HomeMy WebLinkAboutGeneral Plan Conformance GPC2010001 - Signed ApplicationG
HUNTINGTON BEACH
For your convenience, you may quest
an appointment to submit your
entitlement application by contacting
the Planning Department at 714-536-
5271
City of Huntington Beach
Planning Department
2000 Main Street
Huntington Beach, CA 92648
(714) 536-5271
www.surfcit -hb.or /Cit De artments/Plannin
GENERAL APPLICATION:
Planning Commission
Zoning Administrator
Staff Review
Design Review
aos+C (V 1+
Applicant or Authorized I (Contact Person)
r
aili g Address
City
Tele hone Number:
State Zip
7' Y -- S36_ S-Sv ?
Fax Number:
E-mail Address: :30'SMv 4 . M
t
Property Owner
Mailing Address
1 (LIK C
City State
Tele hone Number:
Fax Number:
E-mail Address:
Zip
FOR OFFICIAL USE ONLY
Present Zone I DM
General Plan Designation
PLANNING APPLICATI N NO.f)((O
ENTITLEMENT $FEE CASE #
Coastal Develo ment Permit CDP
Conditional Use Permit CUP
Desi n Review DR
Entitlement Plan Amendment EPA
General Plan Amendment GPA
Local Coastal Pro ram Amend LCPA
Planned Si n Pro ram PSP
Si n Code Exce tion SCE
Tem ora Use Permit TUP
Variance V
Zonin Ma Amendment ZMA
Zonin Text Amendment ZTA-t
Environmental Review Flood Zone
Earthquake Fault Zone
d
_Exempt
Class Oil DistrictSec
-
.
_Assessment Req. Methane District _
EA / Redevelopment Area
Coastal Area Yes No Noise/CNEL
Categorical Exclusion Seismic Hazard Zone
Cce
-Appeal. _ Non. App Scenic Corridor
Exempt Sec. Military Buffer Zone
VOwnership Verification
Applicant Authorization
APN
_7Plans
-Notification Req.
t/iarrative
Photographs/Slides
-Entertainment Permit
OA approval
/ pmputer Log
,/Map Book Log
jPlans Date Stamped
L
91
www.ceres.ca. ov/ lannin -(services)
Pursuant to:
In Lieu of:
Date Received ' 10
Receipt #
Received by lif/V
Project Planner
Distributed by
Concurrent Cases
Previous Cases
REQUEST (Use additional page if necessary): l.1 TirCCl4(M L { T 4- F / 1%.v / se_' c
S6rek*,EuuT / C-? a C6 > C t 7x (eV 19 ?(. (E-i4)
S c '1T&?? o t 4E #V'JCG:7t S 4-c i cW t S E- t ( / u
7' c Yz e07 6 i A- ANt*c- rto ,lac j .163.L n1 bf n,1'4
1 lZ P0 c2T- t1P7? (A t 10/v,
EXISTING USE:
LOCATION AND DESCRIPTION OF PROPERTY:
• Street Address: 1 C Z N L's
• Nearest Major Intersection:
• Assessor's Parcel Number(s):
• Tract: Block:
Lot Area:
Lot:
I, Print Pro e Owner's name C 17- 0 !- ` U(J rt Al L /`bo N e.tE4 -tf am the property owner of the subject
property and have read and understand all statements including the filing requirements on the reverse side of this application. I hereby
authorize Print A ent's name Cf ( t t to act as my representative and to
bind me in all matters concerning this application. I hereby affirm under penalty of perjury that the foregoing statements, facts and
attachments are true and correct. I understand that this application for entitlement or variance may be denied, modified or approved with
conditions and that such conditions or modifications must be satisfied prior to issuance of buildin p nits.rSignature of
Property Owner Date Authorized Agent Date
ENTITLEMENT NO:.,
APPLICANT:
APPLICATION FORM REVIEW-
Re uest Com fete S ecial Permits, Variances
Pro ert Owner's Si nature or Letter of Authorization
Le al Descri tion/AP No./AP Ma
Veri Zonin
Veri General Plan (Sub-Areas & FAR)
PLANS;:
Pro er Number of Plans
Photo ra hs
Additional Fees Paid
ddress Correct
Narrative Justification for Re uest
Cit View - Com lete
A licant's Name, Address, Tele hone Number
Develo ment Com liance Matrix Entitlement No. On Plans
Com lete and internal) consistent Sets Site Plan, Elevations, Floor Plans, Sections Drawin s)
Accurate, Full Dimensioned, Drawn to Scale and with North Arrow
Must include Property Lines, Street Names, Street Width, Existing and Proposed Buildings, Easements, Adjacent
Im rovements & Uses Floor Plan
A licant's Name, Address, Tele hone Number
DEVELOPMENT:REVIEW REQUEST SENT to Other Departments (Tract Maps ASAP,.)
