HomeMy WebLinkAboutAdministrative Permit APX2013006 - Signed ApplicationFor your convenience, you m v request
an appointment to submit yo
entitlement application by contacting the
Planning Department at 714-536-5271
FOR OFFICIAL USE ONLY
HUNTINGTON BEACH
City of Huntington Beach
Planning Department
2000 Main Street
Huntington Beach, CA 92648
(714) 536-5271
www.surfcit -hb.or /Cit De artments/Plannin
GENERAL APPLICATION:
11 Planning Commission
Zoning Administrator
Staff Review
Design Review
rna laht l a
Applicant or Authorized Agent (Contact Person)
Mailing Address Ck.- cam, c4 901/5
City State Zip
Tele hone Number:5 2 6 Y2-- 2 7' 5
Fax Number:
E-mail Address:a'i a n dd and -n ,7e
Property Owner
((4
ailing
1
City
Tele hone Number:
OA- gim -s
State Zip
a
Fax Number: 2-- +2- -
Present Zone
General Plan Designatio
PLANNING APPLICATION NO.
DM
Zp \3 - 603 2
ENTITLEMENT $FEE CASE #
Coastal Develo ment Permit CDP
Conditional Use Permit CUP
Desi n Revie ' DR
Entitlement-Plan Amendment EPA
General Plan Amendment GPA
Local Coastal Pro ram Amend LCPA
Planned Si n Pro * ram PSP
Si n Code Exce tion SCE
Tern or Use Permit TUP
Variance V
Zonin Ma Amendment ZMA
Zonin Text Amendment ZTA
Environmental Review
Exempt
Sec. Class
Assessment Req.
EA
Coastal Area Yes_ No_
Categorical Exclusion
Appeal. _ Non. App
Exempt Sec.
fl,q-es5,
6&'" 1 Ownership Verification
Applicant Authorization
APN
Tans
otification Req.
.,,Narrative
hotographs/Slides
Entertainment Permit
_HOA approval
/ Computer Log
v7Map Book Log
Plans Date Stamped
E-mail Address: 0A.6 °`£ 7)tv Cc 7 Tf "-
Pursuant to: f 6
In Lieu of
Date Received
Receipt #
Received byh
Project Planner
Distributed by 2 ' (mil' 13
Concurrent Cases
Previous Cases
Flood Zone X
Earthquake Fault Zonej
Oil District 11D'tEL5
Methane District 11
Redevelopment Area KO
Noise/CNEL N 0
Seismic Hazard Zone
Scenic Corridor
Residentiallnfill _tO
Military Buffer Zone Kn
N, -w ce s ca v annin (services)
REQUEST: P D eh t 01S- rs, l ! rz .J can "At-d mac- +J-
3 --Zoo viav`GWA -AlrfAZED
J _A iN --k
EXISTING USE:
LOCATION AND DESCRIPTION OF PROPERTY:
• Street Address:MI-0/(Jft-•
O G• Nearest Major Intersection: t4ec
//
• Assessor 's Parcel Number(s):l a +0 Lot Area:
• Tract :Block: Lot:
I, Print Pro ert Owner's name £ 1 G-M Tf ut's LLC_ am the property owner of the subject
property and have read and understand all statements inc uding the filing requirements on the rev se side of this application. I hereby
autho rize Print A ent's name la twLu M A vint -Me SS to act as my representative and to
bind me in all atters concerning this application. I hereby affirm under penalty of perjury that the foregoing statements, facts and
attachments are true and correct. I understand that this application for entitlement or variance may be denied, modified or approved with
conditions and that such conditions or modifications must be satisfied prior to issuance of building permits. I understand that by filing
the application, information on the application including, but not necessarily limited to the name and address will be included on public
records th are posted on the inte et.
Signature
X_Lc
bNT
t-
ropert Own ate Authorized Ag t Date
oJda
a
ENTITLEMENT NO:
APPLICANT: .
APPLICATION FORM REVIEW: ,. .
