Loading...
HomeMy WebLinkAboutAdministrative Permit APX2013013 - Signed ApplicationaV). 1 1N'.COOOIr HUNrINOtON OEACH . • COMMERCIAL CITY OF HUNTINGTON BEACH PLANNING & BUILDING DEPARTMENT PLANNING AND ZONING PLAN CHECK Plan Checked By .E Telephone: (714)536-5271 orrn36 -S2S3 Plan Check No. Date g. w.(3 Job Address AVAAA A'%6.. Plan Dated: 0. (3 Entitlement No(s)#Expiration Date Review Body: Planning Commission Zoning Administrator _ Design Review Board Director Proposed Use H Ar At4 06%to l('ft Nft-t:o Aviv 140 A-Ce.. 1. Legal Description: Lot Block Tract 2. Assessor's Parcel Number (s) DM Zone 3. General Plan Designation CIA General Plan Sub Area Requirements 4. Existing Lot Size 907 q 5. 6. Dedication Required Yes/No (alley, comer, street) Net Lot Size Proposed Total Building Floor Area 3 861 Environmental Status: Study required? IN Exempt (sec. _Proposed Number Units class 1 10 -7 IT 6 EA/EIR number 7. Coastal Zone: 1 Appealable/Nonappealable area Exempt Categorical exclusion (sec. class 8. Special Areas (circle if applicable) Residential Infill Noise Contour Design Overlay Oil Methane Seismic Liquefaction FAA Historic Plan Check per HB Zoning and Subdivision Ordinance and General Plan Redevelopment Earthquake Flood Section 211.06 CO CG CV Additional Proposed Provisions Minimum Building Site Re uirements (Net) Area (sq. ft.)10,000 10,000 10,000 (C)Ex(srlw Width(ft.) Mi i S b k 100 100 100 nmum et ac s Front (ft.)10 10 (D)(E)(O) Side (ft.)5 (F) Street Side (ft.)10 10 (E) Rear (ft.)5 (F) Maximum Height (ft.)40 50 50 (F)(G) Maximum Height (ft.) wlin 45' residential district 18 18 18 Maximum Wall Dimensions (N) Maximum Floor Area Ratio (FAR)1.0 1.5 1.5 Minimum Site Landscaping (%)8 .8 (H)(I) (0)Building Design Standards Fences and Walls (visibility)See Section 230.88 (J)(K) Off-Street Parking and Loading Outdoor Facilities Screening of Mechanical E of ment Refuse Storage Areas Underground Utilities Performance Standards Nonconforming Structures Signs Antenna Urban Design Guidelines See Chapter 231 See Section 230.74 See Section 230.76 See Section 230.78 See Chapter 17.64 See Section 230.82 See Chapter 236 See Chapter 233 See Section 230.80 Subject to separate plan check (L) (M) see page 2 OK VX(ST't rs General Plan Maximum Height Maximum Floor Area Ratio Noise Mitigation Scenic/Landscape Corridor Urban Design Historical/Cultural Requirements Provided Economic Circulation See Page 2 G:\FORMS\PLANNING\Pian Check - ConunerciaLdoc 10/26/12 NONRESIDENTIAL Page 2 ADDITIONAL PROVISIONS HBZSO Section 230.36 Transportation Demand Management 230.62 & 258.02 Legal Building Site 230.64 Substandard Lot 230.68 Projections Into Yards Fire lace or chimne Cornice, eaves and ornamental features Mechanical e ut ment Uncovered porches, terraces, platforms, subterranean garages, decks, and patios not more than 3 feet in height serving only the first floor Stairs, canopies, awnings and uncovered porches more than 3 feel In hei ht Be windows Balconies Covered patios 230.76 Screening of Mechanical Equl ment 230.78 f AB 939 230.70 Measurement of Height CHAPTER 231 Off-street Parking Non-residential requirement Total required Size Turning Radius Aisle Ways Striping Detail Wheel stops/curbs Commercial Entrance Turn-around S ace Bicycle Parking Loading Space Chapter 231,18 C) Illumination Parking Lot Landscaping CHAPTER 232 Signs FAA setback & height limitation Urban Design Guidelines Requirements Carpool parking; separate showers 2 per 100 employees; lockers 1 per 20 employees; bicycle parking 1 per 20 employees; assenger loading area; vanpool parking; bus stops /No Proof Re uired Yes/No If yes, submit copy of recorded map or Certificate of Com fiance Yes/ o If yes, Conditional Use Permit approval by Zoning Administrator required No individual projection shall exceed 113 of the building length, and the total