Loading...
HomeMy WebLinkAboutAdministrative Reviews ARX1973184 - Notice of action Letter with Findings & Conditions of ApprovalaTY F M INIMU M BEACH P.O. BOX 190 , CALIFORNIA 92648 PLANN ING DEPT. {714) 536--15271 ,CONDITIONS OF APPROVAL ADMINISTRATIVE REVIEW NO. 73-184 November 28, 1973 A. TO BE COMPLETED PRIOR TO ISSUANCE OF"BUILDING PERMITS: 1. The revised plot plan approved by th,e Board of Zoning, Adjustments on 11/28/73 shall be. the approved layout as amended thereon. 2. Delaware Avenue shall be dedicated' /to City standards at the time such parcel is developed. 3. Elevations of the proposed plan received Oct. 3,"I973 shall be the approved elevations. 4. The water, sewer, and fire hydrant system shall be approved by the Department of Public Works and Fire Department. 5. All buildings. on lots abutting a City easement shall be set back five (5) feet from the edge of such easement. Soil and compaction reports-'as required by the Building Department and the Department of Public Works shall be submitted to the City. TO BE COMPLETED PRIOR TO FRAMING INSPECTION:, 1. A landscapingi1,,lan shall be submitted to the Planning Department for review and approval action. 2. All signs for the Proposed Development shall be submitted to the BZA for approval. The:,:,,BZA encourages signs which reflect a common theme with respect to design materials and colors which are compatible with the'architectural theme of the proposed project. 3. Fire alarm. ystem conduit and appurtenances shall be cations provided by the Fire Department. 4. Parking compounds shall be screened with a,,combination of fencing and landscaping. Said plan shall be submitted to the Planning Department for review and approval. Fencing and landscape,clans shall include. the following installed by the developer at locations anc.to specifi information: A list including quantities and sizes for each species of plants and all'ground 'cover material. Irrigation layout to include meter location, pipe sizes , sprinkler head types, etc. c. Fencing materials anddetaii drawing. 5. Division of Land #73-29 approved by the City shall be recorded. 6. A Parcel Map shall be filed with the City_:and recorded prior to framing inspection of any structures on anyparcel: C. TO BE COMPLETED PRIOR TO FINAL INSPECTION: 1 . Delaware Avenue shall be fully improved including .street trees , street signs , street lights, fire hydrants, sewer and water main extensions ..} 2. All utilities shall be installed underground. 3. Off-street parking facilities shall conform to Article 979. r1 4. There Fhall be no fence , structure or laiAdscaping constructed or maintained over 3,1/2 fee '"high within a 10 ft. by 10 ft. triangularareaat the intersection of driveways and streets or within a 25 ft. by 25 ft. triangular area at the intersecti on of streets. r" - D. TO BE COMPLETED PRIOR TO ISSUANCE OF CERTIFICATE OF, OCCUPANCY: 1. Water supply shall be'through the City of Huntington .each!s ,: water ' supply system. 2. Sewage disposal shall be through the City of Huntington Beach's sewage system. 3. Easements for.utilitiesor walkways shall be provided to Department of,'Public Works standards. 4. The property'shall participate in the local drainage • assessment district. plot plan, shall be constructed within the project. No structures 'other than , those shown on the approved All applicable City Ordinances shall be complied with. is