HomeMy WebLinkAboutAdministrative Reviews ARX1973091 - Supporting DocumentsMinutes: H.B. and of Zoning Adjustments
Wednesday , June 6, 1973
Page 21
4. There shall be no fence, structure or landscaping
constructed or maintined over 3 1/2 feet high within
a 10 ft. by 10 ft. triangular area at the, intersection
of driveways and streets or within a 25 ft. by 25 ft.
triangular area at the intersection of streets.
A
D. TO Bt-,,COMPLETED PRIOR TO ISSUANCE OF CERTIFICATE OF OCCUPANCY:
1. Water, supply shall be through the City of Huntington
Beach`s water supply system.
2. Sewage disposal shall be through the City of Huntington
Beach's sewage system.
3. Easements for utilities or walkways shall be provided
to Department of Public Works standards.
4. The property shall participate in the local drainage
assessment district.
5. No structures, other 'than those shown on the approved
plot plan, shall be constructed within the project.
6. P41 applicable City Ordinances shall be complied with.
AYES:.` Spencer, Gerarden, Eadie
NOES None
ABSENT: None
MISCELLANEOUS
` 1`DMINISTRATIVE REVIEW NO. 73-91
A licant: Frank Ca occiana
To permit the establishment of a dental office in an existing
commercial building pursuant to S . 9471.4 of the Huntington
Beach Ordinance Code located on the east side of Beach Blvd.
approximately 970 ft. south of Garfield Ave. in a C4 Highway
Commercial District.
Mr. Frank Capocciana, applicant, was present Mr. Capocciana
addressed the Board and stated that he felt the establishment
of the dental office with additional landscaping would upgrade
the area. There was a discussion on landscaping and parking
area. Thirty-four parking spaces are provi.ued with only
twenty-eight being required. Standards. of approval were dis-
cussed.
ON MOTION BY GERARDEN AND SECOND BY SPENCER ADMINISTRATIVE
REVIEW NO. 73-91 WAS APPROVED WITH THE FOLLOWING CONDITIONS
BY THE FOLLOWING ROLL CALL VOTE:
Minutes; H,B. Boar- of Zoning Adjustments
Wednesday, June 6, 1973
Page 22
A. TO BE COMPLETED PRIOR TO ISSUANCE OF BUILDING PERMITS:
1. A revised plot plan shall be submitted to the Bo;rd
of Zoning Adjustments for approval action.
2. Beach Boulevard shall be dedicated to City and `?; t
standards at the time each parcel is developed.
3. The water , sewer, and fire hydrant system shall be
approved by the Department of Public Works and Fire
Department.
B. TO BE COMPLETED PRIOR TO FRAMING INSPECTION:
1. A landscaping plan shall be submitted to the Planning
Department for review and approval action.
2. All signs for the proposed development shall be sub-
mitted to the BZA for approval. Signs shall reflect
a common theme with respect to design materials and
colors which are compatible with the architectural
theme of the proposed project.
C. TO BE COMPLETED PRIOR TO FINAL INSPECTION:
1. Beach Boulevard shall be fully improved including street
trees, street signs, street lights, fire hydra nts, sewer
and water main extensions.
6. All applicable City Ordinances shall be complied with.
Beach's sewage system.
3 Easements for utilities or walkways shall be provided
Department of Public Works standards.
4. The property shall participate in the local drainage
assessment district.
5. No structures, other than those shown on the approved
plot plan, shall be constructed within, the project.
2. All utilities shall be installed underground .
D'. TO BE COMPLETED PRIOR TO ISSUANCE OF CERTIFICATE OF OCCUPANCY:
1. Water supply shall be through the City of Huntington
Beach's water supply system.
2. Sewage disposal shall be through the City of Huntington
AYES: Spencer, Gerarden, Eadie
NOES: None
ABSENT: None