August 28, 2012
Mark Blamer
Crane Architectural Group
110 E. Wilshire Avenue, Suite 300
Fullerton, CA 92832
SUBJECT: COASTAL DEVELOPMENT PERMIT NO. 12-091 ADMINISTRATIVE PERMIT
NO. 12-08 (NGUYEN THREE-UNIT DEVELOPMENT)
PROJECT IMPLEMENTATION CODE REQUIREMENTS
Dear Mr. Blumer,
In order to assist you with your development proposal, staff has reviewed the project and
identified applicable city policies , standard plans, and development and use requirements,
excerpted from the City of Huntington Beach Zoning & Subdivision Ordinance and Municipal
Codes . This list is intended to help you through the permitting process and various stages of
project implementation.
It should be noted that this requirement list is in addition to any "conditions of approval" adopted
by the Zoning Administrator. Please note that if the design of your project or site conditions
change, the list may also change.
If you would like a clarification of any of these requirements, an explanation of the Huntington
Beach Zoning & Subdivision Ordinance and Municipal Codes, or believe some of the items
fisted do not apply to your project, and/or you would like to discuss them in further detail, please
contact me at AGonzales Surfcit -hb.or or 714-374-1547 and/or the respective source
department (contact person below).
Sincerely,
Andrew Gon s
Associate Planner
Enclosures Fire Department requirements dated August 27, 2012
Public Works Department requirements dated August 23, 2012
Planning Division requirements dated August 23, 2012
Building Division requirements dated August 20, 2012
Cc: Herb Fauland, Planning Manager
Jason Kelley, Senior Planner
Mark Carnahan, Building Division
Jim Morelli, Fire Department
Josh McDonald, Public Works Department
David Dominguez, Community Services
Project File
G:\GonzaIes \CDP\CDP 12-09; AP 12-08 (502 California Street) - Nguyen Residence \Depa rtmental Comments\Code Requirements
Cover Letter.doc
HUNTINGTON BEACH
DATE:
PROJECT NAME:
PLANNING
APPLICATION NO.:
ENTITLEMENTS:
PROJECT LOCATION:
CITY OF HUNTINGTON BEACH
FIRE DEPARTMENT
PROJECT IMPLEMENTATION CODE REQUIREMENTS
PROJECT PLANNER:
PLAN REVIEWER:
TELEPHONEIE-MAIL:
PROJECT DESCRIPTION:
AUGUST 27, 2012
NGUYEN RESIDENCE
PLANNING APPLICATION NO. 12-129
COASTAL DEVELOPMENT PERMIT NO. 12-09/ ADMINISTRATIVE
PERMIT NO. 12-08
502 CALIFORNIA STREET, 92648 (NORTH SIDE OF ELMIRA AVENUE,
EAST OF CALIFORNIA STREET)
ANDREW GONZALES, ASSOCIATE PLANNER
JOE MORELLI; FIRE PROTECTION ANALYST
JOE.MORELLI SURFCITY-HB.ORG/(714) 536-5531
TO PERMIT A 284 SQ. FT. ADDITION TO AN EXISTING SINGLE-FAMILY
RESIDENCE AND CONSTRUCTION OF AN APPROXIMATELY 2,557
SQ. FT., TWO-STORY DETACHED RESIDENTIAL BUILDING
CONTAINING TWO, 663 SQ. FT. RESIDENTIAL UNITS WITHIN THE
COASTAL ZONE.
The following is a list of code requirements deemed applicable to the proposed project based on plans
received and dated August 1, 2012. The list is intended to assist the applicant by identifying
requirements which must be satisfied during the various stages of project permitting and implementation.
If you have any questions regarding these requirements, please contact the Plan Reviewer.
1) An NFPA 13D automatic fire sprinkler system is required for the 2,557 sq. ft. detached
residential building. List this requirement as a deferred submittal on any plans submitted
for approval.
2) Provide the following notes on the Building Plans under a Fire Department Notes Section:
a) A separate submittal for fire sprinklers is required. As per City Specification #420, a
fire sprinkler plan will need to be submitted to the HBFD for review and approval, a
permit issued and final inspection required. System shall be designed as per 2010
CFC, NFPA 13 & HBMC requirements.
b) Prior to HBFD approval for occupancy, all GIS data concerning the site is required to
be submitted to Leslie Edwards in the Information Services Department. Please
contact her with questions at 714-536-5697.
