HomeMy WebLinkAboutLot Line Adjustment LLA1999002 - Signed ApplicationCity of Huntington Beach
Department of Community Development
2000 Main Street
Huntington Beach, CA 92648
(714) 536-5271
SUBDIVISION APPLICATION:
Plaffining Commission
oning Administrator
In& Lak (& In
Applicant or Authorized A ent .
g101 'P_ vii Z6
Mailing Address
6 CA
q 72147
Tele hone Number
Pro erty Owner
2 ra(e, q7/iUe. %1-f 2
Mailing Address
r+_ 45A
A:emeA y
V&k ( eJA
Subdivider
10012, Cau.rth uhte, 2,10
M fling Address
IW2
wet
ne
Z, Gfr Ul • VD
Mailing Address
l CA
;-r-t 0 Olt
Telephone Number
RE UEST:
Tv as .
10,
&-04-G (Rtk-O -
Present Zone DM '3 10
General Plan Designation
ENTITLEMENT
Te a iv Par 1 Ma
Ten ative Tra Ma
L t Lin Ad u men
FEE A E NUMBER
TP
TTM
LLA
Methane Zone
Environmental,., Flood Zone
P/ Exempt iSVU Oil District
-2-
-L--,*,'
Environmental Redevelopment Area
Assessment Required Alquist Priolo Area
AQMD Zone
oastal Area: Yes. No
Exempt CDP
Categorical Exclusio
Owners ip Verification
Applicant Authorization
Maps
/Narrative
Concurrent Cases:
Previous Cases:
Date Received
Initials i
e
Receipt #
Project Planner
Ow & A & 1-L
O (1111 Hitt Aue
Q &,E Iu^e behk)eev, --two M c t.1 q,t i?e( rrfi (ate c aLA,
yE , i t-I e !vi v a( ,u -fu ad oi[ cue
2 0,I ' 3 -f l,e ZurK lnuloaf sr CX0 1
LOCATION OF PROPERTY:
o Street address: 2 r' O GC eRL 7(\\
o Name and distance to nearest intersecting street:
LEGAL DESCRIPTION:
o Assessor's Parcel Number U2'- l8 (- ' s-915.
o Tract Block Lot
o Section 1 0 Township Range
o Acreage a 7 a1
A 6 6 9 2 2 3.84 aux
.;d iC}( y(A- t .
Pro ert Owner , have read and understood all
Please Print Your Name
.statements including the filing requirements on the reverse side of this application. I am the property
owner of the subject property. I hereby affirm under penalty of perjury that the foregoing statements,
facts, and attachments are true and correct. I understand that this application for subdivision may be
denied, modified or approved with conditions and that such conditions must be complied with prior to
submittal of the final map and prior to issuance of building permits. I hereby authorize ?G Ce uYA ent to act. as my representative and to bind me in all matters f
concerning this application.
Signature of:(, Y cCGaudC.Z-/Z-t
Property Owner Date Authorized Agent Date
pt"
(0238D) C -a . GDD
REQUIRED OF ALLAPPLICATIONS:
1. This application must be typed or printed and filled in completely.
2. If the applicant is not the property owner, the property owner shall designate the applicant to act on
his behalf and sign this application.
3. Tentative Parcel Maps require six (6) copies of the tentative map and Lot Line Adjustments require six
(6) copies on the prescribed form available at the Zoning Counter.
4. Tentative Tract maps require twenty (20) 18" x 26" copies and two (2) 8-1/2" x 14" copies of the map
drawn to a scale not less than one inch equals 100 feet (1" = 100'), which shall be submitted for review
and approval by the Planning Commission.
5. Fold all lans. to a maximum size of -1 2" x 14" (lower right print side out).
6. . Photographs of the subject property.
7. A written narrative shall accompany this application and will include the following information:
(a) Existing use or uses of the property and present zoning.
(b) Proposed use of property. If property is proposed to be used for more than one purpose, the area,
lots or lot proposed for each type of use shall be shown on the tentative map.
(c) Statement of the improvements and public utilities, including water supply and sewage disposal,
proposed to be made or installed and the time at which such improvements are proposed to be
completed.
(d) Public areas proposed.
(e) Tree planting proposed.
(f) Restrictive covenants proposed.
8. The tentative map shall contain the following information:
(a) The subdivision name and/or number, date, north point, scale and sufficient description to define
the location and boundaries of the proposed subdivision.
(b) Name and address of record owner or owners of said subdivision.
(c) Name and address of the subdivider.
(d) Name, business address and number of the registered engineer, or,licensed surveyor, who prepared
map of said subdivision.
