HomeMy WebLinkAboutAdministrative Reviews ARX1974037 - Notice of action Letter with Findings & Conditions of Approval0
1A
0
BOARD of ZOfIAG ADJJU TmEniS
CITY OF HUNTINGTON BEACH, CALIFORNIA
April 13, 1974
NOTICE OF ACTION
Applicant : Lynn & Kathy tricksen
P.O. 6OX 190.92646
PHONE (714) 536-5271
Subject: Adminiotrative Review No. 74-37
Your application was acted upon by the Huntington Beach Board
of Zoning Adjustments t,hril 10 1974
and yo..r request was:
WITHDRAWN
APPROVED
APPROVED WITH CONDITIONS XX (See Attached)
DISAPPROVED
CONTINUED UNTIL
Under the provisions of the Huntington Beach Ordinance Code, the
action taken by the Board of Zoning Adjustments is final unless
an appeal. is filed to the Planning Commission by you or an inter-
ested party. Said appeal must be in writing and must set forth in
detail the action and grounds by and upon which the applicant or
interested party deems himself aggrieved. Said appeal must be
accompanied by a filing fee of seventy-five ($75.00) dollars and
submitted to the Secretary of the Planning commission within ten
(10) days of the date of the Board's decision.
In your case , the last day for filing an appeal and paying the
filing fee is April 19, 1974
Provisions of the Huntington Beach Ordinance Code are such that
any application becomes null and void one (1) year after the final
approval , unless actual construction has started.
Very truly yours,
Dave Eadie, Secretary
Board of Zoning Adjustments
BOARDof Z fIf ADJUST EnTS
CITY OF HUNTINGTON BEACH-CALIFORNIA
P .O. Box 190.926"
PHONE (714) 536"S271
CONDITIONS OF APPROVAL
ADMINISTRATIVE REVIEW NO. 74-37
APRIL 10, 1974
A. TO BE COMPLETED PRIOR TO ISSUANCE O? BUILDING PERMITSt
1. The revised plot plan received March 27, 1974 shall
be the approved layout.
2. 16th Street and alley right-of-way shall be dedicated
to City standards at the time each parcel is developed.
3. All buildings on lots abutting a City easement shall be set
back five (5) feet from the edge of such easement.
4. Soil and compaction reports as required by the Building
Department and the Departmen, of Public Works shall be
submitted and approved by the City.
5. Easements for utilities or walkways shall be provided to
Department of Public Works standards.
B. TO BE COMPLETED PRIOR TO FINAL INSPECTION:
1. 16th St. and alley shall be fully improved including
street trees, street signs, street lights, fire hydrants,
sewer and water main extensions.
2. All utilities shall be installed underground.
3. Off-street parking facilities shall conform to Article 979..
4. Water supply shall be through the City of Huntington Beach's
water supply system
5. Sewage; disposal shall be through the City of Huntington
Beach's sewage system.
6. The property shall participate in the local d raina geassessment district. (Contact Dept. of Public Works.
7. No structures, other than those shown on the approved plot
plan, shall be constructed within the project.
E
' page 2
AR NO. 74-37
The sewer system sha l l be approved by the Department of
Public Works and Fire Department,
9. All applicable City Ordinances shall be complied with.
GENERAL
la if the developer proposes to provide air conditioning, t.
insulation in the ceilings shall be a minimum of R-19 and
that in the exterior walls shall be a minimum of R-111 if no
air conditioning is to be provided, the insulation in the
exterior ceilings shall be a minimum of R-13 and that in the
exterior walls shall be a minimum of R-7.
2. All building spoils, such as unusable lumber,wire, pipe,
and other surplus or unusable material, shall be disposed of
at an off-site facility equipped to handle them.
3. The developer shall be required at the time of construction
to stub out, for both electrical and natural gas at the location
of clothes dryers, and to stub out for natural gas only at
the locations of cooking facilities, water heating units, and
central beating units.