C I
PLANS:
Re uest Com lete (S ecial Permits, Variances
Pro ert Owner's Si nature or Letter of Authorization
Legal Descri tion/AP No./AP Ma
Verif Zoning
Veri General Plan (Sub-Areas & FAR)
Pro er Number of Plans
Develo ment Com liance Matrix
PLANNER:
PROJECT ADDRESS:
Photogra hs
Additional Fees Paid
Address Correct
Narrative Justification for Re uest
Cit View - Com lete
A licant's Name, Address, Tele hone Number
Entitlement No. On Plans
Com lete and internall consistent Sets Site Plan, Elevations, Floor Plans, Sections Drawin s)
Accurate, Full Dimensioned, Drawn to Scale and with North Arrow
Must include Property Lines, Street Names, Street Width, Existing and Proposed Buildings, Easements, Adjacent
Im rovements & Uses, Floor Plan
Ap licant's Name, Address, Tele hone Number
DEVELOPMENT REVIEWREQUEST SENT_ to Other.Departments _: (Tract Maps ASAP)'
See Entitlement Review Re uest List Memo EP-6R .
ENVIRONMENTAL REVIEW: •
Cate oricall Exem t I Negative Declaration
Check Mitigation Measures of Previousl a roved EIR/N.D.
COASTAL STATUS:
Not A licable
Exem t
A ealable Area
Categoricall Excluded
CONCURRENT PROCESSING (Other"Entitlements/Fees
FIELD INSPECTION:
Existing On-Site Use(s) and Adjacent Uses
Landsca in Condition/ Mature Trees
Grade Differentials with Adjoinin Lots
EIR
Non-A ealable Area
Coastal Develo ment Permit
Parkin Lot Condition/ Drivewa s/ Reci rocal Access
Illegal Structures & Additions/ Non-Conforming Signs
Fences/ Walls - Height/ Condition/ Location
PRELIMINARY PLAN CHECK (See Plan Check Sheet)
URBAN DESIGN GUIDELINES (See Desi n Review Checklist)
OTHER ISSUES: . ,
Flood Plain
Al uist-Priolo
Seismic
Hazardous Waste Site
Redevelo ment Area
Affordable Housing Plan
Easements
S ecific Plan Area
Oil Wells
Infill Lot Ordinance
DAT Meetin
Park & Rec. Fees/Re 's
Previous Entitlements and Conditions
Adjacent Entitlements and Conditions
Reci rocal Access on Adjacent Pro ert
Pro erty Maintenance Ordinance
Water ualit Management Plan
Historical
PROJECT REVIEW MEETING with Plannin Staff •
SEND FILING STATUS LETTER TO APPLICANT (and property owner', 4f different ) within 30, days.
Have meetin with A licant ' if necessar'
INFORM APPLICANT EARLY IN PROCESS OF STAFF'S RECOMMENDATION AND CONDITIONS
COMMUNITY MEETING for Major or Controversial Projects (Send Notices , include Planning Commission)
SUBDIVISION MEETING REQUIRED (Send Notices)
DESIGN REVIEW MEETING RE UIRED Materials & Color Board Send Notices)
LEGAL SERVICES RE UEST SENT (Ordinance 0 inion , Resolution , Zonin Text and Ma Amendments)
ENVIRONMENTAL ASSESSMENT COMMITTEE (Send Notices
PLANNING COMMISSION STUDY SESSION Send Notices)
OWNERSHIP MAILING LIST AND MAP ACCURACY: Verified & Most Current (Map-and Mailing labels of Owners
and/or Tenants, A plicant, Site Pro erty Owner, Agent and Matrix . ' .
SEND LEGAL NOTICES FOR PUBLIC HEARING includin Infill Lan ua e,'if a licable (with labels
- CONTINUED ON BACK SIDE -
G:\FORMS\PLANNING\Application Checklist 3b
CITY OF HUNTINGII'V BEACH
PROJECT PROCESSING CHECKLIST
(For Planning Staff Use)
PREPARE STAFF REPORT/CONDITIONS OF APPROVAL:
Prepare Attachments I J Reduced Size Plans Revised Plans
ENSURE STAFFREPORTIS DISTRIBUTED TO ALL INTERESTED INDIVIDUALS WEDNESDAYBEFORE MEETING:
Planning Commissioners (Linda Wine) Interested Parties
Applicant/Property Owner (Call to confirm they are aware of meeting and they received staff report)
LATE COMMUNICATIONS SENT TO PC, STAFF PLANNER, DIRECTOR, PLANNING MANAGER, &.