SeeEntitlementReview Re uest List Memo EP-6R
. ENV On'MENTAL R 'I!,IE W :
Categorical) Exem t I I Ne ative Declaration
Check Miti ation Measures of Previous) a roved EIR/N.D.
COASTAL STATUS;
Not A licable
- Exem t
A ealable Area
Cate oricall Excluded
CONCURRENT PROCESSING Other Entitlements/Fees
FIELD INSPECTION: -
Existin On-Site Use s and Adjacent Uses
Landsca in Condition/ Mature Trees
Grade Differentials with Ad'oinin Lots
PRELIMINARY PLAN CHECK
URBAN DESIGN GUIDELINES
OTHER.ISSUES.
EIR
Non-A ealable Area
Coastal Develo ment Permit
Parkin Lot Condition/ Drivewa s/ Reci rocal Access
Ille al Structures & Additions/ Non-Conformin Si ns
Fences/ Walls - Hei ht/ Condition/ Location
See Desi n, Review Checklist
Flood Plain Easements Previous Entitlements and Conditions
Al uist-Priolo S ecific Plan Area Adjacent Entitlements and Conditions
Seismic Oil Wells Reci rocal Access on Adjacent Pro ert
Hazardous Waste Site Infill Lot Ordinance Pro ert Maintenance Ordinance
Redevelo ment Area DAC Meetin Water uali Mana ement Plan
Affordable Housin Plan Park & Rec. Fees/Re 's Historical
'PROJECT REVIEW MEETING with Plannin Staff
`'SEND FILING STATUS LETTER TO APPLICANT (and property owner, ifdifferen
labels of-Owners
SEND LEGAL NOTICES FOR PUBLIC!H ARING includixt Infill Lan na , 1 a Ttc' bl with labels
- CONTINUED ON BACK SIDE -
andlor,Tenants A 1icant,Site Pro e Owner A ent andM trix
Amendments
OWNERSHIP MAILING LIST AND MAP ACCURACY: Verified,& Most Current, Map and Mailin
PLANNING COMMISSION STUDY-SESSION Send Notices
ENVIRONMENTAL ASSESSMENT COMMM MITTEE Send Notices
LEGAL SERVICES RE UEST SENT Ordinance U' iniom Resolution Zonin Text and Ma
within 30 days.,
include Plannin Coinritissio
DESIGN REVIEW MEETING RE UIRED Materials & Color Board Send'Notices
,SUBDIVISION MEETING RE UIRED' Send'Notices
.'COMM UNITY MEETING for Ma or-or Controversial,Pio ects Send'Notices
Have meetin with A licant if necessa
G:\FORMS\PLANNING\Application Checklist 3b
CITY OF H UN TINGTO! EA CH
PROJECT PROCESSING CHECKLIST
(For Planning Staff Use)
PLANNER:
PROJECT'ADDRE
PREPARE STAFF REPORT/CONDITIONS OFAPPROVA;G:
Pre are Attachments Reduced Size Plans Revised Plans
ENSURE STAFF REPORT IS'DISTRIBUTED TO ALL INTERESTED INDIVIDUALS 11 E N SDAYBE ORE MEETING:
Plannin Commissioners (Linda Wine) Interested Parties
A licant/Pro ert Owner (Call to confirm the are aware of meetin and the received staff re ort)
LATE COMMUNICATIONS SENT TO PC, STAFF'PLANNER, DIRECTOR, PLANNIN ANAGE
PRINCIPAL PLANNER, PUBLIC WORKS & FrRE•STA`FF LIAISONS, APPLICANT v..,(BE SURRTO
'EACH COMMUNICATON WITH THE AGENDA ITEM NUMBER
PLANNING COMMISSION/ ZONING ADMINISTRATOR ' MEETING;
Colored Site Plans, Floor Plans and Elevations
Massin Model
Slides/Photo ra hs
PowerPoint Presentation
After Final Meeting
NOTICE OF ACTION LETTER (WITH CONDITIONS AND CODE REQUIREMENTS) MAILED TO APPLICANT
&/ PROPERTY OWNER (INCLUDE CUSTOMER SURVEY CARD
NOTICE OF ACTION LETTER WITH CONDITIONS AND CODE RE UIREMENTS LINKED TO CITYVIEW
CALL APPLICANT IF THEY DID NOT ATTEND AND/OR TO FOLLOW-UP AND ANSWER ANY QUESTIONS
FOR THEM Customer Service
CE A NOTICE AND MITIGATION MONITORING FEE if re uired
APPEALABLE DEVELOPMENT OR CATEGORICAL EXCLUSION LETTER FOR COASTAL if a licable
PLANS STAMPED WITH NOTED ACTION
MINUTES IN FILE
ORGANIZE ZONING FILE AND PLACE IN FILE CABINET see De t. Polic Memo for file or anization
G:\FORMS\PLANNING\Application Checklist 3b
0 0
Cit of Huntin ton Beach
2000 MAIN STREET CALIFORNIA 92648
DEPARTMENT OF PLANNING AND BUILDING
www.huntin tonbeachca. ov
Plannin Division
714.536.5271
April 2, 2010
City of Huntington Beach
Attn: Josh McDonald
2000 Main Street
Huntington Beach, CA 92648
ENTITLEMENT: General Plan Conformance 2010-001
PROJECT ADDRESS: 21632 Newland
PROPERTY OWNER : City of Huntington Beach.