Page 2 of 2
c) Address numbers must be placed over the exterior of the main entrance as per City
Specification #428. Minimum size of numbers is 10", and they must contrast with
background.
d) For Fire Department inspections , call (714) 536-5411 at least 3 days in advance to
schedule inspections.
CITY OF HUNTINGTON BEACH
PUBLIC WORKS INTERDEPARTMENTAL
COMMUNICATION
PROJECT IMPLEMENTATION CODE REQUIREMENTS
DATE:
PROJECT NAME:
ENTITLEMENTS:
PLNG APPLICATION NO:
DATE OF PLANS:
PROJECT LOCATION:
PROJECT PLANNER:
TELEPHONE /E-MAIL:
PLAN REVIEWER:
TELEPHONE/E-MAIL:
AUGUST 23, 2011
NGUYEN RESIDENCE
CDP 12-09, AP 12-08
2012-0129
JULY 31, 2012
502 CALIFORNIA STREET (NEC CALIFORNIA AND ELMIRA)
ANDREW GONZALES, ASSOCIATE PLANNER
714-374-1547 /AGON7ALES SURFCITY-HB.ORG
STEVE BOGART, SENIOR CIVIL ENGINEER
714-374-1692 / SBOGART SURFCITY-HB.ORG
PROJECT DESCRIPTION: TO PERMIT A 284 SQ. FT. ADDITION TO AN EXISTING SINGLE-FAMILY
RESIDENCE AND CONSTRUCTION OF AN APPROXIMATELY 2,557 SQ. FT., TWO-STORY
DETACHED RESIDENTIAL BUILDING CONTAINING TWO, 663 SQ. FT. RESIDENTIAL UNITS WITHIN
THE COASTAL ZONE
The following is a list of code requirements deemed applicable to the proposed project based on plans as
stated above. The items below are to meet the City of Huntington Beach's Municipal Code (HBMC),
Zoning and Subdivision Ordinance (ZSO), Department of Public Works Standard Plans (Civil, Water and
Landscaping) and the American Public Works Association (APWA) Standards Specifications for Public
Works Construction (Green Book), the Orange County Drainage Area management Plan (DAMP), and
the City Arboricultural and Landscape Standards and Specifications. The list is intended to assist the
applicant by identifying requirements which shall be satisfied during the various stages of project
permitting, implementation and construction. If you have any questions regarding these requirements,
please contact the Plan Reviewer or Project Planner.
THE FOLLOWING DEVELOPMENT REQUIREMENTS SHALL BE COMPLETED PRIOR TO
ISSUANCE OF A GRADING PERMIT:
1. A Legal Description and Plot Plan of the dedications to City shall be prepared by a licensed
surveyor or engineer and submitted to Public Works for review and approval. The dedication shall
be recorded prior to issuance of a grading permit.
2. The following dedications to the City of Huntington Beach shall be shown on the Precise Grading
Plan. (ZSO 230.084A)
a. A 25 foot radius right-of-way dedication for pedestrian access and public utilities at the
intersection of California Street and Elmira Avenue per Public Works Standard Plan No. 207.