PRINCIPAL PLANNER, PUBLIC WORKS & FIRE STAFF LIAISONS, APPLICANT - (BE SURE TO MARK
EACH COMMUNICATON WITH THE AGENDA ITEM NUMBER)
PLANNING COMMISSION/ ZONING ADMINISTRATOR MEETING:
Colored Site Plans, Floor Plans and Elevations
Massing Model
Slides/Photographs
PowerPoint Presentation
After Final Meeting
NOTICE OF ACTION LETTER (WITH CONDITIONS AND CODE REQUIREMENTS) MAILED TO APPLICANT
&/ PROPERTY OWNER (INCLUDE CUSTOMER SURVEY CARD)
NOTICE OF ACTION LETTER (WITH CONDITIONS AND CODE REQUIREMENTS) LINKED TO CITYVIEW
CALL APPLICANT IF THEY DID NOT ATTEND AND/OR TO FOLLOW-UP AND ANSWER ANY QUESTIONS
FOR THEM (Customer Service)
CEQA NOTICE AND MITIGATION MONITORING FEE, if re uired
APPEALABLE DEVELOPMENT OR CATEGORICAL EXCLUSION LETTER FOR COASTAL, if a plicable
PLANS STAMPED WITH NOTED ACTION
MINUTES IN FILE
ORGANIZE ZONING FILE AND PLACE IN FILE CABINET (see De t. Policy Memo for file organization)
If Appealed
NOTIFY APPLICANT IF APPEALED BY SOMEONE ELSE.
NOTIFY OTHER DEPARTMENT'S REPRESENTATIVES.
INFORM APPLICANT / OTHER DEPARTMENTS IF STAFF RECOMMENDATION CHANGES.
NOTIFY APPLICANT / OTHER DEPARTMENTS OF SCHEDULED HEARING DATE.
G:\FORMS\PLANNING\Application Checklist 3b
HUNTINGTON OEACH
Plan Checked By
Date
Entitlement No(s),
N
CITY OF HUNTINGTON BEACH
PLANNING & BUILDING DEPARTMENT
PLANNING AND ZONING PLAN CHECK
Job Address
Telephone: (714)536-5271 or
Expiration Date
DM
Review Body: Planning Commission Zoning Administrator Design Review Board Director
Proposed Use
1. Legal Description: Lot Block Tract
2. Assessor's Parcel Number (s)
3. General Plan Designation
4. Existing Lot Size _
5.Proposed Total Building Floor Area
Plan Check No.
Plan Dated:
Zone
General Plan Sub Area Requirements
Dedication Required Yes/No (alley, confer, street) Net Lot Size
_Proposed Number Units
6. Environmental Status: Study required? Y/N Exempt (sec.
7. Coastal Zone: Y/N Appealable/Nonappealable area Exempt
class ) EA/EIR number
Categorical exclusion (sec. class
8. Special Areas (circle if applicable) Residential Infill Noise Contour Design Overlay Redevelopment Earthquake
Oil Methane Seismic Liquefaction FAA Historic
Plan Check per HB Zoning and Subdivision Ordinance and General Plan
Flood
Section 211.06 CO CG CV Additional Proposed
Provisions
Minimum Building Site
Re ulrements
(Net) Area (sq. ft.)10,000 10,000 10,000 (C)
Width(ft.)100 100 100
Minimum Setbacks
Front (ft.)10 10 (D)(E)(O)
Side (ft.)5 (F)
Street Side (ft.)10 10 (E)
Rear (ft.)5 (F)
Maximum Height (ft.)40 50 50 (F)(G)
Maximum Height (ft.) w/in 45'18 18 18
residential district
Maximum Wall Dimensions (N)
Maximum Floor Area Ratio (FAR)1.0 1.5 1.5
Minimum Site Landscaping (%)8 8 8 (H)(I)
(0)Building Design Standards
Fences and Walls (visibility)
Off-Street Parking and Loading
See Section 230.88
See Chapter 231
(J)(K)
(L)see page 2
Outdoor Facilities
Screening of Mechanical
E ul ment
Refuse Storage Areas
Underground Utilities
Performance Standards
Nonconforming Structures
Signs
Antenna
Urban Design Guidelines
See Section 230.74
See Section 230.76
See Section 230.78
See Chapter 17.64
See Section 230.82
See Chapter 236
See Chapter 233
See Section 230.80
Subject to separate plan
check
(M)
General Plan
Maximum Height
Maximum Floor Area Ratio
Noise Mitigation
Scenic/Landscape Corridor
