HomeMy WebLinkAboutGeneral Plan Conformance GPC2012003 - Signed ApplicationHUNTINGTON BEACH
•
For your convenience, you may quest
an appointment to submit your
entitlement application by contacting the
Planning Department at 714-536-5271
FOR OFFICIAL USE ONLY
City of Huntington Beach
Planning Department
2000 Main Street
Huntington Beach, CA 92648
(714) 536-5271
www.surfcit -hb.or /Cit De artments/Plannin
GENERAL APPLICATION:
( Planning Commission
Zoning Administrator
Staff Review
Design Review
Qza q >
Applicant or Authorized Agent (Contact Person)
o
Mailing Address
City State
Tele hone Number:
Zip
Fax Number:
E-mail Address: 6rti rd 11 -6h.6j
Property Owner
Mailing Address
City
Tele hone Number:
Fax Number:
E-mail Address:
REQUEST:
EXISTING USE:
State Zip
LOCATION AND DESCRIPTION OF PROPERTY:
• Street Address:
• Nearest Major Intersection:
• Assessor's Parcel Number(s):Lot Area:
• Tract: Block: Lot:
I, Print Pro ert owners name am the property owner of the subject
property and have read and understand all statements including the filing requirements on the reverse side of this application. I hereby
authorize Print A ent's name to act as my representative and to
bind me in all matters concerning this application. I hereby affirm under penalty of perjury that the foregoing statements, facts and
attachments are true and correct. I understand that this application for entitlement or variance may be denied, modified or approved with
conditions and that such conditions or modifications must be satisfied prior to issuance of building permits. I understand that by filing
the application, information on the application including, but not neces rily limited to the name and address will be included on public
records that are posted on the internet.
Signature of t
Present Zone
General Plan Designation
PLANNING APPLICATION NO.
ENTITLEMENT $FEE
Coastal Develo ment Permit
Conditional Use Permit
Desi n Review
Entitlement Plan Amendment
General Plan Amendment
Local Coastal Pro ram Amend
Planned Si n Pro ram
Si n Code Exce tion
Tern or Use Permit
Variance
Zonin Ma Amendment
Zonin Text Amendment
11
Environmental Review
_Exempt
Sec. Class
-Assessment Req.
EA
ce
DM :
ZO12 -~o) b%
CASE #
CDP -
CUP -
DR -
EPA -
GPA -
LCPA -
PSP -
SCE -
TUP -
v -.
ZMA
ZTA =
G12'ae3.
Flood Zone
Earthquake Fault Zone
Oil District
Methane District
Redevelopment Area
Coastal Area Yes-No-Noise/CNEL
_ Categorical Exclusion Seismic Hazard Zone
Appeal. Nona App Scenic Corridor
Exempt Sec: Residential Inf U
Military Buffer Zone
w ceres.ca. ov lannin (services)
Ownership Verification Pursuant to:_
Notification Req. Date Received
Plans. .
APN
Applicant Authorization
-Narrative Receipt #
Photographs/Slides Received by_
HOA approval • . Distributed by
Entertainment Permit Project Planner.
Plans Date Stamped Previous Cases
Map Book Log .
Computer Log Concurrent Cases
U B VA
2)
Property Owner Date Authorize Agent Date
.° Cit of Huntin ton Beach
2000 MAIN STREET CALIFORNIA 92648
DEPARTMENT OF PLANNING AND BUILDING
www.huntin tonbeachca. ov
Plannin Division Buildin Division
714.536.5271 714.536.5241
June 22, 2012
City of Huntington Beach
Todd Broussard
2000 Main Street
Huntington Beach, CA 92648
ENTITLEMENT : General Plan Conformance 12-03
PROJECT ADDRESS: Citywide
PROPERTY OWNER : City of Huntington Beach
2000 Main Street
Huntington Beach, CA 92648
DATE RECEIVED AT
ZONING COUNTER: June 20, 2012
PROJECT PLANNER: Rosemary Medel, Associate Planner ; (714)374-1684; email:
rmedel@surfcity-hb.org
Dear Applicant:
Thank you for submitting your entitlement to the City of Huntington Beach, Planning Department. The
assigned Project Planner is responsible for processing your entitlement and will be responsible for the
following tasks:
Reviewing your entitlement for completeness;
Evaluating the project for conformance with the General Plan;
Reviewing plans for compliance with the Zoning Code, Design Guidelines, and applicable City Ordinances;
Preparation of environmental documents pursuant to the California Environmental Quality Act (CEQA);
Analyzing the site plan layout and, if applicable, the floor plans and elevations;
Evaluating the project for compatibility with, and potential impacts to, surrounding uses/structures;
Coordinating issues related to the Fire Dept., Public Works Dept., Building and Safety Dept., etc.;
Obtaining other City department's comments relative to the project;
Coordinating any necessary community meetings;
Preparing a staff report and recommendation (approval/denial) with suggested findings and conditions of
approval
Scheduling the project for a public hearing; and
Assisting you with any follow-up actions and/or conditions of approval.
Entitlement
Page Two
Please be advised that a Notice of Filing Status letter will be sent to you regarding the status/completeness
of your entitlement(s) notifying you of the pending hearing date within 30 da s of receipt of the
entitlement(s) at the zoning counter. The letter will indicate one of the following circumstances:
Entitlement Deemed Incomplete; additional information is required (e.g., revised plans,
supplemental plans, environmental information, additional entitlements, etc.); or
Entitlement Deemed Complete; the Project Planner is continuing to process your entitlement(s)
and you will be notified as to when your project will be scheduled for a hearing by (1) the
Design Review Board, (2) the Zoning Administrator, or (3) the Planning Commission.
The three scenarios listed below are the subsequent steps to the above notification:
If the project is subject to Planning Commission review, a staff report with a full analysis of the
proposal will be prepared. Your plans and supplemental information will be attached to the staff
report. A copy of the staff report will be mailed to you prior to the hearing;
If the project is scheduled for Zoning Administrator review, an executive summary with staffs
recommendation for the project will be prepared. A copy of the executive summary will be
mailed to you prior to the hearing;
If the project is scheduled for Design Review Board action, no staff report will be prepared,
however staff will advise you of the staff recommendation prior to the meeting.
Generally, the complete processing time from submittal to final action by the reviewing body and
expiration of the appeal period is as follows:
Design Review Board: 45-60 days (dependent upon the complexity of your project)
Zoning Administrator : 3-4 months (dependent upon the complexity of your project)
Planning Commission : 4-6 months (dependent upon the complexity of your project)
Please note: When Zone Changes, General Plan Amendments, Tentative Maps, or preparation of
environmental documents are involved, additional processing time is necessary.
Please direct your questions and communications to the assigned Project Planner at 714-536-5271. If
you have any subsequent comments or need additional clarification, please contact me at the same
number. Thank you in advance for your interest in Huntington Beach - we look forward to working with
you!
Sinc ely,
Herb Fauland
Planning Manager
xc: Property Owner
Project File