(e) Elevations or contours at intervals or two (2) feet up to five (5) percent grade, give five (5)
feet up to ten (10) percent grade, and ten (10) feet over ten (10) percent grade, to determine
slope of the land and the high and low points thereof, unless approval is obtained from the'City
Engineer to allow.greater intervals.
(f) The locations, names, widths and approximate grades of all roads, streets, highways, ways and
locations of existing streets in the proposed subdivision and along the boundaries thereof.
(g) The location and character of all existing or proposed public utility facilities in said adjoining
and contiguous highways, streets and ways.
(h) The approximate widths, location and purpose of all existing or proposed easements and contiguous
to the proposed subdivision.
(i) Approximate lot layout and approximate dimensions of each lot and each to be numbered.
(j) The outline of any existing buildings to remain in place and their location in relation to existing
or proposed street and lot lines.
(k) If the subdivision is within a known oil field the map shall include the location of all existing
oil wells -and appurtenances and a plan of their disposition or treatment including abandonment,
underground placement, screening, fencing, landscaping, conversion of pumping units, etc. Such
plan shall include disposition of treatment of all future wells, drill sites and operations. Such
plan shall also include the written concurrence of the oil lessee or operator concerned.
9. All decisions by the Zoning Administrator and the Planning Commission are final unless appealed within
ten (10) days of such decision and shall be in writing specifying the areas of aggrievement.
10. The approval or conditional approval of a tentative map or tentative parcel map shall expire twenty-four
(24) months from the date the map was approved or conditionally approved. The expiration of the approved
or conditionally approved tentative map shall terminate all proceedings. Any subsequent subdivision of
the same real property shall require the filing and processing of a new map.
11. Extension on tentative maps and tentative parcel maps.
(a) The subdivider filing a tentative map or tentative parcel map may request an extension of the
tentative map or tentative parcel map approval by written application to the Department of
Community Development, such application to be filed at least thirty (30) days before the expiration
of the approved or conditionally approved map.. The application shall state the reasons for the
requested extension. In granting an extension-, new conditions and exactions may be imposed and
existing conditions may be revised.
(b) An extension(s) or tentative map or tentative parcel map approval or conditional approval may be
extended by the Zoning Administrator, Planning Commission or City Council for a period not to
exceed one year, with a maximum of three (3) one-year extensions of time. The extension of. time
shall commence with the expiration date of the approved or condi- tionally approved tentative map
or tentative parcel map. The approved new date shall not extend more than five (5) years beyond
the date of initial approval. .
Note:. Completion of this application does not presume approval of the subdivision. Such approval is
discretionary with the Zoning nistrator or the Planning Commissio The Zoning Administrator or
Commission may deny, modify or ve the subdivision with conditions.
(02380)
46 "OF HUNTINGTON BEACH
APPLICATION PROCESSING CHECKLIST
ENTITLEMENT NO:.
APPLICANT:.
APPLICATION FORM REVIEW:
Request Complete (Special Permits/Variances)
Owner's Signature/Letter of Authorization
Legal Description/AP No./AP Map
Verify Zoning: -
Verify General Plan:
Photographs
Additional Fees Paid
Address Correct
Narrative (Justification for Request)
PLAN REVIEW
Proper Number
Complete and internally consistent sets (Site Plan, Elevations, Floor Plans, Sections Drawings)
Accurate, Fully Dimensioned, Drawn to Scale and with North Arrow
Must include Property Lines, Street Names, Street Width, Existing and Proposed Buildings, Easements, Adjacent
Improvements & Uses, Floor Plan
Applicant's Name, Address, Telephone Number
Development Compliance Matrix
DEVELOPMENT REVIEW REQUEST SENT (Tract Maps ASAP): (See Entitlement Review Request List Memo)
ENVIRONMENTAL REVIEW
Categorically Exempt I Negative Declaration E I R
Check Mitigation Measures of Previously approved EIR/N.D.