G'`•Engincrring Division\DEVELO PMENl1Conditions 2012\Califomia 502 (SFR plus 2 uniLs)V;ugust 23 20121C21ifomia 502 (CLIP 12-09) Dec
Rcquircmcnts 8-23-12
Page 2 of 4
b. 2.5 feet of additional alley dedication. This dedication will provide an alley right-of-way width
of 10 feet from alley centerline. (ZSO 230.84)
3. A Precise Grading Plan (Street Improvement Plan), prepared by a Licensed Civil Engineer , shall be
submitted to the Public Works Department for review and approval. (MC 17.051ZSO 230.84) The
plans shall comply with Public Works plan preparation guidelines and include the following
improvements on the plan:
a. The existing curb and sidewalk along the California Street frontage shall be removed and
replaced per Public Works Standard Plan Nos. 202 and 207. (ZSO 230.84)
b. An ADA compliant access ramp at the northeast corner of the California Street/Elmira Avenue
intersection shall be constructed per Caltrans Standard Plan A88A. (ZSO 230.84, ADA)
c. The existing curb and gutter along the Elmira Avenue frontage shall be removed and replaced
per Public Works Standard Plan Nos . 202 and 207. (ZSO 230.84)
d. New sidewalk along the Elmira Avenue frontage shall be constructed per Public Works
Standard Plan No. 207. (ZSO 230.84)
e. The existing driveway approach on California Street shall be removed and replaced with an
ADA compliant driveway approach per Public Works Standard Plan No. 209. (ZSO 230.84)
f. Construction of pavement for half-width of existing alley plus pavement for the 2.5 feet of
additional alley dedication. (ZSO 230.84)
g. An alley approach shall be constructed per Public Works Standard Plan No. 107. (ZSO
230.84)
h. The existing sewer lateral may potentially be utilized if it is of adequate size, conforms to
current Public Works Standards and is determined to be in serviceable condition by
submitting a video of the lateral. If the sewer is determined to be inadequate , a new sewer
lateral shall be installed, connecting to the main in the alley, per Public Works Standards.
(ZSO 230.84)
i. A new domestic water service and meter shall be installed per Water Division Standards, and
sized to meet the minimum requirements set by the California Plumbing Code (CPC) and
Uniform Fire Code (UFC). (ZSO 255.04) (MC 14.08.020)
j. The irrigation water service may be combined with the domestic water service. (ZSO 230.84)
k. Separate backflow protection devices shall be installed per Water Division Standards for
domestic water service and shall be screened from view. (Resolution 5921 and State of
California Administrative Code, Title 17)
1. The existing domestic water se rvice and meter shall be abandoned per Water Division
Standards. (ZSO 255.04)
m. With construction of the new Alley Approach, it will be necessa ry to relocate the existing Fire
Hydrant per Water Division Standards . (ZSO 255.04)
4. A soils report, prepared by a Licensed Engineer shall be submitted for reference only. (MC
17.05.150)
5. The applicant's gradinglerosion control plan shall abide by the provisions of AQMD's Rule 403 as
related to fugitive dust control. (AQMD Rule 403)
6. The name and phone number of an on-site field supervisor hired by the developer shall be
submi tted to the Planning and Public Works Departments. In addition, clearly visible signs shall be
posted on the perimeter of the site every 250 feet indicating who shall be contacted for information
G.\Engineering Division+DEVELOPN `lCcunditions 20121Calif:,rnia 502 (S1•R plus 2 uuits)1August 23 2012\California 502 (CLIP 12-09) Dev
Requirements 8-23-12
Page 3 of 4
regarding this development and any construction/grading-related concerns. This contact person
shall be available immediately to address any concerns or issues raised by adjacent property
owners during the construction activity. He/She will be responsible for ensuring compliance with
the conditions herein, specifically, grading activities, truck routes, construction hours, noise, etc.
Signs shall include the applicant's contact number, regarding grading and construction activities,
and "1-800-CUTSMOG" in the event there are concerns regarding fugitive dust and compliance with
AQMD Rule No. 403.
7. The applicant shall notify all property owners and tenants within 300 feet of the perimeter of the
property of a tentative grading schedule at least 30 days prior to such grading.
THE FOLLOWING DEVELOPMENT REQUIREMENTS SHALL BE COMPLIED WITH DURING
GRADING OPERATIONS:
8. An Encroachment Permit is required for all work within the City's right-of-way. (MC 12.38.0101MC
14.36.030)
9. The developer shall coordinate the development of a truck haul route with the Department of Public
Works if the import or export of material in excess of 5000 cubic yards is required. This plan shall
include the approximate number of truck trips and the proposed truck haul routes. It shall specify
the hours in which transport activities can occur and methods to mitigate construction-related
impacts to adjacent residents. These plans must be submitted for approval to the Department of
Public Works. (MC 17.05.210)
10. Water trucks will be utilized on the site and shall be available to be used throughout the day during
site grading to keep the soil damp enough to prevent dust being raised by the operations.
(California Stormwater BMP Handbook, Construction Wind Erosion WE-1)
11. All haul trucks shall arrive at the site no earlier than 8:00 a.m. or leave the site no later than 5:00
p.m., and shall be limited to Monday through Friday only. (MC 17.05)
12. Wet down the areas that are to be graded or that is being graded, in the late morning and after work
is completed for the day. (WE-1/MC 17.05)
13. The construction disturbance area shall be kept as small as possible. (California Stormwater BMP
Handbook, Construction Erosion Control EC-1) (DAMP)
14. All haul trucks shall be covered or have water applied to the exposed surface prior to leaving the
site to prevent dust from impacting the surrounding areas. (DAMP)
15. Prior to leaving the site, all haul trucks shall be washed off on-site on a gravel surface to prevent dirt
and dust from leaving the site and impacting public streets. (DAMP)
16. Comply with appropriate sections of AQMD Rule 403, particularly to minimize fugitive dust and
noise to surrounding areas. (AQMD Rule 403)
17. Wind barriers shall be installed along the perimeter of the site. (DAMP)
18. All construction materials, wastes, grading or demolition debris and stockpiles of soils, aggregates,
soil amendments, etc. shall be properly covered, stored and secured to prevent transport into
surface or ground waters by wind, rain, tracking, tidal erosion or dispersion. (DAMP)
THE FOLLOWING DEVELOPMENT REQUIREMENTS SHALL BE COMPLETED PRIOR TO
ISSUANCE OF A BUILDING PERMIT:
19. A Precise Grading Permit shall be issued. (MC 17.05)
G.'i ninearing Div sior'. DflTLLOPJv1EN71Conditicu1 20121California 502 (SIT. phis 2 units)`•AuEust 23 2012,CClifonia 502 (CUP 12-09) Dcv
Requirements 8-23-12
Page 4 of 4
20. A drainage fee for the subject development shall be paid at the rate applicable at the time of
Building Permit issuance. The current rate of $13,880 per gross acre is subject to periodic
adjustments. This project consists of 0.308 gross acres (including its tributary area portions along
the half street frontages) for a total required drainage fee of $4275. City records indicate the
previous use on this property never paid this required fee. Per provisions of the City Municipal
Code, this one-time fee shall be paid for all subdivisions or development of land. (MC 14.48)
21. The applicable Orange County Sanitation District Capital Facility Capacity Charge shall be paid to
the City Department of Public Works. (Ordinance OCSD-40)
THE FOLLOWING DEVELOPMENT REQUIREMENTS SHALL BE COMPLETED PRIOR TO FINAL
INSPECTION OR OCCUPANCY:
22. Complete all improvements as shown on the approved grading plans. (MC 17.05)
23. All new utilities shall be undergrounded. (MC 17.64)
24. All applicable Public Works fees shall be paid at the current rate unless otherwise stated, per the
Public Works Fee Schedule adopted by the City Council and available on the city web site at
htt ://www.surfci -hb.or Miles/users/ ublic works/fee schedule. df. (ZSO 240.06IZSO 250.16)
25. Traffic Impact Fees for the residential development shall be paid for the two new residential units
proposed on the property. The fees are based on the net new trip-miles the project is calculated to
generate for the new proposed use. The Traffic Impact Fee shall be paid prior to occupancy. (MC
17.65)
G.Lng neering Division'DLL7ELOPME1T+Conditions 2012\California:02 (SFR plus 2 uuts)\Aueus123 2012\Caiifomia 502 (CUP 12-0 9) Dev
S.23-12Requirements
HUNTINGTON BEACH
CITY OF HUNTINGTON BEACH
PLANNING AND BUILDING DEPARTMENT
PLANNING DIVISION
PROJECT IMPLEMENTATION CODE REQUIREMENTS
DATE:
PROJECT NAME:
PLANNING
APPLICATION NO.
ENTITLEMENTS:
DATE OF PLANS:
PROJECT LOCATION:
PLAN REVIEWER:
TELEPHONE/E-MAIL:
PROJECT DESCRIPTION:
AUGUST 23, 2012
NGUYEN RESIDENCE
PLANNING APPLICATION NO. 12-129
COASTAL DEVELOPMENT PERMIT NO. 12-09/ ADMINISTRATIVE
PERMIT 12-08
AUGUST 1, 2012
502 CALIFORNIA STREET, 92648 (NORTH SIDE OF ELMIRA AVENUE,
EAST OF CALIFORNIA STREET
ANDREW GONZALES, ASSOCIATE PLANNER
(714) 374-1547 1 AGONZALES@SURFCITY-HB.ORG
TO PERMIT A 284 SQ. FT. ADDITION TO AN EXISTING SINGLE-FAMILY
RESIDENCE AND CONSTRUCTION OF AN APPROXIMATELY 2,557
SQ. FT., TWO-STORY DETACHED RESIDENTIAL BUILDING
CONTAINING TWO, 663 SQ. FT. RESIDENTIAL UNITS WITHIN THE
COASTAL ZONE.
The following is a list of code requirements deemed applicable to the proposed project based on plans
stated above. The list is intended to assist the applicant by identifying requirements which must be
satisfied during the various stages of project permitting and implementation. A list of conditions of
approval adopted by the Zoning Administrator in conjunction with the requested entitlement(s), if any, will
also be provided should final project approval be received. If you have any questions regarding these
requirements, please contact the Plan Reviewer.
COASTAL DEVELOPMENT NO. 12-09/ ADMINISTRATIVE PERMIT NO. 12-08:
1. The site plan, floor plans, and elevations approved by the Zoning Administrator shall be the
conceptually approved design with the following modifications:
a. The site plan shall include all utility apparatus, such as but not limited to, backflow devices and
Edison transformers. Utility meters shall be screened from view from public right-of-ways.
Electric transformers and backflow prevention devices shall be not be located in the front yard
setback and shall be screened from view. (HBZSO Section 230.76)
b. All exterior mechanical equipment shall be screened from view on all sides. Rooftop mechanical
equipment shall be setback a minimum of 15 feet from the exterior edges of the building.
Page 2 of 3
Equipment to be screened includes, but is not limited to, heating, air conditioning, refrigeration
equipment, plumbing lines, ductwork and transformers. Said screening shall be architecturally
compatible with the building in terms of materials and colors. If screening is not designed
specifically into the building, a rooftop mechanical equipment plan showing proposed screening
must be submitted for review and approval with the application for building permit(s). (HBZSO
Section 230.76)
c. The site plan and elevations shall include the location of all gas meters, water meters, electrical
panels, air conditioning units, mailboxes (as approved by the United States Postal Service), and
similar items. If located on a building, they shall be architecturally integrated with the design of
the building, non-obtrusive, not interfere with sidewalk areas and comply with required setbacks.
(HBZSO Section 230.76)
2. Prior to issuance of demolition permits, the following shall be completed:
a. The applicant shall follow all procedural requirements and regulations of the South Coast Air
Quality Management District (SCAQMD) and any other local, state, or federal law regarding the
removal and disposal of any hazardous material including asbestos, lead, and PCB's. These
requirements include but are not limited to: survey, identification of removal methods,
containment measures, use and treatment of water, proper truck hauling, disposal procedures,
and proper notification to any and all involved agencies. (AQMD Rule 1403)
b. Pursuant to the requirements of the South Coast Air Quality Management District, an asbestos
survey shall be completed. (AQMD Rule 1403)
c. The applicant shall complete all Notification requirements of the South Coast Air Quality
Management District. (AQMD Rule 1403)
d. The City of Huntington Beach shall receive written verification from the South Coast Air Quality
Management District that the Notification procedures have been completed. (AQMD Rule 1403)
e. All asbestos shall be removed from all buildings prior to demolition of any portion of any building.
(AQMD Rule 1403)
f. Existing mature trees that may be removed must be replaced at a 2 for 1 ratio with a 36" box tree
or palm equivalent (13'-14' of trunk height for Queen Palms and 8'-9' of brown trunk). (CEQA
Categorical Exemption Section 15304)
3. During demolition, grading, site development, and/or construction, all Huntington Beach Zoning and
Subdivision Ordinance and Municipal Code requirements including the Noise Ordinance. All
activities including truck deliveries associated with construction, grading, remodeling, or repair shall
be limited to Monday - Saturday 7:00 AM to 8:00 PM. Such activities are prohibited Sundays and
Federal holidays. (HBMC 8.40.090)
4. The structure(s) cannot be occupied, the final building permit(s) cannot be approved, and utilities
cannot be released for the first residential unit until the following has been completed:
a. Complete all improvements as shown on the approved grading, landscape and improvement
plans. (HBMC 17.05)
Page 3 of 3
b. All trees shall be maintained or planted in accordance to the requirements of Chapter 232.
