HomeMy WebLinkAboutAdministrative Reviews ARX1973128 - Supporting DocumentsAOL
HYTNTINGTON 13EAcH COMPANY
2110 MAIN STREET - PHONE (714) 666-6581
HVNTINGTON BEACH , CA7,1FORNIA 92646
July 12, 1973
Mr. Robert L. Taube
2622 Circle Drive
Newport Beach, California 92660
ADMINISTRATIVE REVIEW
AUTHORIZATION
Dear Mr. Taube:
By this letter, the Huntington Beach Company authorizes you to
act as its agent for the specific purpose of administrative review
to allow for a shopping center use on approximately 0.9 acre of
our land.
The property is located on the east side of 17th Street between
Orange and Pecan Avenues . This authorization is subject to your
advising us immediately of any conditions imposed by the City and
your obtaining our ap proval to these conditions . Such notification
must be made within 24 hours after the conditions have been imposed
in order to allow ample time for appeal, if necessary.
Very truly yours,
J. D. WALLACE
Assistant to the Vice President
RECEIVED
.IULI; 1973
PLANNING DEPT.
Minutes; H.B. Boar' of"Zoning Adjustments
Wpdnesday, August 8 973
Page 2
AYES: ierar n, Spencer, Eadie
NOES: ne
ABSENT: No
REGULAR AG DA TEMS:
ADMINISTRATIVE REVIEW NO. 73-12.8 Continued from 8/1/73)
scan : o er au e
To permit construction"of a 11,500 sq. ft. commercial building
pursuant to S.9430 of the Huntington Beach Ordinance Code
;,located on the east side of 17th Street between Pecan Avenue
and Orange Avenue in a C2 community 'business district;
•Mr. Taube and Jack Wallace, his representative, were present..,
and addressed the Board.
The Acting Secretary stated that Exemption Declaration 73-128
had been approved July 31. There was a discussion of berming
as-opposed to block wall, or the use of pilasters. Recommended
conditions of approval were discussed.The Board discussed
with applicant parking and one entry to alley near Orange Ave.
ON MOTION BY GERARDEN AND SECOND BY SPENCER ADMINISTRATIVE
REVIEW N0; 73-128 WAS APPROVED WITH THE FOLL01ING CONDITIONS
AND BY THE FOLLOWING VOTE:
1. The plot plan received July 18, 1973 shall be the approved
layout as amended,
2. A revised plot plan shall be submitted to the Board of
Zoning Adjustments for approval action. Said plan shall
delineate closure of northeasterly driveway.
TO BE COMPLETED PRIOR TO ISSUANCE OF BUILDING PERMITS:
Orange, Pecan, 17th and alley shall be dedicated tc, City
standards at the time each parcel is developed.
4 . Revised elevations, of the proposed plans shall be submitted
to the Board of Zoning Adjustments for review and approval
action.
5. The water,rrsewer,and fire hydrant system shall be approved
by the Department of Public Works and Fire Department.
Soil and compaction reports as required by the Building
Department and the ])apartment of Public Works shall be
back five (5) feet from the ed ge of such easement.
All buildings on lots abutting a City easement shal]; be set
submitted to the Ciy.
Minutes; H,B,ard of Zoning Adjustment
Wednesday, August 8,.1973
Page 3
TO BE COMPLETED PRIOR TO FRAMING INSPECTION:
1. A landscaping plan shall' be submitted to the Board of
Zoning Adjustments for review and approval action,
2. Rooftop mechanical equipment shall be screened from
view, Said screening plan shall be approved by the
Board of Zoning Adjustments.
3. All signs for the proposed development shall be sub'
mitted to the BZA for approval. Signs shall reflect
a common theme with respect to design materials and
colors which are compatible with the architectural
theme of the proposed project.
4. Fire alarm system conduit and appurtenances shall
be installed by the developer at locations and to
specifications provided by the Fire Department.
5. Parking compounds shall be screened with a combination
of fencing and landscaping. Said plan shall be submitted
to the Planning Department for review and approval.