Urban Design
Historical/Cultural
Requirements Provided
Economic
Circulation
See Page 2
COMMERCIAL
G:\PORMS\PLANNING\Plan Check - Commerciat.doc 10/26/12
NONRESIDENTIAL
Page 2
ADDITIONAL PROVISIONS
HBZSO Section
230.36 Transpo rtation Demand
Management
230.62 & 258.02 Legal Building Site
230.64 Substandard Lot
230.68 Projections into Yards
Fire lace or chimne
Cornice, eaves and ornamental
features
Mechanical e ui ment
Uncovered porches, terraces,
platforms, subterranean garages,
decks, and patios not more than 3
feet in height serving only the first
floor
Stairs, canopies, awnings and
uncovered porches more than 3
feet in hei ht
Ba windows
Balconies
Covered patios
230.76 Screening of Mechanical
Equipment
230.78 1 AB 939
230.70 Measurement of Height
CHAPTER 231 Off-street Parking
Non-residential requirement
Total required
Size
Turning Radius
Aisle Ways
Striping Detail
Wheel stops/curbs
Commercial Entrance
Turn-around Space
Bicycle Parking
Loading Space
Chapter 231.18(C) Illumination
Parking Lot Landscaping
CHAPTER 232 Signs
FAA setback & height limitation
Urban Design Guidelines
Requirements
Carpool parking; separate showers 2 per 100 employees; lockers 1 per 20 employees; bicycle parking 1 per
20 employees; passenger loading area; vanpool parking; bus stops
Yes/No Proof Required Yes/No If yes, submit copy of recorded map or Certificate of Compliance
Yes/No If yes, Conditional Use Permit approval by Zoning Administrator required
No individual projection shall exceed 1/3 of the building length, and the total of all projections shall not
exceed 2/3 of the building length on which they are located.
Front Yard Side Yard Street Side Yard Rear Yard
2.5'2.5' 30" min clearance 2.5'2.5'
3'2,5' (30" min clearance)3'3'
2'2' 30" min clearance 2' 30" min clearance 2'
6'3'4'5'
4'2' (30" min clearance)4'4'(30" min
clearance)
2.5'2.5' 30" min clearance 2.5'2.5'
3'2' 30" min clearance 3'3'
0 0 5' (max projection 1/2 width of
street side and
5'
Utility meters shall be screened from view from public ROW . Electrical transformers in front or street side
setback shall be laced underground. Backflow devices shall be not be located in front yard setback.
AB 939 requires an additional refuse storage area for recyclable material. Second refuse storage are on
site Ian or a note added to site plan indicating refuse storage area for trash and recyclables.
Dimensions shown: datum top of slab top of roof
sq.ft. _ total
sq.ft. - - total
sq.ft. - - total
sq.ft._= total
9' x 19' minimum with 7' vertical clearance
26' nonresidential; 20 ft. parallel & 2-way angled kg; 30°-14'; 45°-14'; 60°-15'; 24 ft. fire lane
20' for 0°-60° parking; 26' for 90° parking; 24' without adjacent parking; 25' for access to rear of
nonresidential bldg.
Shown per Diagram A
Adjacent to walkways, buildings, fencing, or landscaping
Required If more than 200 parking spaces; 2-24 ft. wide lanes w14'istand for 100'
3' x 3' maneuver area for dead end parking aisles less than 150'; space for aisles over 150'
Buildings up to 50,000 sq. ft. = 1 bicycle space for every 25 parking spaces required (minimum 3)
Buildings over 50.000 sq. ft. = Direct or shall determine # of bicycle spaces based on use and employees
0 space required for buildings less than 20,000 sq. ft.