COASTAL STATUS:
Not Applicable Appealable Area Non-Appealable-Appealable Area
Excluded Coastal DevelopmentExempt Permit
CONCURRENT PROCESSING (Other Entitlements/Fees)
FIELD INSPECTION:
Existing Use(s)
Adjacent Uses/Architecture
Landscaping Condition
Existing Trees
PRELIMINARY PLAN CHECK (See Plan Check Sheet)
OTHER ISSUES:
Flood Plain
FAA (projects near heliports or include tall buildings)
Alquist-Priolo/Seismic
Hazardous Waste Site
Previous Entitlements and Conditions
PROJECT DESIGN ISSUES (See Separate List
PROJEfPT REVIEW MEETING
SEND FILING STATUS TO APPLICANT
Parking/Driveway
Illegal Structures/Illegal Grading
Non-Conforming Signs
Existing Walls/Fences
Easements
Specific Plan
Oil Wells
Adjacent Entitlements and Condition
SUBDIVISION MEETING REQUIRED (Notices Sent)
DESIGN REVIEW MEETING REQUIRED (Materials & Color Board)
LEGAL SERVICES REQUEST SENT (Ordinance , Opinion , Code Amendment)
ENVIRONMENTAL ASSESSMENT COMMITTEE
OWNERSHIP MAILING LIST AND MAP ACCURACY: Verified & Most Current (Map and Mailing labels of Owners
and/or Tenants, Applicant, Site Property Owner, Agent and Mailing Matrix per Policy Memo)
SEND LEGAL NOTICES (with labels)
PREPARE STAFF REPORT/CONDITIONS OF APPROVAL:
Prepare Attachments
Revised Plans
PLANNING COMMISSION/ZONING ADMINISTRATOR MEETING:
Colored Site Plans, Floor Plans and Elevations
Massing Model
Reduced Size Plans
Slides/Photographs
PREPARE CATEGORICAL EXCLUSION. LETTER FOR COASTAL
NOTICE OF CEQA CATEGORICAL EXEMPTION (Collect Processing Fee)
NOTICE OF ACTION LETTER SENT (Indicating 10 Day Appeal Period)
NOTICE OF ACTION - COASTAL DEVELOPMENT PERMIT (APPEALABLE DEVELOPMENT) LETTER SENT
TO CALIFORNIA COASTAL COMMISSION (After 10 day appeal period)
(g:forms:ckhlst:2)
(10/26/98)
'PLANNER:,.,
ADDRESS::,
•
0 a
' • .
J.J City of Huntington Beach
2000 MAIN STREET CALIFORNIA92648
DEPARTMENT OF PLANNING
Phone
Fax
April 15, 1999
536-5271
374-1540
374-1648
PLC Land Company
23 Corporate Plaza Dr., Ste 250
Newport Beach, CA 92660
ENTITLEMENT S : Lot Line Adjustment 99-2
PROJECT ADDRESS: 20031 Goldenwest Street
PROPERTY OWNER: PLC, a CA General Partnership
DATE RECEIVED AT
ZONING COUNTER:: April 9, 1999
PROJECT PLANNER: Bob Goldin
Dear Applicant:
Thank you for submitting your entitlement(s) to the City of Huntington Beach, Community
Development Department. The Project Planner indicated above is assigned to processing your
entitlement(s). The Project Planner is responsible for:
• Reviewing your entitlement(s) for completeness;
• Reviewing plans for compliance with the Zoning Code and applicable City Ordinances;
• Evaluating the project for conformance with the General Plan;
• Preparation of environmental documents pursuant to the California Environmental
Quality Act (CEQA);
• Obtaining other City department's comments relative to the project;
• Analyzing the site plan layout and, if applicable, the floor plans and elevations;
• Evaluating the project for compatibility with, and potential impacts to, surrounding
uses/structures;
• Coordinating issues related to the Fire Dept., Public Works Dept., Building Division, etc.;
• Scheduling the project for a public hearing;
• Preparing a recommendation(approval/denial) with fmdings and conditions; and
• Assisting you with any follow-up actions and/or conditions of approval.
A letter will be sent to you regarding the status/completeness of your entitlement(s), or your
pending hearing date, within four weeks. The letter will indicate either additional information is
required (e.g., revised plans, supplemental plans, environmental information, additional
entitlements, etc.), or that the planner is continuing to process your entitlement(s) and that you
will be notified as to when your project will be scheduled for a Zoning Administrator, Planning
Commission, and/or Design Review Board hearing.
If the project is subject to Planning Commission review, a staff report will be prepared with your
maps and supplemental information attached; no written staff reports are prepared for Zoning
Administrator or Design Review Board action.
Generally, the total processing time (from submittal to final action by the reviewing body and
expiration of the appeal period) is two (2) to three (3) months for Zoning Administrator action,
four (4) to six (6) months for Planning Commission action, and one (1) month for Design Review
Board action, depending upon the complexity of your project. When Zone Changes, General
Plan Amendments, Tentative Maps, or preparation of environmental documents are involved, a
longer processing time is necessary.
Please direct all of your questions and communications to the Project Planner using the
entitlement number(s) assigned to your case. You should contact the Project Planner at
714/536-5271 to discuss any concerns you may have regarding your project. Should you have
any comments or need additional clarification, please contact me at the same number.
Thank you.
Sincer ,
Scott Hess, AICP
Senior Planner
Current Planning Section
cc. Property Owner
Project File
(g:kim:forms:entltr)
0