Fencing and landscape plans shall include the following
information:
a, A list including quantities and sizes for each
species of plants and all ground cover material.
b. Irrigation layout to include meter location,
pipe sizes, sprinkler hea.d.,types, etc,
c. Fencing materials and detail drawing.
TO BE COMPLETED PRIOR TO FINAL INSPECTION:
1, Orange, Pecan, 17th and alley shall be fully improved
including street trees, street signs, street lights,
fire hydrants, sewer and water main extensions.
2. All utilities shall be installed underground.
3. Off-street parking"facilities shall conform to
Article 979.
There shall be no fence, .ystucture or landscaping
constructed or maintained over 3 1/2 feet high within
a 10 ft. by 10 ft. triangular area at the intersection
of driveways and streets or within a 25'ft. by 25 ft.
triangular area at the intersection of streets.
.' A lighting, system shall be installed within the project
'equal in illumination to lighting on public streets.
Lighting system shall be shielded to reflect away from
adjoining prof
Minutes; FI. B . Boa. d Zoning Adjustments
Wednesday, August 8, 973
Page 4
TO BE COMPLE'I'I;D PRIOR TO ISSUANCE OF CERTIFICATE OP.
OCCUPANCY:
l., Water supply shall he through the City of Huntington ik c'I's
water supply system_
Sewage disposal, shall. be through the City of Huntington Beach'
sewage system.
Easements for utilities or walkways shall be provided to
Department of Public Works standards.
The property shall participate in the local drainage assessment
district.
5. No structures , other than those shown on the approved plot
plan , shall be constructed within the project.
b, All applicable City Ordinances shall be complied with.
AYES: Gerarden , Spencer, Eadie
NOES: None
ABSENT: None
MINISTRATIVE REVIEW NO. 73-125 (Continued from /1/73)
A icant: Richard S encer'
t tI- rnn _c_tri_i .t_rin_n£ ---L -2- 1 (1(1(1 S
Minutes: Huntington ach Board of Zoning Adjustment
January 2, 1975
Page 17
MISCELLANEOUS ITEMS (CONTINUED):
ADMINISTRATIVE REVIEW NO 73-128
A licant:. Robert Tube
Board reviewed revised elevations, submitted per Condition A.4 of this
application.
ON MOTION BY SPENCER AND SECOND BY CROSBY, REVISED ELEVATIONS FOR ADM IST ATPTVT
REVIEW NO. 73-128 WERE APPROVED BY THE FOLLOW
AYES: EADIE, SPENCER, CROSBY
NOES:NONE
ABSENT: NONE
THERE BEING NO FURTHER BUSINES , THE MEETING WAS ADJOURNED.
0
UNTINGTON BEACILI COMPANY
,2110 MAIN STREET - PHONE (7 14) 536-6691
HUNTINGTON BEACH . CALIFORNIA 92646
May 12, 1975
PARKING
BEACHTOWN SHOPPING CENTER
ON 17TFI STREET
Mr. Bruce Crosby
Public Works Department
City of Huntington Beach
2000 Main Street
Huntington Beach, California 92648
Dear Mr. Crosby:
Reference the Administrative Review No. 73-128 granted august 8, 1973 and
the Negative Exemption Declaration No. 73-112 for construction of approxi-
mately 11,500, square foot Beachtown Shopping Center at 414 17th Street
(Assessor 's Parcel No. 23-153-01).
We request an alley opening for the northern-most parking area located. on
Pecan Avenue and heraby provide the City with a waiver from complaints
against neighborhood apartment dwellers for parking their vehicles in said
area. We do not believe such intermittent parking is to be an overwhelming
problem. However,. if so, we can whenever necessary take action for vehicle
removal in accordance with the Vehicle Code.
An. opening to the alley was approved for the southern-most parking area
located on Orange Avenue , thus permitting the free flow of traffic.
Customers can enter from 17th Street and exit via the alley onto Orange
Avenue.
