HomeMy WebLinkAboutAdministrative Reviews ARX1973143 - Notice of action Letter with Findings & Conditions of Approval0. W X 150. bt,,A Pu € NI ,` 92,649
A
CONDIT IONS OI PPROVAL -
PT. 1714) 536-5 271
OF APPRt?"A).
A.; INISTFATIV.P: REVIUW N O . 73-143
BOARD OF ZONING RDJUS"MTS
AUGUST 22,: 1973
TO BE CO' PLr1'B17 PRIOR O IS U;WCU 01" BUILDING PERMITSr
1. The plot plan received August 8, 1973, a hall be the
layout..
2., T Street an 't all ey shall be dedicate
standards at the time coach parcel Is developed.
provod
a city
3. Elevations of;' the propose : plan shal l be submitted to the
Board of on sg Must r+ts for re*i aand approval action.
4. The water,seer , and flrc hydrant system shall be approved
by the Department of Publ ic Works and Fire Department.
5. All buildings on lots abutting a City easement shall be spat
back five (5) feet from the edge of such eas nt.
6. $oi1 and compaction reporttt. az required by the Building -
partment and the Departaa nt of Public Works shall be submi,ttt d
-t;o the City.
B. TO BE COMPLETED PRIOR TQ FRW4XJG INSPBCTTON $
1. Fire alarm system conduit and appurtenanctss shall be installed
by the developer at locations and to apecificaations Provided
by the``l'itre Department
TO BE coMPLE' ED PRIOR TO ;FINAL INSPLCTXONt
1.Twentieth Street and the alley shall be fully improved in--
drants , sewer and water main extensions.
eluding street trees,Street signs, street lights, fire hy -
All utilities shall be install ed. underground.
honk 73-143
Page 2
3. Off-street parking fac i lities shall conform to Article 979.
D. TO BE COMPLETED PRIOR TO ISSUANCE OP CERTXFICATE OF OCCUPANCY:
1. Water supply shall be through the City of Huntington Be4, °,
wate r supply system
2. Sewage disposal shall be throu h the City of Huntington
Beach 's sewagesyste ..
3. Easements for utilit ies or walkways shall be prov ided to
Department of Public Works standards.
4 . The property shall participate in the local drainage. assess-
ment district.
5. No structures, other than those shown on the approved plot
plan, shall be constructed within. the project.
6. All applicable"City Ordi nanc es shall be complied with.