Sincerely,
Rock E. Miller, P.E.
Principal
coul.rv2
1833 East Seventeenth Street, Suite!!!, Santa Ana, CA 92701
FAX (714) 836-5745 TEL. (714) 541-2054
1
Land Use
Table 1
Traffic Generation Rates
Proposed Land Use
Daily Traffic AM Peak PM Peak
Generation Traffic Traffic
------------------------------------------------------------------------------------------------------------------------------
Residential Condominium 8.41
(trips per dwelling unit)
Project Traffic Generation
0.73 0.82
Land Use Daily Traffic AM Peak PM Peak
Generation Traffic Traffic
Residential 160 trips 14 16
19 D.U.s
Notes: D.U. -> Dwelling Unit
All traffic levels based upon equations for Residential
Condominium Land Use. Rates are obtained by dividing the total
forecast by the number of dwelling units.
Land Use
Table 2
Traffic Generation Rates
Phase I Land Use
Daily Traffic AM Peak PM Peak
Generation Traffic Traffic
Residential Condominium 7.59 0.64 0.74
(trips per dwelling unit)
Phase I Project Traffic Generation
Land Use Daily Traffic AM Peak PM Peak
Generation Traffic Traffic
Residential 273 trips 23 27
36 D.U.s
Notes : D.U. -> Dwelling Unit
All traffic levels based upon equations for Residential
Condominium Land Use. Rates are obtained by dividing the total
forecast by the number of dwelling units.
/I/14\t
Rock E. Miller & Associate
K. C. Coultrup
Coultrup Development Company
13001 Seal Beach Blvd, Suite 300
Seal Beach, CA 90740
July 11, 1990
Subject: Bay Club Phase II (Your Project D-1444)
Dear Mr . Coultrup:
This letter report is submitted to provide the traffic information
necessary for the City of Huntington Beach to process an
application for a general plan amendment for your project on Warner
Avenue at Sceptre Lane. A traffic study was previously completed
for the site as a portion of a completed Environmental Impact
Report (EIR). The purpose of this study is to verify that the
proposed project will generate no more traffic than the project
studied in the EIR.
The proposed project is the construction of 19 attached dwelling
units on a site pf approximately 2.5 acres, net. Access to the
project is proposed off Sceptre Lane, 200 feet north of Warner
Avenue. All site traffic will use Sceptre Lane to access Warner
Avenue. Warner Avenue provides regional access to the project site
and currently carries approximately 25,000 daily vehicles in the
project vicinity.
The property site previously included a restaurant/lounge/banquet
facility. A general plan change is pending to allow the proposed
project.
Traffic Generation
Traffic Generation is the number of vehicle trips which will be
generated by the project. These trips would be measured as traffic
on the project driveway and on Sceptre Street. Traffic Generation
is forecast by utilizing the generation rates compiled in the
Institute of Transportation Engineers publication, Tri Generation
4th Edition, published in 1987. The appropriate land use category
is residential condominium. While the units can be considered to
be single-family detached housing, inspection of the site plan
1833 East Seventeenth Street, Suite!!!, SantaAna, CA 92701
FAX (714) 836-5745 TEL. (714) 541-2054
Rock E. Miller & Assocfc?*
K.C. Coultrup
Page 2
confirms that the development is similar to a town-house or
condominium development . There is not sufficient setback for
parking on driveways in front of garages, and guest parking is
offered in designated areas. Table 1 indicates the traffic
generation factors utilized and calculates the total traffic
generation for the proposed project.
Comparison to General Plan Amendment 32-1
The traffic generation for the project analyzed in the previous
general plan amendment was 385 trips . The proposed project will
generate 160 trips compared while the first phase of the project,
now under construction will generate 273 trips . The total project
generation is thus 433 trips. An increase of 48 trips is thus
forecast over the volume suggested in the previous general plan
amendment.
The previous development on the site was a banquet facility
occupyinf about 9000 sq. ft of floor 'space. The facility was not
used on a continuous daily basis, but its usage would most closely
parallel a high quality restaurant , in terms of traffic
generatioin . Application of a restaurant : generation rate would,
suggest that the site generated over 900 trips per day, on days
when the facility was being used.
The proposed development will generate approximately 740 trips less
than the previous banquet facility use. At the same time., the
Phase I. and Phase 11 project will generate only 48 daily trips more
than the level forecast in 1982 for Phase I alone.