1- 14' x 20' space er 20,000 sq. ft. bldg area
See Policy PP-105
3 ft. or 5 ft. wide perimeter planter; 1 tree er 10 parking spaces; other planters
Subject to separate plan check
Subject to separate plan check
REQUIRED PRIOR TO BUILDING PERMIT SUBMITTAL, ISSUANCE, ANDIOR FINAL INSPECTION
Required Item
Residential Infill Proof of Mailing
Noise Study
Reciprocal Access Easement Document
Maintenance Easement Document
Joint Use Parking Agreement
Copy of Recorded Map
Copy of Certificate of Compliance
Approval from Coastal Commission
Categorical Exclusion (Coastal) Letter
Landscape and Irrigation Plan
Lighting Plan
Grading Plan
CC&Rs Review and Approval
Elevation Certificate
Mitigation Monitoring Program
Notice of Exemption
Parkland Dedication In-lieu Fee
Downtown Specific Plan Fee
In-lieu Parking Fee
Amount/Due Date Completed
$831 per acre = $
PROVIDED
G:Fonus\P1atuning0ans Check - Page
10/26/12
0 0
Cit of Huntin ton Beach
2000 MAIN STREET CALIFORNIA 92648
DEPARTMENT OF PLANNING AND BUILDING
www.huntin tonbeachca. ov
Plannin Division
714.536.5271
March 6, 2013
Amanda Mittleman
6429 E. El Paseo Street
Long Beach, CA 90815
ENTITLEMENT: Administrative Permit 13-006
PROJECT ADDRESS : 16470 Bolsa Chica
PROPERTY OWNER: Hubbell Family, LLC
1161 Bryant Road
Long Beach, CA 90815
DATE RECEIVED AT
ZON ING COUNTER: March 5, 2013
Buildin Division
714.536.5241
PROJECT PLANNER: Kristi Rojas, Project Planner; (714)536-5253; email:
Kristi.rojas@surfeity-hb.org
Dear Applicant:
Thank you for submitting your entitlement to the City of Huntington Beach, Planning Department. The
assigned Project Planner is responsible for processing your entitlement and will be responsible for the
following tasks:
Reviewing your entitlement for completeness;
Evaluating the project for conformance with the General Plan;
Reviewing plans for compliance with the Zoning Code, Design Guidelines , and applicable City Ordinances;
Preparation of environmental documents pursuant to the California Environmental Quality Act (CEQA);
Analyzing the site plan layout and, if applicable, the floor plans and elevations;
Evaluating the project for compatibility with, and potential impacts to, surrounding uses/structures;
Coordinating issues related to the Fire Dept., Public Works Dept., Building and Safety Dept., etc.;
Obtaining other City department's comments relative to the project;
Coordinating any necessary community meetings;
Preparing a staff report and recommendation (approval/denial) with suggested findings and conditions of
approval
Scheduling the project for a public hearing; and
Assisting you with any follow-up actions and/or conditions of approval.
Entitlement
Page Two
•
Please be advised that a Notice of Filing Status letter will be sent to you regarding the status/completeness
of your entitlement(s) notifying you of the pending hearing date within 30 da s of receipt of the
entitlement(s) at the zoning counter. The letter will indicate one of the following circumstances:
Entitlement Deemed. Incomplete ; additional information is required (e.g., revised plans,
supplemental plans, environmental information, additional entitlements, etc.); or
Entitlement Deemed Complete; the Project Planner is continuing to process your entitlement(s)
and you will be notified as to when your project will be scheduled for a hearing by (1) the
Design Review Board, (2) the Zoning Administrator, or (3) the Planning Commission.
The three scenarios listed below are the subsequent steps to the above notification:
If the project is subject to Planning Commission review, a staff report with a full analysis of the
proposal will be prepared. Your plans and supplemental information will be attached to the staff
report. A copy of the staff report will be mailed to you prior to the hearing;
If the project is scheduled for Zoning Administrator review, an executive summary with staffs
recommendation for the project will be prepared. A copy of the executive summary will be
mailed to you prior to the hearing;
If the project is scheduled for Design Review Board action, no staff report will be prepared,
however staff will advise you of the staff recommendation prior to the meeting.
Generally, the complete processing time from submittal to final action by the reviewing body and
expiration of the appeal period is as follows:
Design Review Board : 30-45 days (dependent upon the complexity of your project)
Zoning Administrator : 2-3 months (dependent upon the complexity of your project)
Planning Commission : 4-6 months (dependent upon the complexity of your project)
Please note: When Zone Changes, General Plan Amendments, Tentative Maps, or preparation of
environmental documents are involved, additional processing time is necessary.
Please direct your questions and communications to the assigned Project Planner . If you have any
subsequent comments or need additional clarification, please contact me at 714-536-5271. Thank you in
advance for your interest in Huntington Beach - we look forward to working with you!
Sincerely,
ne Ja s
Acting Planning Manager
xc: Property Owner
Project File