Loading...
HomeMy WebLinkAboutAdministrative Permit APX2012011 - Project Implementation Code RequirementsG HUNTINGTON BEACH HUNTINGTON BEACH BUILDING DIVISION PROJECT IMPLEMENTATION CODE REQUIREMENTS DATE: PROJECT NAME: PLANNING APPLICATION NO. ENTITLEMENTS: DATE OF PLANS: PROJECT LOCATION: PROJECT PLANNER: PLAN REVIEWER: TELEPHONE/E-MAIL: PROJECT DESCRIPTION: SEPTEMBER 6, 2012 OFFICE TRAILER FOR OIL SEPARATION FACILITY PLANNING APPLICATION NO. 2012-155 ADMINISTRATIVE PERMIT NO. 12-011 AUGUST 28, 2012 4541 HEIL AVE ROSEMARY MEDEL, ASSOCIATE PLANNER KHOA DUONG, P.E (714) 872-6123 INSTALL OFFICE TRAILER AT AN EXISTING OIL SEPARATION FACILITY. The following is a list of code requirements deemed applicable to the proposed project based on plans stated above. The list is intended to assist the applicant by identifying requirements which must be satisfied during the various stages of project permitting and implementation. A list of conditions of approval adopted by the Planning Commission in conjunction with the requested entitlement(s), if any, will also be provided upon final project approval. If you have any questions regarding these requirements, please contact the Plan Reviewer. 1. SPECIAL CONDITIONS: None II. CODE ISSUES BASED ON PLANS & DRAWINGS SUBMITTED: 1. Provide Project Data. • Show type of building construction • Occupancy group 2. Provide compliance to disabled accessibility requirements of Chapter 11B of the 2010 CBC. 3. Review and provide compliance with Title 17, Building and Construction in the City of Huntington Beach Municipal Code. This document can be found online on the city's website. 4. The trailer must be approved or certified by State of California. 5. The footing system support the trailer must be approved by ICC, or State of California. Page 2 of 2 6.Entrance to trailer must be accessible to disabled persons - a. b. c. Stairway shall comply with Section 1133B.4 of CBC. Ramps shall comply with Section 1133B.5 of CBC Provide construction details for both stairway and ramp. 7.Please contact me or our office for a preliminary review of code analysis to examine any possible building code issues that may arise. III. COMMENTS: 1. In addition to all of the code requirements of the 2010 California Green Building Standards Code, specifically provide a Construction Waste Management Plan per Sections 4.408.2 and 5.408.1.1. 2. Planning and Building Department encourage the use of pre submittal zoning applications and building plan check meetings. • Jj G HUNTINGTON BEACH DATE: PROJECT NAME: PLANNING APPLICATION NO. ENTITLEMENTS: DATE OF PLANS: PROJECT LOCATION: PROJECT PLANNER: PLAN REVIEWER: TELEPHONEIE-MAIL: CITY OF HUNTINGTON BEACH PROJECT IMPLEMENTATION CODE REQUIREMENTS September 4, 2012 OFFICE TRAILER FOR OIL SEPARATION FACILITY PLANNING APPLICATION NO. 12-155 ADMINISTRATIVE PERMIT NO. 12-011 Au ust 28 2012 4541 HEIL (North side of Heil between Bolsa Chica and Saybrook) ROSEMARY MEDEL, ASSOCIATE PLANNER (714) 374-1684 rmedel surfcit -hb.or PROJECT DESCRIPTION: INSTALL OFFICE TRAILER AT AN EXISTING OIL SEPARATION FACILITY. Fire X Building and Safety X Planning X The following is a list of code requirements deemed applicable to the proposed project based on plans stated above. The list is intended to assist the applicant by identifying requirements which must be satisfied during the various stages of project permitting and implementation. A list of conditions of approval adopted by the Planning Commission in conjunction with the requested entitlement(s), if any, will also be provided upon final project approval. If you have any questions regarding these requirements, please contact the Plan Reviewer. PLEASE PROVIDE COMMENTS BY WEDNESDAY, SEPTEMBER 13, 2012 C HUNTINGTON BEACH DATE: PROJECT NAME: PLANNING APPLICATION NO. ENTITLEMENTS: CITY OF HUNTINGTON BEACH PROJECT IMPLEMENTATION CODE REQUIREMENTS September 4, 2012 OFFICE TRAILER FOR OIL SEPARATION FACILITY PLANNING APPLICATION NO. 12-155 ADMINISTRATIVE PERMIT NO. 12-011 RECEIVED SEP 112012 Dept.OfPlanning & Building DATE OF PLANS: PROJECT LOCATION: PROJECT PLANNER: PLAN REVIEWER: TELEPHONE/E-MAIL: Au ust 28 2012 4541 HEIL (North side of Heil between Bolsa Chica and Saybrook) ROSEMARY MEDEL, ASSOCIATE PLANNER (714) 374-1684 rmedel surfcit -hb.or PROJECT DESCRIPTION: INSTALL OFFICE TRAILER AT AN EXISTING OIL SEPARATION FACILITY. Fire X Building and Safety X Planning X The following is a list of code requirements deemed applicable to the proposed project based on plans stated above. The list is intended to assist the applicant by identifying requirements which must be satisfied during the various stages of project permitting and implementation. A list of conditions of approval adopted by the Planning Commission in conjunction with the requested entitlement(s), if any, will also be provided upon final project approval. If you have any questions regarding these requirements, please contact the Plan Reviewer. PLEASE PROVIDE COMMENTS BY WEDNESDAY, SEPTEMBER 13, 2012 r`'l(Z