of all projections shall not exceed 2/3 of the building length on which they are located. Front Yard Side Yard Street Side Yard Rear Yard 2.5'2.5' 30" min clearance 2 5'2.5' 3'2.5' (30" min clearance)3'3' 2'2' 30" min clearance 2' 30" min clearance 2' 6'3'4'5' 4'2'(30" min clearance)4'4' (30" min clearance) 2.5'2.5' 30" min clearance 2.5'2.5' 3'2' 30" min clearance 3'3' 0 0 5' (max projection 1/2 width of street side and 5' Utility meters shall be screened from view from public ROW. Electrical transformers in front or street side setback shall be laced underground. Backflow devices shall be not be located in front yard setback. AB 939 requires an additional refuse storage area for recyclable material. Second refuse storage are on site Ian or a note added to site plan indicating refuse storage area for trash and recyclables. Dimensions shown: datum to of slab 67. sq.ft. + 200 = '3 total sq.ft. + 0 = total s .ft. + - total sq.ft. + = total 3 82? 9' x 19' minimum with 7' vertical clearance a 26' nonresidential; 20 ft. arallel & 2-way angled kg; 30"-14'; 45"-14'; 60"-15'; 24 ft. fire lane 20' for 0"-60° parking; 26' for 90" parking; 24' without adjacent parking; 25' for access to rear o-f nonresidential bldg. Shown per Diagram A Adjacent to walkways, buildings, fencing, or landsca ing Required If more than 200 parking spaces; 2-24 ft. wide lanes w/4'island for 100' 3' x 3' maneuver area for dead end parking aisles less than 150'; space for aisles over 150' Buildings up to 50,000 sq. ft. = 1 bicycle space for every 25 parking spaces required (minimum 3) Buildings over 50,000 sq. ft. = Direct or shall determine # of bicycle s aces based on use and employees 0 space required for buildings less than 20,000 sq. ft. 1- 14' x 20' s ace er 20,000 sq. ft. bldg area See Policy PP-105 • . • 3 ft. or 5 ft. wide perimeter planter; 1 tree per 10 parking spaces; ether planters Subject to separate plan check Subject to separate plan check REQUIRED PRIOR TO BUILDING PERMIT SUBMITTAL, ISSUANCE, AND/OR FINAL INSPECTION Required Item Residential Infill Proof of Mailing Noise Study Reciprocal Access Easement Document Maintenance Easement Document Joint Use Parking Agreement Copy of Recordetj Map ' Copy of Certificate of Compliance Approval from Coastal Commissiorj Categorical Exclusion (Coastal Letter Landscape and Irrigation Plan Ligting Plan Grading Pran- CC&Rs Review and Approval Elevation Certificate- Mitigation Monitoring Program Notice of Exemption Parkland Dedication In-lieu Fee Downtown Specific Plan Fee In-lieu Parking Fee Amount/Due Date Completed $831 per acre = $ top of roof PROVIDED a G:Fonns\Platvling\Plans Check- Page 2 46 49 10/26/12 Pro er Number of Plans A licant's Name, Address, Tele hone Number Develo ment Corn liance Matrix ntitlement No. On Plans Com lete and internall consistent Sets Site Plan, Eleva ns, Floor Plans, Sections Drawin s ENTITLEMENT NO:V3'- Q.PLANNER: APPLICANT:A9:)N II~14y;RL60N PROJECT ADDRESS: APPL ATIONFORMREVIEW.•-`" ' e uest Corn lete (S ecial Permits, Variances) Photo ra hs ro ert Owner's Si nature or Letter of Authorization Additional Fees Paid Le al Descri tion/AP No./AP Ma Address Correct Verif Zonin arrative Justification for Re uest) Veri General Plan (Sub-Areas & FAR) Ci View - Com Iete PLANS- Z I Accurate, Full •ITY OF HUNTINGTOI`EACH PROJECT PROCESSING CHECKLIST (For Planning Staff Use) Dimensioned , Drawn to Scale and with North Arrow Must include Property Lines, Street Names, Street Width, Existing and Proposed Buildings, Easements, Adjacent Im rovements & Uses, Floor Plan Ap licant's Name, Address, Tele hone Number DEVELOPMENT REVIEW REQUEST SENT to Other Departments (Tract Maps ASAP) See Entitlement Review Re nest List Memo P-6R ENVIRO ENTAL REVIEW: Cate oricall Exem t Ne ative Declaration Check Miti ation Measures of Previousl a roved EIR/N.D. COAS