Conclusion
The proposed development of 19 dwelling units will generate 160
daily trips to and from the site. This level of traffic is
considered to be negligible , amounting to less than one percent of
the traffic level now existing on Warner Avenue 'jacent to the
project site. This volume of traffic, will not c e any traffic
impact at any location . The proposal is essential -1 comparable in
traffic generation to the land uses proposed in the 1982 General
Plan Amendment.
1833 East Seventeenth Street, Suite III, SantaAna, CA92701
FAX (714) 836-5745 TEL. (714) 541-2054
Rock E. Miller & Associates
K.C. Coultrup
Page 2
confirms that the development is similar to a town-house or
condominium development . There is not sufficient setback for
parking on driveways in front of garages, and west parking is
offered in designated areas. T Able 1 indicates the traffic
generation factors utilized and calculates the total traffic
generation for the proposed project.
Com arison to General Plan Amendment 82-1
The traffic generation for the project analyzed in the previous
general plan amendment was 385 trips . The proposed project will
generate 160 trips compared while the first phase of the project,
now under construction will generate 273 trips . The total project
generation is thus 433 trips. An increase of 48 trips is thus
forecast over the volume suggested in the previous general plan
amendment.
The previous development on the site was a banquet facility
occupyinf about 9000 sq. ft of floor s pace. The facility was not
used on a continuous daily basis , but its usage would most closely
parallel a high quality restaurant, in terms of traffic
generatioin . Application of a restaurant generation rate would
suggest that the site generated over 900 trips per day, on days
when the facility was being used.
The proposed development will generate approximately 740 trips less
than the previous banquet facility use. At the same time, the
Phase I and Phase II , project will generate only 48 daily trips more
than the level forecast in 1982 for Phase I alone.
Conclusion
The proposed development of 19 dwelling units will generate 160
daily trips to and from the site. This level of traffic is
considered to be negligible , amounting to less than one percent of
the traffic level now existing on Warner Avenue adjacent to the
project site. This volum47 of traffic will not cause any traffic
impact at any location TV' proposal is essentially comparable in
traffic generation to the .and uses proposed in the 1982 General
Plan Amendment.
1833 East Seventeenth Street, Suite III, SantaAna, CA92701
FAX (714) 836-5745 TEL. (714) 541-2054
//k/
Rock E. Miller & Associates
K.C. Coultrup
Page 3
It has been a pleasure to provide this traffic information to the
Coultrup Development Company. If you have any questions or require
any further information please contact me.
Sincerely,
Rock E. Miller, P.E.
Principal
coul.rv2
1833 East Seventeenth Street, Suite I Il, Santa Ana, CA 92701
FAX (714) 836-5745 TEL. (714) 541-2054
Land Use
------------------------------------------------------------------------------------------------------------------------------
Residential Condominium 8.41 0.73 0.82
(trips per dwelling unit)
Table 1
Traffic Generation Rates
Proposed Land Use
Daily Traffic AM Peak PM Peak
Generation Traffic Traffic
Project Traffic Generation
Land Use Daily Traffic AM Peak PM Peak
Generation Traffic Traffic
Residential 160 trips 14 16
19 D.U.s
Notes: D.U. -> Dwelling Unit
All traffic levels based upon equations for Residential
Condominium Land Use . Rates are obtained by dividing the total
forecast by the number of dwelling units.
1i
Land Use
Table 2
Traffic Generation Rates
Phase I Land Use
Daily Traffic AM Peak PM Peak
Generation Traffic Traffic
------------------------------------------------------------------------------------------------------------------------------
Residential Condominium 7.59 0.64 0.74
(trips per dwelling unit)
Phase I Project Traffic Generation
Land Use Daily Traffic AM Peak PM Peak
Generation Traffic Traffic
Residential 273 trips 23 27
36 D.U.s
Notes: D.U. -> Dwelling Unit
All traffic levels based upon equations for Residential
Condominium Land Use. Rates are obtained bi dividing the total
forecast by the number of dwelling units.
/I /I /\!t
'Rock E. Miller & Associates
K. C. Coultrup
Coultrup Development Company
13001 Seal Beach Blvd , Suite 300
Seal Beach , CA 90740
July 11, 1990
Subject: Bay Club Phase II (Your Project D-1444)
Dear Mr. Coultrup:
This letter report is submitted to provide the traffic information
necessary for the City of Huntington Beach to process an
application'for a general plan amendment for your project on Warner
Avenue at Sceptre Lane . A traffic study was previously completed
for the site as a portion of a completed Environmental Impact
Report (EIR). The purpose of this study is to verify that the
proposed project will generate no more traffic than the project
studied in the EIR.
