NOTICE OF ACTION
March 5, 1975
Leonard 0 . Lindborg Al,
F 01,iOX i90-;926
PHONE (714) $34-B271}
Administrative Review No . 73-172 (E levations)
y..the .Huntington Beach Board of Zoning-Your application was et d ,. upon
iAdjus€ments °on Marc i 5,1375 -9 .
and your request Was;.
CONDITIONALLY APPROVED
CONTINUED UNTIL
WITHDRAWN }
APPROVER
DENIED
(see attached)
Under the provisions of .the Huntington. Beach Ordinance; Code, the action taken
by the Board of Zoning Adjustments; is final unless an appeal is. filed to the
Planning Commli by you or an interested party. Said appeal. racist be is
writing and must `set forth it, detail the action and, gr'.ounds by'"and upon which
the applicant ` or `interested party deems himself' aggrieved . Said appeal 'must
,be a'cccnpanied " by, a filing, fee of ce;enty -five : ($75:00) dollars and submitted
to the - Secretary of the Planning COw®ission within ten (10) days ofthe date
of the $oard°s decision.
The last day for filing an p aa1, payingt ;the filing fee fob the above
noted application is Mardi F,
Provisions of the Huntington Beach Ordinance Code- are such that any Application,
becomes null and. void one (1) year aftez >he fi ns approval , unloee actual
°'..construction bee begun.
.,Very trul y y curs,
Cope , ing Secretary
a °d of Zoning Adjustents
JC:'mW1,
Ci
c!TY ,Q1`111r d BOX 140 , CA OPTC*N 2648
P`Aj MIN O DWI. (714) $3 11
FINAL CONDITrONS\+OP APPROVAL
ADMINISTRATIVE R "VIEW NO. 73-17Z
BOARD OF ZONING A\ JUSTMENTS
October 10, 1973
Environmental.Review Board_Recommendations'''!,
The project shall be' constructed ''with fll insulation
all exterior walls and ceilings to redu'e the burden,
on heating and cooling systems (4" rthicl, Mirhera1 batts`,
or 2-3/411 thick fibergl ass Batts with io l backing)
Building spoil ,such as scraps of lumbe,wire pipes,,
and other surplus or unusable material 5h\,11. be dumped
at an off-site °solid waste disposal,site, especially
allocate&,for such use.1
Both natural gas and electricity shall be ?;,r 1lb :e `in
for clothes dryers, cooking facilities', 44,iWat\l,r heaters
and refrigerati on Units to alleviate the po,sib;le 4rain
`on any one energy source . with the concurreje of then
lica tnapp 11
TO BE 'COMFLETfiD PRi OR TO ISSUANCE OF BUILDING PE1tg1TS},j,
J -..The revised plot plan received 9/10/73 shk1 bc the
,appro ved layout.
l8th &,All ey.s 1'.all be dedicated to City statldards at the
time each parcdl i s developed..
to the Board oi;Zonl ng Adjust vents for revie+4 and appFawal
Precise Elevations- of the-proposed plan shalj! be pubmitted
acT#C1,10#C1,1011,
ter, sewer, and fire hydrant sy8tem sha 1. be approved
by the .Department of Pub-lc Works and Fire De rtment.
Soil, and compaction reports, as required by thelBuilding
Department and the De artMent of Public Works all be
submitted. to the Cityp
TO BE COk PUR D PRIOR TO FW NG 1 6P CTION t
Fire alarm systom conduit and appe: tenanco: shall be
.nst flied by the dovoiopev at icca).ons and to spot fications provided by the Fire Dopa'tment.
C. TO E' COMPLETED PRIOR TO FINAL D$P CTION.
1. 18th Street and Alloy,sMii be fully , improved iucludin ,
street tteos ,etree f ' eons, street lights , fie hydrants,
sewer and water mat., =a1 6: en tons,
20 All utilities shall,,` -installed underground.k, 4
3, off-street p rhan ,..fi .i shal l con ovm to Artie- +e 970
To BIT COMPL .TED PRIOR TO ISSUANCE aF CDR PICATE O'V fCCUPANCY:
1. Water supply shall be through . the City Of HuntingtonB 1ach's water supply system.
2. Sewage disposal shall be through the City of Bur Lin ton
Beach 's: sewage system.
3. Easements for utilities or walkwa shall be provided to
Department of Public Works standards,
4, The property ° shad participa t e in the loc 1 draite
assessment district.
No structures , other than those shown on the app
plot p.lan, shal l be constructed withi n the project.
All ` pplicable City Ordinances shall be complied with.