Loading...
HomeMy WebLinkAboutLot Line Adjustment LLA1983002 - Supporting DocumentsMinutes: I.B. Board of Zoning Adjustments September 14, 1983 Page Sixteen 1. The site plan dated August 26, 1983 shall be the approved con- ceptual layout. 2. The project shall comply with all rpplicable provisions of the Huntington Beach Fire and Building Code. AYES: Lipps, Evans, Poe NOES: None ABSTAIN: None LOT LINE AI 'JUSTMENT NO. 83-2 Ap1l .a l' &:w n.,..Carter To permit a lot line adjustment between Iota 5 and 7 . Subject prop- erty is located within theTownlot Specific Plan (207 9th Street), The proposal was introduced by Acting Chairman Evans. Acting Secretary Lipps informed the-4 oard Members that the applicant's request is to relocate the lot line between lot 7 and the north- easterly fifteen (15) ft. of lot 5. Further, that all provisions pursuant to the provisions of the Subdivision Map Act have been met allowing consistency with the City's General Plan. ON MOTION BY LIPPS AND SECOND BY POE, LOT LINE ADJUSTMENT NO. 83-2 WAS APPROVED WITH FINDINGS AND VOTE FOLLOWING; LOT LINE ADJUSTMENT NO. 83-2 FINDING:,.. The proposed Lot Line;'Adjustment No. 83-2 is consistent with the City of Huntington Beach General Plan. AYES: Lipps, Evans, Poe NOES: None ABSTAIN: None ADMINISTR-TIVE REVIEW NO. 83-59 (Continued from 9/07/83) Applicant: John M. Rohrig To permit a 5,470 sq. ft. industrial building. Secretary Lipps reiterated that this application, at the Board meeting of September 7rwas continued two (2) weeks to the meeting of September 21, 1.983 to allow additional time or a redesign of the applicant's plan. Subsequent to that meeting of September 7, the applicant con- tacted the Board requesting that his application be heard in one (1) week rather than two (2) weeks. Mr. Rohrig's revised plan was dis - -16- BZA 9/14/83 Minutes: H.B. Board of 2oninq Adjustments September 14, 1983 Page Sixteen The site plan dated August 26, 1,983 shall be ceptual layout. the approved con- 2. The project shall comply with all applicable provisions of Huntington Beach Fire and Building Code. AYES: Lipps, Evans, Poe NOES- None ABSTAIN: None LOT LINE ADJUSTMENT NO. 83-2 A. . _K, & Ann,_Carter the To permit a lot line adjustment between lots 5 and 7 . Subject pru'p- erty is located within the Townlot Specific Plan (207 - 9th Street). The proposal was introduced by Acting Chairman Evans. Acting Secretary Lipps informed the Board Members that the applicant's request is to relocate the lot, line between lot 7 and the north- easterly fifteen (15) ft. of lot 5. Further, that all provisions pursuant to the provisions of the Subdivision Map Act have been met allowing consistency with the City's General Plan. ON MOTION BY LIPPS AND SECOND BY POE, LOT,LINE ADJUSTMENT NO. 83-2 WAS APPROVED WITH FINDINGS AND VOTE FOLLOWING: LOT LINE ADJUSTMENT NO. 83-2 FINDING: The proposed Lot Line Adjustment No. 83-2 is consistent with the City of Huntington Beach General Plan. AYES : Lipps ; Evans, Poe NOES: None ABSTAIN: None ADMINISTRATIVE REVIEW NO. 83-59 (Continued from 9/07/83) Applicant: John M. Rohrig To permit a 5,470 sq. ft. industrial building. Secretary Lipps reiterated that this application, at the Board meeting of September 7,was continued two (2) weeks to the meeting of September 21, 1983 to allow additional time for a redesign of the applicant's plan. Subsequent to that meeting of September 7, the applicant con- tacted the Board requesting that his application be heard in one (1) week rather than two (2) weeks. mr. Rohrig's revi'ad plan was dis- -16- BZA 9/14/83 Minutes: 1f.I3. Board, of 2onin<qAdjustments September 14, 1983 Pago Fifteen 2. All signinc for the Don Jose's Restaurant shall be made to con- norm with Article 976 of the Huntington Beach Ordinance Code. 3. The restaurant and addition shall comply with all , pplicable provisions of the THunti nq'ton Beach Fire Code specifically the restaurant- and addition shall be fire sprinklered., 4. With the addition'L ,the building, creating an increase in occupancy load exceeding 150 persons, Section 10.301(A) of the Huntington Beach wire Code requires the installation of automatic sprinkler systems throughout the entire occupancy. The sprinkler plans must be submitted to the Fire Department and shall meet the requirements set forth in pamphlet 13, "Standards for the Instllation of Sprinkler Systems," NFPA, 1981 edition. 