(HBZSO Chapter 232)
c. All landscape irrigation and planting installation shall be certified to be in conformance to the City
approved landscape plans by the Landscape Architect of record in written form to the City
Landscape Architect. (HBZSO Section 232.04.D)
d. The provisions of the Water Efficient Landscape Requirements shall be implemented. (HBMC
14.52)
5. The Development Services Departments (Planning & Building, Fire, and Public Works) shall be
responsible for ensuring compliance with all applicable code requirements and conditions of
approval. The Director of Planning and Building may approve minor amendments to plans and/or
conditions of approval as appropriate based on changed circumstances, new information or other
relevant factors. Any proposed plan/project revisions shall be called out on the plan sets submitted
for building permits. Permits shall not be issued until the Development Services Departments have
reviewed and approved the proposed changes for conformance with the intent of the Zoning
Administrator's action. If the proposed changes are of a substantial nature, an amendment to the
original entitlement reviewed by the Zoning Administrator may be required pursuant to the provisions
of HBZSO Section 241.18. (HBZSO Section 241.18)
6. Coastal Development Permit No. 12-09 and Administrative Permit No. 12-08 shall become null and
void unless exercised within one year of the date of final approval or such extension of time as may
be granted by the Director pursuant to a written request submitted to the Planning and Building
Department a minimum 30 days prior to the expiration date. (HBZSO Section 241.16.A)
7. Coastal Development Permit No. 12-09 and Administrative Permit No. 12-08 shall not become
effective until the appeal period following the approval of the entitlement has elapsed. ((HBZSO
Section 241.14)
8. The Zoning Administrator reserves the right to revoke Coastal Development Permit No. 12-09 and
Administrative Permit No. 12-08 pursuant to a public hearing for revocation, if any violation of the
conditions of approval, Huntington Beach Zoning and Subdivision Ordinance or Municipal Code
occurs. (HBZSO Section 241.16.D)
9. The project shall comply with all applicable requirements of the Municipal Code, Building Division and
Fire Department, as well as applicable local, State and Federal Fire Codes, Ordinances, and
standards, except as noted herein. (City Charter, Article V)
10. Construction shall be limited to Monday - Saturday 7:00 AM to 8:00 PM. Construction shall be
prohibited Sundays and Federal holidays. (HBMC 8.40.090)
11. The applicant shall submit a check in the amount of $50.00 for the posting of the Notice of Exemption
at the County of Orange Clerk's Office. The check shall be made out to the Coun of Oran e and
submitted to the Planning and Building Department within two (2) days of the Zoning Administrator's
approval of entitlements. (California Code Section 15094)
12. All landscaping shall be maintained in a neat and clean manner, and in conformance with the
HBZSO. Prior to removing or replacing any landscaped areas, check with the Departments of
Planning and Building and Public Works for Code requirements. Substantial changes may require
approval by the Zoning Administrator. (HBZSO Section 232.04)
.0
HUMINGTON BEACH
DATE:
PROJECT NAME:
PLANNING
APPLICATION NO.:
ENTITLEMENTS:
PROJECT LOCATION:
CITY OF HUNTINGTON BEACH
PLANNING & BUILDING DEPARTMENT
BUILDING DIVISION
PROJECT IMPLEMENTATION CODE REQUIREMENTS
AUGUST 20, 2012
NGUYEN RESIDENCE
PLANNING APPLICATION NO. 12-129
COASTAL DEVELOPMENT PERMIT NO. 12-091 ADMINISTRATIVE
PERMIT NO. 12-08
502 CALIFORNIA STREET, 92648 (NORTH SIDE OF ELMIRA AVENUE,
EAST OF CALIFORNIA STREET)
ANDREW GONZALES, ASSOCIATE PLANNER
KHOA DUONG, P.E
(714) 872-6123/ KHOA@CSGENGR.COM
TO PERMIT A 284 SQ. FT. ADDITION TO AN EXISTING SINGLE-FAMILY
RESIDENCE AND CONSTRUCTION OF AN APPROXIMATELY 2,557
SQ. FT., TWO-STORY DETACHED RESIDENTIAL BUILDING
CONTAINING TWO, 663 SQ. FT. RESIDENTIAL UNITS WITHIN THE
COASTAL ZONE.