2000 Main Street
Huntington Beach, CA 92648
DATE RECEIVED AT
ZONING COUNTER: March 31, 2010
Buildin Division
714.536.5241
PROJECT PLANNER : Rosemary Medel, Associate Planner; (714) 374-1684; email:
rmedel@surfcity-hb.org
Dear Applicant:
Thank you for submitting your entitlement to the City of Huntington Beach, Planning Department. The
assigned Project Planner is responsible for processing your entitlement and will be responsible for the
following tasks:
Reviewing your entitlement for completeness;
Evaluating the project for conformance with the General Plan;
Reviewing plans for compliance with the Zoning Code, Design Guidelines, and applicable City Ordinances;
Preparation of environmental documents pursuant to the California Environmental Quality Act (CEQA);
Analyzing the site plan layout and, if applicable, the floor plans and elevations;
Evaluating the project for compatibility with, and potential impacts to, surrounding uses/structures;
Coordinating issues related to the Fire Dept., Public Works Dept., Building and Safety Dept., etc.;
Obtaining other City department's comments relative to the project;
Coordinating any necessary community meetings;
Preparing a staff report and recommendation (approval/denial) with suggested findings and conditions of
approval
Scheduling the project for a public hearing; and
Assisting you with any follow-up actions and/or conditions of approval.
Entitlement
Page Two
Please be advised that a Notice of Filing Status letter will be sent to you regarding the status/completeness
of your entitlement(s) notifying you of the pending hearing date within 30 da s of receipt of the
entitlement(s) at the zoning counter. The letter will indicate one of the following circumstances:
Entitlement Deemed Incomplete; additional information is required (e.g., revised plans,
supplemental plans, environmental information, additional entitlements, etc.); or
Entitlement Deemed Complete; the Project Planner is continuing to process your entitlement(s)
and you will be notified as to when your project will be scheduled for a hearing by (1) the
Design Review Board, (2) the Zoning Administrator, or (3) the Planning Commission.
The three scenarios listed below are the subsequent steps to the above notification:
If the project is subject to Planning Commission review, a staff report with a full analysis of the
proposal will be prepared. Your plans and supplemental information will be attached to the staff
report. A copy of the staff report will be mailed to you prior to the hearing;
If the project is scheduled for Zoning Administrator review, an executive summary with staff's
recommendation for the project will be prepared. A copy of the executive summary will be
mailed to you prior to the hearing;
If the project is scheduled for Design Review Board action, no staff report will be prepared,
however staff will advise you of the staff recommendation prior to the meeting.
Generally, the complete processing time from submittal to final action by the reviewing body and
expiration of the appeal period is as follows:
Design Review Board: 30-45 days (dependent upon the complexity of your project)
Zoning Administrator : 2-3 months (dependent upon the complexity of your project)
Planning Commission : 4-6 months (dependent upon the complexity of your project)
Please note: When Zone Changes, General Plan Amendments, Tentative Maps, or preparation of
environmental documents are involved, additional processing time is necessary.
Please direct your questions and communications to the assigned Project Planner . If you have any
subsequent comments or need additional clarification, please contact me at 714-536-5271. Thank you in
advance for your interest in Huntington Beach - we look forward to working with you!
Sin rely,
Herb Fauland
Planning Manager
xc: Property Owner
Project File