5. A landscape plan'shall be Submitted for review and approval by the Landscape Mainte.nand1e Supervisor - Public Works Depart- ment prior to issuance of building permits. AYES: Evans, Lipps, Poe NOES: None ABSTAIN; None ADMINISTRATIVE REVIEW NO. 83-60 Applicant: McDonnell Dou las To permit the addition of a 1,000 sq. ft + building to an exist- ing aerospace facility. Subject property^_is located 5301 Bolsa. Avenue (north side of street). Acting Chairman Evans introduced the proposal and stated that this request is Categorically Exempt, Class. 1, California Environmental Quality Act, 1970. Acting Secretary Lipps outlined the applicant's proposal stating that the applicant's site plan is in substantial compliance with the ordi- nance Code. The addition to building number 46S, located on corridor number 2, is to house environmental vibration and vacuum test equip- ment which IS to be located over a blacktop area constructed of metal siding outside the fire lane. ON MOTION BY LIPPS AND SECOND BY POE, ADMINISTRATIVE REVIEW NO. 83-60 WAS GRANTED WITH CONDITIONS OF APPROVAL AND VOTE FOLtOWING: q ADMINISTRATIVE REVIEW NO. 83-60 CONDITIONS OF APPROVAL: -15- BZA 9/14/83 Minutes : H.B. board of Zon inq Adjustments September 1.4, 1983 Page Seventeen tributed to the Board Members, Upon their review, it was noted that landscaping meets the Code requirements and that the applicant chose to leave the two (2) parking spaces shown on the original plan inside of the building agreeing to a one-hour fire wall and sprinkling of the building. Mr. Rohrig contended that the two (2) parking spaces were critical allowing him to meet the Code requirement for parking. It was th ,feeling of all the Board members that the applicant should meet with staff in an effort to resolve the problem with the two (2) parking spaces inset in the building, felt to possibly create a pre- cedent for other applications. The applicant agreed to' a one (1) week continuance. ON MOTION BY LIPPS AND SECONt) 13Y EVANS, ADMINISTRATIVE REVIEW NO. 83-59 WAS CONTINUED ONE (1) WEEK, TO THE MEETING OF SEPTEMBER 21, 1983, BY TIME FOLLOWIN VOTE: AYES: Lipps, Evans, Poe NOES: None ABSTAIN: None THERE BEING NO OTHER BUSINESS, THE MEETING WAS ADJOURNED. Walter Lipps, Acting Secretary Board of Zoning Adjustments -17- I3ZA 9/14/83 CITY OF HUNTIN iTt)h F - _,H I)EVEI.OPbiā‚¬ 1 SE 1UV1a.b GLPAFz1M4 PST P 0. BOX 190 HuntingtonZcotn, GA 9254; Tel 17141 536 5271 NOTICE OF EXEMPTION Ten Secretary for Resources 1416 Ninth S treet , Room 1311 Sacramento, California 95814 County Clerk County of LOT LINE ADJUSTMENT NO. 83.2 FROM; Project Title 207-9th Street (north side of street) oject ocation ;,peci Ic Huntington Beach Orange Project Location-City Project Location-Comity To permit a lot line adjustment between lots 5 and 7. Description of Nature, Purpose, and Beneficiaries of Project Board of Zo,iing Adjustments Name o lic gency pprov ng oject Donald M. & Ann Carter Name of erson or Agency Carrying Out Project Exempt status: Ministerial (Sec. 15073) Declared Emergency (Sec. 15071 (a)) Emergi rcv Project (Sec. 15071 (b) and {c) Categc; ,;Ai Exemption.Sec, Class. t S easons w y project is exempt; Contact erson Area Co e Telephone Extension IT eTe ~6y app icant: 1. Attach certified document of exemption finding. 2, Has a notice of exemption b¢en flied by the public agency approving the project ? Yes 'No Date Received for Filing itle DEVELOPMENT REVIEW RE;iEST TOx v,_Evans,Smith, Vogelsang, Vincent FROM:Glen Godfrey Ext.COMMENTS : (Use Attache nts if September 12, 1983 necessary)DATE: PETITION(s):L.L.A. NO.-83-2 REQUEST(s): To permit a lot line adjus ent between lots 5 and 7. LOCATION:207-9th Street (north side of street) REVIEW AREAS E;phasize Standard Ana?ysis Review 0 0 0 C a PUBLIC WORKS Adnunistrati.on/ Policy Develont Sewer Water Traffic L?sign Tree and Landscape Otter FIRE BUILDING PARKS AND REC. OTHER: Please submit-, yqur concerns and recommended solutions in writinq on or before Interdepartmental Review: Final Planning Review: BZA Subdivis.ton Ccmittee: o P i 'arm ng C,cxm ission: __,_ Response submitted by: Attachments: