Loading...
HomeMy WebLinkAboutAdministrative Reviews ARX1973132 - Notice of action Letter with Findings & Conditions of ApprovalCITY OF HUnTwn T n BEACH P,1). aox 190, CALIFORNIA 92640 P 4 RING DEPT. (714) 536-5271 STANDARD CONDITIONS OF APPROVAL ADMINISTRATIVE REVIEW NO773-132 BOARD OF ZONING ADJUSTMENTS August 8, 1973 A. TO BE COMPLETED PRIOR TO ISSUANCE OF BUILDING PERMITS: 1. The plot plan received July 26, 1973 shall be the approved layout. 2, A revised Plot Plan shall be submitted to the Planning Department for Approval Action. 3. 18th Street and alley shall be dedicated to City standards at the time each parcel is developed. 4. Elevations of the proposed plan submitted to the Board of Zoning Adjustments for review and approval action July 26, 1973 shall be approved elevations., 5. The water, sewer, and fire hydrant system shall be approved by the Department of Public Works and Fire Department. 6. All buildings on lots abutting a City easement shall be set back five (5) feet from the edge of such easement. 7. Soil and compaction reports as required by the Building Department.and the Department of Public Works shall be submitted to the City, B. TO BE COMPLETED PRIOR TO'FRAMING;INSPECTION; 14 ttire alarm system conduit and appurtenances shall be installed by the developer at locations and to specifi- cations provided by the Fire Department. Parking compounds shall be screened with a combination of fencing and landscaping. Said plan shall be submitted to the Planning Department for review and approval, Fencing and landscape plans shall include the following information: AR NO. 73-132 a. A list including quantities and sizes for each species of plants and all ground cover material, b. Irrigation layout to include meter location, pipe sizes, sprinkler head types, etc. c. Fencing materials and detail drawing. TO BE COMPLETED PRIOR TO FINAL INSPECTION; 1. 18th Street and alley shall be fully improved including street trees, street signs, street lights, fire hydrants, sewer and water main extensions. 2. All utilities shall be installed underground. 3. Off-street parking facilities shall conform to Article 979. h, TO BE COMPLETED PRIOR TO ISSUANCE OF CERTIFICATE OF OCCUPANCY: 1. Water supply shall be through the City of Huntington Beach's water supply system. 2 Sewage disposal shall be through the City of Huntington Beach's sewage system. 3. Easements for utilities or walkways shall be provided to Department of Public Works standa-d:s. 4. The flood control channel shall be fenced to Flood Control District standards. 5. The property shall participate in the local drainage assessment district. 6. No structures, other than those shown on the approved plot plan, shall be constructed within the project. 7. All applicable City Ordinances shall be complied with.