Loading...
HomeMy WebLinkAboutGeneral Plan Conformance GPC2010004 - Project Implementation Code RequirementsCITY OF HUNTINGTON BEACH PUBLIC WORKS INTERDEPARTMENTAL COMMUNICATION PROJECT IMPLEMENTATION CODE REQUIREMENTS DATE: PROJECT NAME: ENTITLEMENTS: PLNG APPLICATION NO: DATE OF PLANS: PROJECT LOCATION: PROJECT PLANNER: TELEPHONE /E-MAIL: PLAN REVIEWER: TELEPHONE/E-MAIL: PROJECT DESCRIPTION: 8/31/10 SURPLUS PARCELS GPC 10-04 2010-0156 6/30/10 VARIOUS ROSEMARY MEDEL, ASSOCIATE PLANNER 714-374-1684 / RMEDEL SURFCITY-HB.ORG JOSH MCDONALD, CIVIL ENGINEERING ASSISTANT 714-536-5509 / JOSHUA.MCDONALD SURFCITY-HB.ORG TO DETERMINE GENERAL PLAN CONFORMANCE FOR THE RELEASE OF SEVEN SURPLUS PARCELS, APN's: 142-103-02, 142-103-05, 142- 103-20,159-121-20,159-151-15, 024-206-13, 157-341-22 The following is a list of code requirements deemed applicable to the proposed project based on plans as stated above. The items below are to meet the City of Huntington Beach's Municipal Code (HBMC), Zoning and Subdivision Ordinance (ZSO), Department of Public Works Standard Plans (Civil, Water and Landscaping) and the American Public Works Association (APWA) Standards Specifications for Public Works Construction (Green Book), the Orange County Drainage Area management Plan (DAMP), and the City Arboricultural and Landscape Standards and Specifications. The list is intended to assist the applicant by identifying requirements which shall be satisfied during the various stages of project permitting, implementation and construction. If you have any questions regarding these requirements, please contact the Plan Reviewer or Project Planner. THE FOLLOWING DEVELOPMENT REQUIREMENTS SHALL BE COMPLETED PRIOR TO ISSUANCE OF A GRADING PERMIT: 1 The following dedications to the City of Huntington Beach shall be required. (ZSO 230.084A) a. A 10-foot right-of-way dedication for pedestrian access and public utilities along the Garfield Avenue frontage is required, per Public Works Standard Plan Nos. 104 and 207. Garfield Avenue is designated as a primary arterial street with an ultimate right-of-way width of 100 feet. Page 2 of 2 b. A 10-foot right-of-way dedication for pedestrian access and public utilities along the Delaware Street frontage is required, per Public Works Standard Plan Nos. 104 and 207. Delaware Street is designated as a secondary arterial street with an ultimate right-of-way width of 80 feet. c. A 35-foot radius right-of-way dedication for pedestrian access and public utilities at the intersection of Delaware Street and Garfield Avenue per Public Works Standard Plan No. 207. CITY OF HUNTINGTON BEACH PUBLIC WORKS INTERDEPARTMENTAL COMMUNICATION PROJECT IMPLEMENTATION CODE REQUIREMENTS DATE: PROJECT NAME: ENTITLEMENTS: PLNG APPLICATION NO: DATE OF PLANS: PROJECT LOCATION: PROJECT PLANNER: TELEPHONE/E-MAIL: PLAN REVIEWER: TELEPHONE/E-MAIL: PROJECT DESCRIPTION: 8/24/10 SURPLUS PARCELS GPC 10-04 2010-0156 6/30/10 VARIOUS ROSEMARY MEDEL, ASSOCIATE PLANNER 714-374-1684 / RMEDEL SURFCITY-HB.ORG JOSH MCDONALD, CIVIL ENGINEERING ASSISTANT 714-536-5509 / JOSHUA.MCDONALD SURFCITY-HB.ORG TO DETERMINE GENERAL PLAN CONFORMANCE FOR THE RELEASE OF SIX SURPLUS PARCELS, APN's: 142-103-02, 142-103-05, 142-103- 20, 159-121-20, 159-151-15, 024-206-13 The following is a list of code requirements deemed applicable to the proposed project based on plans as stated above. The items below are to meet the City of Huntington Beach's Municipal Code (HBMC), Zoning and Subdivision Ordinance (ZSO), Department of Public Works Standard Plans (Civil, Water and Landscaping) and the American Public Works Association (APWA) Standards Specifications for Public Works Construction (Green Book), the Orange County Drainage Area management Plan (DAMP), and the City Arboricultural and Landscape Standards and Specifications. The list is intended to assist the applicant by identifying requirements which shall be satisfied during the various stages of project permitting, implementation and construction. If you have any questions regarding these requirements, please contact the Plan Reviewer or Project Planner. THE FOLLOWING DEVELOPMENT REQUIREMENTS SHALL BE COMPLETED PRIOR TO ISSUANCE OF A GRADING PERMIT: 1 The following dedications to the City of Huntington Beach shall be required. (ZSO 230.084A) a. A 10-foot right-of-way dedication for pedestrian access and public utilities along the Garfield Avenue frontage is required, per Public Works Standard Plan Nos. 104 and 207. Garfield Avenue is designated as a primary arterial street with an ultimate right-of-way width of 100 feet. Page 2 of 2 b. A 10-foot right-of-way dedication for pedestrian access and public utilities along the Delaware Street frontage is required, per Public Works Standard Plan Nos. 104 and 207. Delaware Street is designated as a secondary arterial street with an ultimate right-of-way width of 80 feet. c. A 35-foot radius right-of-way dedication for pedestrian access and public utilities at the intersection of Delaware Street and Garfield Avenue per Public Works Standard Plan No. 207.