AL STATUS: Not A licable Exem t A ealable Area Categoricall Excluded 1EIR Non-A ealable Area Coastal Develo ment Permit N A CONCURRENT PROCESSING Other Entitlements/Fees FIEL INSPECTION: xistin On-Site Use s and Ad'acent Uses andsca in Condition/ Mature Trees Grade Differentials with Ad'oinin Lots Parkin Lot Condition/ Drivewa s/ Reci rocal Access e al Structures & Additions/ Non-Conformin Si s Fences/ Walls - Hei ht/ Condition/ Location PRELIMINARY PLAN CHECK, See Plan Check Sheet) URBAN DESIGN GUIDELINES :See Desi n Review Checklist) OTHER ISSUES: I Flood Plain Al uist-Priolo Seismic Hazardous Waste Site Redevelo ment Area Affordable Housin Plan Easements S ecific Plan Area Oil Wells Infill Lot Ordinance DAT Meetin Park & Rec. Fees/Re 's 1 PROJECT REVIEW MEETING with Plannin Staff (( 13 1 Previous Entitlements and Conditions Ad'acent Entitlements and Conditions Reci rocal Access on Ad'acent Pro ert Pro ert Maintenance Ordinance Water uali Mana ement Plan Historical SEND FILING STATUS LETTER TO APPLICANT (and property owner, if different ) within 30 days. Have meetin with A licant if necessar INFORM APPLICANT EARLY IN PROCESS OF STAFF'S RECOMMENDATION AND CONDITIONS COMMUNITY MEETING for Major or Controversial Projects (Send Notices, "include Planning Commission) SUBDIVISION MEETING REQUIRED (Send Notices) DESIGN REVIEW MEETING RE UIRED Materials & Color Board Send Notices LEGAL SERVICES RE UEST SENT Ordinance , 0 inion, Resolution Zonin Text and Ma Amendments ENVIRONMENTAL ASSESSMENT COMMITTEE Send Notices PLANNING COMMISSION STUDY SESSION Send Notices OWNERSHIP MAILING LIST AND MAP ACCURACY: Verified & Most Current (Map and Mailing labels of Owners and/or Tenants, A licant, Site Pro e Owner, A ent and Matrix SEND LEGAL NOTICES FOR PUBLIC HEARING includin Infill Lan ua e, if a licable (with labels) -CONTINUED ON BACIC SIDE - G:\FORMS\PLANNING\Application Checklist 3b PREPARE STAFF REPORT/CONDIT 1S OF APPROVAL: Prepare Attachments I _] Reduced Size Plans Revised Plans ENSURE STAFF REPORT.IS DISTRIBUTED TO ALL INTERESTED INDIVIDUALS WEDNESDAYBEFORE MEETING: 1 Planning Commissioners (Linda Wine)FI Interested Parties Applicant/Property Owner (Call to confirm they are aware of meeting and they received staff report) LATE COMMUNICATIONS SENT TO PC, STAFF PLANNER, DIRECTOR, PLANNING MANAGER, & PRINCIPAL PLANNER; PUBLIC WORKS & FIRE STAFF LIAISONS, APPLICANT - (BE SURE TO MARK EACH COMMUNICATON WITH THE AGENDA ITEM NUMBER) PLANNING COMMISSION/ ZONING ADMINISTRATOR MEETING: Colored Site Plans, Floor Plans and Elevations Massing Model Slides/Photographs PowerPoint Presentation After Final Meeting I NOTICE OF ACTION LETTER (WITH CONDITIONS AND CODE REQUIREMENTS) MAILED TO APPLICANT &/ PROPERTY OWNER (INCLUDE CUSTOMER SURVEY CARD) NOTICE OF ACTION LETTER (WITH CONDITIONS AND CODE REQUIREMENTS) LINKED TO CITYVIEW CALL APPLICANT IF THEY DID NOT ATTEND AND/OR TO FOLLOW-UP AND ANSWER ANY QUESTIONS FOR THEM (Customer Service) CEQA NOTICE AND MITIGATION MONITORING FEE, if re uired APPEALABLE DEVELOPMENT OR CATEGORICAL EXCLUSION LETTER FOR COASTAL, it a licable PLANS STAMPED WITH NOTED ACTION MINUTES IN FILE ORGANIZE ZONING FILE AND PLACE IN FILE CABINET (see De t. Polic Memo for file organization) If Appealed NOTIFY APPLICANT IF APPEALED BY SOMEONE ELSE. NOTIFY OTHER DEPARTMENT'S REPRESENTATIVES. INFORM APPLICANT / OTHER DEPARTMENTS IF STAFF RECOMMENDATION CHANGES. NOTIFY APPLICANT / OTHER DEPARTMENTS OF SCHEDULED HEARING DATE. G:\FORMS\PLANNING\Application Checklist 3b Ci of Huntin ton Beach 2000 MAIN STREET DEPARTMENT OF PLANNING AND BUILDING www.huntin onbeachca. ov Plannin Division 714.536.5271 May 30, 2013 Jason Wilkenson 8853 Adams Ave Huntington Beach, CA 92646 ENTITLEMENT: PROJECT ADDRESS PROPERTY OWNER: DATE RECEIVED AT ZONING COUNTER: Administrative Permit No. 13-013 8855 Adams Ave