Loading...
HomeMy WebLinkAboutAdministrative Reviews ARX1973178 - Notice of action Letter with Findings & Conditions of ApprovalCITY OF HUfl I T- BEACH R O, BOX 190, CALIFOR141A 92648 PLANNING DEPT. `-„714) 536-5271 STANDARD CONDITIONS OF APPROVAL ADMINISTRATIVD,REVIFW NO. 73-178 .BOARD OF ZONING ADJUSTMENTS September 26,1973 A. TO BE COMPLETED PRIOR-TO ISSUANCE OF BUILDING PERMITS-: 1. The plot plan received September 17, 1973 shall be the approved layout. 2. 11th Street and alley shall be dedicated to City standards at the time each parcel is developed. 3. The water, sewer, and fire, hydrant system S1'. 11 be" approved by the Dep=artment of Public Works and Fire Department )J 4. All buildif[igs on lots abutting a City easement shall be set bark-,,,,,,five (5) feet from the edge of such easement, TO BE COMPLETED PRIOR TO FINAL'INSPECTION: 1. 11th Street and alley shall be`fully improved including street trees, .street signs„ street lights, fire hydrants," sewer and water main extensions. 2. All utilities shall be installed` underground iri:ludingservice to the existing single family dwelling and garage. 3. Water supply shall be through the City of Huntington Beach's water supply system. 4.Sewage disposal shall be through the City..of-Huntington Beach 's sewage system. Easements for utilities or walkways shall be. pr`cded to Department of Public Works standards. The property shall participate in the local drainage ,assessment dis No structures, other than those` shiown on the approved plot plan, ''shall be -constructed within 'the prt,.3ect. 3. All applicable City Ordinances shall be complie`L1 with.