This free flow of traffic is not possible in the bottle -neck entrance of
the north parking area Customers enter and exit onto 17th Street and oft
times will back out onto 17th Street against oncoming traffic.,
Very truly yours,
D. WALLACE
Assistant to the Vice President
17 `TRH . e 7 ` 0
6k7P' l I JG G JT 2
PLOT F'L.At 4
ISLJ' ALL-MY
plWeKi"a
212 c4g*
17 T.H. S° SfcT
Minutes: HuntinWn Beach Board of Zoning AWustments..
May 14, 1975
Page 17
ADMINISTRATIVE REVIEW NO. 73-128
A ica.it: Robert Taube --
Revision to plot plan o allow a 30', opening in the northerly
parking lot for purposes of access to the alley. Subject pro-
perty is located on. the east side of 17th Street, between Pecan
Avenue and Orange Avenue, in a C2, Community Business District.
The Board discussed the proposed revision. Board member Crosby-
stated that a letter had been submitted by the owner assuming
responsibility for parking control, and further recommended
approval of the revision.
O MOTION BY ROSBY AND SECOND BY GERA_RDEN, THE ABOVE NOTED
REVISION TO ADMINISTRATIVE REVIEW NO. 73--128 WAS APPROVED BY
THE PO LOWINGFVOTE:
AYES: COPE, CROSBY, GEP4RDEN
NOES: NONE
ABSENT: NONE
SIGNS._
Pplicant: Horn Oil Company
Re nest: Monument Sign, 38.5 squar feet
i Minutes: Huntington Beach Board of Zoning Adjustments
May 14, 1975
Page 18
COMMENDATION:
-Due to the resignation of Marti Nicely, Recording Secretary to
the Board of Zoning Adjustments., Board members extended a commenda-
tio.n for her service to the Board, as well as an expression of
appreciation and recognition for her excellent help and assistance.
ON MOTION BY COPE AND SECOND BY CROSBY, THE ABOVE NOTED COMMENDATION
WAS APPROVED BY THE FOLLOWING VOTE:
AYES: COPE, CROSBY, GERARDEN
NOES: NONE
ABSENT: NONE
THERE BEING NO FURTHER BUSINESS, THE MEETING WAS ADJOURNED.
John M. Cope
Chairman and Secretary
Board of Zoning Adjustments
AYES COPE, CROSBY, SPENCER
NO, : NONE
A ENT: NONEG
ADMINISTRATIVE REVIEW NO. 73-128
Applicant: Robert Tauber'
Approval of Landsca e Plans
The Chairman informed the Board that this application is for
approval of landscape plan in connection with Administrative
Review No. 73-128.
The Board reviewed the application and concurred on its approval.
ON MOTION BY SPENCER AND SECOND BY COPE, APPROVAL WAS GRANTED FOR
THE LANDSCAPING PLAN, DATED MAY 30, 1975, IN CONNECTION WITH ADMIN-
ISTRATIVE REVIEW NO. 73-128, BY THE FOLLOWING VOTE:
AYES: COPE, CROSBY, SPENCER
NOES: NONE
ABSENT: NONE
BZA 6-4-75 Page 14
a-6 ea
SL6t aunt
squatugsnCpV 5uzuoZ go pavog goPaH uo45uzgunH : saqnuTW
CITY OF HUN T ING TON BEACH
,INTER-DEPARTMENT COMMUNICATION
'PLANNING DEPARTMENT
Landscape plan complete
Landscape plan incomplete
30" box tree req.
32" wall req.
Landscape percentage req.
Service Sta. Stds. req.
ENGINEERING DEPARTMENT
Plan check
Landscaping Street Improvem
Plan Check "-Eng. Plan Check,
Quantity changes needed
Check specie notzd
Berm req. where iloted
Needs circulation pl°;zn
Ir`rigation plan, complete
Irrigation plan incomplete
41
TREES/LANDSCAP9'DIVISION'
Plan complete
",Landscape complete
Landscape added to plan
Irrigation complete
Irrigation added to plan
Plan incomplete
Landscape inc ompletzrr
Landscape charjg466 be made
Irrigation incomplete
Irrigation changes to be made