HomeMy WebLinkAboutLot Line Adjustment LLA1997001 - Signed Applicationc1
SUBDIVISION APPLICATION:
Planning Catmission
Zoning Administrator
Adams Streeter Civil En ineers Inc.'.
Applicant or Authorized Agent
15 Cot orate Park
Mailing Address
ine California 2606
714 474-2330
Telephone Number
o row Homes
Property Owner
24451 'Rid e Route #300
`Mailing Address
La una Hills California
City of Huntington Beach
Department of Community development
2000 Main Street
Huntington Beach, CA 92648
(714) 536.52.71
Present Zone
General Plan Des ignation
TT MNT
Tn iv P rel
T n iv It M
i Ad m n
Environmental
Exempt
-Environmental
Assessment Required
Coastal Area;: Yss
Exempt UP-
Methhe Zone
Flood Zone
Oil District
Redevelopment Area
Alquist Priolo Area
AQMO Zone
_„___Categorical Exclusion
_ _Ownershi1 !eri{icat on
Applicant Authorisation
-Maps
Narrative
Adams Streeter Civil En ineers Inc.
Engineer
15 Cot orate Park
Mailing Address
Irvine California 926061
M E
Telephone Number
RE VEST:
Move lot lines to accommodate new approved site plan.
LOCATION OF PROPERTY:
a,Street address: N
o..J.me and distance to nearest intersecting street:
LE A DE RIPTI N:
o Assessors ParC l Number 23-181-35
o Tract 14700 15087 15088 Block Lot
o Section Township __^`Range
o Acreage
Ta rlot Woodrow Homes wn r , have read and understood al.)
statements including the fi1'Ing requirements on the reverse side of this application. I. am the property
owner of the s'jbject property. I hereby affirm under penalty of perjury that the foregoing statements,
facts, and attachments are trued and correct. I understand that., this appiicatio"h for subdivision may be .,
denied, modified or approved with conditions and that, such conditions mus.t:be complied wits= prior to
submittal of the final reap and prior to issuance of building permits. },,hereby authorize
Adams Streeter Civil En ineers A n ` to act as my epre nta i've and to bind me in all matters
Please Print Your Name
concerning this application,
Signature of:_
Property Owner Date Authorized Agent Da e
City of Huntington Beach
0
Building 536-5241
Planning 536-5271
January 24, 1997
CALIFOR NIA 92648
DEPARTMENT OF COMMUNITY DEVELOPMENT
Adams Streeter Civil Engineers, Inc.
Dave Graves
15 Corporate Park
Irvine, CA 92606
EN ITLE ENT', LLA NO, 97-1
PR + T DDRE : TRACT NO. 14700, 1.5087, ANI) 15088
R PERT OWN, R: TAYLOR WOODROW HONffiS
DATE E EIV + D T
ZO UNTER: JANUARY 21, 1997
PROJECT PLANNER : MARX BETH BROEREN
Dear Applicant:
Thank you-far submitting your entitlement(s) to the City of Huntington Beach, Community
Development Department. The Project Planner indicated-above is assigned to processing your
entitlement(s). The Project Planner is responsible 'for:
•
Reviewing your entitlement(s)for completeness;
Coordinating issues related to the Fire Dept., Public Works Dept., Building Division, etc,;
Reviewing plans for compliance with the Zoning Code and applicable City Ordinances;
Evaluating the project for conformance with the General Plan;
Preparation of environmental documents pursuant to the California Environmental
Quality Act (CEQA);
Obtaining other City department's comments relative to the project;
Analyzing the site plan layout and, if applicable, the floor plans and elevations;
Evaluating the project for compatibility with, and potential impacts to, surrounding
uses /structures;
Scheduling the project for a public hearing;
Preparing a recommendation(approval/denial) with endings and conditions;
Assisting you with any follow-up actions and/or conditions of approval.
2000 MAIN STREET
Q
A letter willbe.sent to you regarding the status/completenetsofy ur entitlement(s), or your
pending hearing date, within four weeks. The letter will indi .ate either additional information is
required (e.g., revised plans, supplemental plans, environmentai information, additional
entitlements, etc.), or that the planner is continuing to process'your entitlement(s) and that you
will be notified as to when your project will be scheduled for a Zoning Administrator, Planning
Commission, and/or Design Review Board hearing.
If the project is subject to Planning Commission revieti a staff report will be prepared with your
maps and supplemental information. attached; no writtenstaff reports are prepared for Zoning
Administrator or Design Review Board action.
Generally, the total processing time (from submittal to final action by the reviewing body and'
expiration of the, appeal period) is two (2) to three (3) months for Zoning Administrator action,
four 4) to six (6) months for Planning Commission action, and one (1) month for Design Review
Boarut,action, depending. upon the complexity of your project. When Zone Changes, General Plan
Amendm-nents,'Tentative Maps, or"' preparation of environmental documents are involved, a longer
processing time is necessary.
Please direct all of your questions and communications to the Project Plarir er using the
entitlement number(s) assigned to your case, You should contact-the Project Planner at
7141536-5271 to discuss any concerns you may have regarding your project. Should , you have
any comments or need additional clarification, please contact me at the same number.
Thank you.
Sincerely,
Scott Hess, AICP
Senior Planner
CurrentPlanning Section