CALIFORNIA 92648 Buildin Division 714.536.5241 Pacific Plaza Shopping Center LP/ Jodyne Roseman 28245 Avenue Crocker, Suite 101 Santa Clarita, CA 91355 May 30, 2013 PROJECT PLANNER: David Schlegel (714)536-5253 David. Schle el surfci -hb. r Dear Applicant: Thank you for submitting your entitlement to the City of Huntington Beach, Planning Department. The assigned Project Planner is responsible for processing your entitlement and will be responsible for the following tasks: Reviewing your entitlement for completeness; Evaluating the project for conformance with the General Plan; Reviewing plans for compliance with the Zoning Code, Design Guidelines, and applicable City Ordinances; Preparation of environmental documents pursuant to the California Environmental Quality Act (CEQA); Analyzing the site plan layout and, if applicable, the floor plans and elevations; Evaluating the project for compatibility with, and potential impacts to, surrounding uses/structures; Coordinating issues related to the Fire Dept., Public Works Dept., Building Division, etc.; Obtaining other City department's comments relative to the project; Coordinating any necessary community meetings; Preparing a staff report and recommendation (approval/denial) with suggested findings and conditions of approval Scheduling the project for a public hearing; and Assisting you with any follow-up actions and/or conditions of approval. Entitlement Page Two • Please be advised that a Notice of Filing Status letter will be sent to you regarding the status/completeness of your entitlement(s) notifying you of the' pending hearing date within 30 da s of receipt of the entitlement(s) at the zoning counter. The letter will indicate one of the following circumstances: Entitlement Deemed Incomplete; additional information is required (e.g., revised plans, supplemental plans, environmental information, additional entitlements, etc.); or Entitlement Deemed Complete; the Project Planner is continuing to process your entitlement(s) and you will be notified as to when your project will be scheduled for a hearing by (1) the Design Review Board, (2) the Zoning Administrator, or (3) the Planning Commission. The three scenarios listed below are the subsequent steps to the above notification: If the project is subject to Planning Commission review, a staff report with a full analysis of the proposal will be prepared. Your plans and supplemental information will be attached to the staff report. A copy of the staff report will be mailed to you prior to the hearing; If the project is scheduled for Zoning Administrator review, an executive summary with staff's recommendation for the project will be prepared. A copy of the executive summary will be mailed to you prior to the hearing; If the project is scheduled for Design Review Board action, no staff report will be prepared, however staff will advise you of the staff recommendation prior to the meeting. Generally, the complete processing time from submittal to final action by the reviewing body and expiration of the appeal period is as follows: Design Review Board: 30-45 days (dependent upon the complexity of your project) Zoning Administrator : 2-3 months (dependent upon the complexity of your project) Planning Commission: 4-6 months (dependent upon the complexity of your project) Please note: When Zone Changes, General Plan Amendments, Tentative Maps, or preparation of environmental documents are involved, additional processing time is necessary. Please direct your questions and communications to the assigned Pro'ect Planner. If you have any subsequent comments or need additional clarification, please contact me at 714-536-5271. Thank you in advance for your interest in Huntington Beach - we look forward to working with you! Sincerely, eJ s Acting Planning Manager xc: Property Owner Project File