PROJECT PLANNER:
PLAN REVIEWER:
TELEPHONE/E-MAIL:
PROJECT DESCRIPTION:
The following is a list of code requirements deemed applicable to the proposed project based on plans
received and dated August 1, 2012. The list is intended to assist the applicant by identifying
requirements which must be satisfied during the various stages of project permitting and implementation.
A list of conditions of approval adopted by the Zoning Administrator in conjunction with the requested
entitlement(s), if any, will also be provided should the project be approved. If you have any questions
regarding these requirements, please contact the Plan Reviewer.
1. SPECIAL CONDITIONS:
1. None
II. CODE ISSUES BASED ON PLANS & DRAWINGS SUBMITTED:
1. Project shall comply with the current state building codes adopted by the City at the time of
permit application submittal. Currently they are 2010 California Residential Code (CRC),
2010 California Mechanical Code (CMC), 2010 California Plumbing Code (CPC), 2010
California Electrical Code (CEC), 2010 California Energy Code, 2010 California Green
Building Standards and The Huntington Beach Municipal Code (HBMC). Compliance to all
applicable state and local codes is required prior to issuance of building permit.
Page 2 of 2
2. Provide complete site plan showing the all setback distances between exterior wall and
property line.
3. Exterior walls and openings in exterior wall must comply with Section R302.1 of 2010 CRC
4. An automatic residential fire sprinkler system shall be installed in one and two family dwelling.
Section 313.2 of 2010 CRC.
5. Soil report, energy calculations and structural calculations are required for this project.
6. Please contact me or our office to review preliminary code analyses to examine any possible
building code issue that may arise.
lll. COMMENTS:
1. Planning and Building Department encourage the use of pre submittal zoning applications and
building plan check meetings.
2. In addition to all of the code requirements of the 2010 California Green Building Standards Code,
specifically provide a Construction Waste Management Plan per Sections 4.408.2 and 5.408.1.1
0
HUNTINGTON BEACH
CITY OF HUNTINGTON BEACH
PLANNING AND BUILDING DEPARTMENT
PLANNING DIVISION
PROJECT IMPLEMENTATION CODE REQUIREMENTS
DATE:
PROJECT NAME:
PLANNING
APPLICATION NO.:
ENTITLEMENTS:
PROJECT LOCATION:
PROJECT PLANNER:
PLAN REVIEWER:
TELEPHONE/E-MAIL:
PROJECT DESCRIPTION:
AUGUST 2, 2012
NGUYEN RESIDENCE
PLANNING APPLICATION NO. 12-129
COASTAL DEVELOPMENT PERMIT NO. 12-09/ ADMINISTRATIVE
PERMIT NO. 12-08
502 CALIFORNIA STREET, 92648 (NORTH SIDE OF ELMIRA AVENUE,
EAST OF CALIFORNIA STREET)
ANDREW GONZALES, ASSOCIATE PLANNER
(714) 536-XXXX/XXXXX SURFCITY-HB.ORG
TO PERMIT A 284 SQ. FT. ADDITION TO AN EXISTING SINGLE-FAMILY
RESIDENCE AND CONSTRUCTION OF AN APPROXIMATELY 2,557
SQ. FT., TWO-STORY DETACHED RESIDENTIAL BUILDING
CONTAINING TWO, 663 SQ. FT. RESIDENTIAL UNITS WITHIN THE
COASTAL ZONE.
The following is a list of code requirements deemed applicable to the proposed project based on plans
received and dated August 1, 2012. The list is intended to assist the applicant by identifying
requirements which must be satisfied during the various stages of project permitting and implementation.
If you have any questions regarding these requirements, please contact the Plan Reviewer.