The proposed project is the construction of 19 attached dwelling
units on a site of approximately 2.5 acres, net . Access to the
project is proposed off Sceptre Lane, 200 feet north of Warner
Avenue. All site traffic will use Sceptre Lane to access Warner
Avenue . Wari;er Avenue provides regional access to the project site
and currently carries approximately 25,000 daily vehicles in the
project vicinity.
The property site previously included a restaurant /lounge /banquet
facility. A general plan change is pending to allow the proposed
project.
Traffic Generation
Traffic Generation is the number of vehicle trips which will be
generated by the project . These trips would be measured as traffic
on the project driveway and on Sceptre Street. Traffic Generation
is forecast by utilizing the generation rates compiled in the
Institute of Transportation Engineers publication, Tri Generation
4th Edition , published in 1987. The appropriate land use category
is residential ' condominium . While the units can be considered to
be single -family detached housing, inspection of the site plan
1833 East Seventeenth Street, Suite I I I, Santa Ana, CA 92701
FAX (714) 836-5745 TEL. (714) 541-2054
Rock E. Miller & Associates
K.C. Coultrup
Page 2
confirms that the development is similar to a town-house or
condominium development. There is not sufficient setback for
parking on driveways in front of garages, and guest parking is
offered in designated areas. Table 1 indicates the traffic
generation factors utilized and calculates the total traffic
generation for the proposed project.
Comparison to General Plan Amendment 82-1
The traffic generation for the project analyzed in the previous
general plan amendment was 385 trips. The proposed project will
generate 160 trips compared while the first phas;e of the project,
now under construction will generate 273 trips. The total project
generation is thus 433 trips. An increase of 48 trips is thus
forecast over the volume suggested in the previous general plan
amendment.
The previous development on the site was a banquet facility
occupyinf about 9000 sq. ft of floor space. The facility was not
used on a continuous daily basis, but its usage would most closely
parallel a high quality restaurant, in terms of, traffic
generatioin. 7.ppl'.i,.;ation of a restaurant generation 'rate would
suggest that thc. site generated over 900 trips per day, on days
when the facility was being used.
The proposed development will generate approximately 740 trips less
than the previous banquet facility use. At the same time, the
Phase I and Phase II project will generate only 48 daily trips more
than the level forecast in 1982 for Phase I alone.
Conclusion
The proposed development of 19 dwelling units will generate 160
daily trips to and from the site. This level of traffic is
considered to be negligible, amounting to less than one percent of
the traffic level now existing on Warner Avenue adjacent to the
project site. This volume of traffic will not cause any traffic
impact at any location. The proposal is essentially comparable in
traffic generation to the land uses proposed in the 1982 General
Plan Amendment.
1833 East Seventeenth Street, Suite Ill, SantcAna, CA92701
FAX (714) 836-5745 TEL. (714) 541-2054
Rock E. Miller & Associates
K.C. Coultrup
Page 3
It has been a pleasure to provide this traffic information to the
Coultrup Developn.ent Company. If you have any questions or require
any further information please contact me.
1,
1833 East Seventeenth Street, Suite I l 1, SantaAna, CA 92701
FAX (714) 836-5745 TEL. (714) 541-2054
Sincerely,
Rock E. Miller, P.E.
Principal
coul.rv2
Land Use
Table 1
Traffic Generation Rates
Proposed Land Use
Daily Traffic AM Peak PM Peak
Generation Traffic Traffic
---------------------------------------------------------------
Residential Condominium 8.41 0.73 0.82
(trips per dwelling unit)
Project Traffic Generation
Land Use Daily Traffic AM Peak PM Peak
Generation Traffic Traffic
Residential 160 trips 14 16
19 D.U.s
Notes : D.U. -> Dwelling Unit
All traffic levels based upon equations for Residential
Condominium Land Use. Rates are obtained by dividing the total
forecast by the number of dwelling units.
Table 2
Land Use
Traffic Generation Rates
Phase I Land Use
Daily Traffic AM Peak PM Peak
Generation Traffic Traffic
------------------------------------------------------------------------------------------------------------------------------
Residential Condominium 7.59 0.64 0.74
(trips per dwelling unit)
Land Use
Phase I Project Traffic Generation
Daily Traffic AM Peak PM Peak
Generation Traffic Traffic
Residential 273 trips 23 27
36 D.U.s
Notes: D.U. -> Dwelling Unit
All traffic levels based upon equations for'Residential
Condominium Land Use. Rates are obtained by dividing the total
forecast by the number of dwelling units.
----3----