Scott Hess, AICP, Director of Planning and Building
Rosemary Medel, Associate Planner
July 24, 2012
SUBJECT: GENERAL PLAN CONFORMANCE NO. 12-003 (CAPITAL IMPROVEMENT
PROGRAM FOR FISCAL YEAR 2012/13)
APPLICANT: City of Huntington Beach, Public Works Department, 2000 Main Street, Huntington
Beach, CA 92648
PROPERTY OWNER: City of Huntington Beach, 2000 Main Street, Huntington Beach, CA 92648
LOCATION: Citywide
STATEMENT OF ISSUE:
• General Plan Conformance No. 12-003 request:
- Evaluate Capital Improvement Program for Fiscal Year 2012/13for compliance with the General
Plan.
• Staffs Recommendation: Approve General Plan Conformance No. 12-003 based upon the following:
- The proposed projects conform to the goals, objectives, and policies of the General Plan.
RECOMMENDATION:
Motion to:
"Adopt Resolution No. 1662, approving General Plan Conformance No. 12-003 with findings
(Attachment Nos. 1 and 2)."
ALTERNATIVE ACTION:
The Planning Commission may take alternative actions such as:
A. "Deny General Plan Conformance No. 12-003 with findings for denial."
B. "Continue General Plan Conformance No. 12-003 and direct staff accordingly."
PROJECT PROPOSAL:
General Plan Conformance No.12-003 represents a request, pursuant to Section 65401 of the California
Government Code, by the City of Huntington Beach to determine if the 2012/13 Capital Improvement
Program (CIP) is in conformance with the goals, objectives, and policies of the General Plan. The
2012/13 CIP is a list of proposed projects recommended for planning, initiation, or construction during
the next fiscal year.
ISSUES:
General Plan Con ormance:
The only issue to consider as part of this request is if the proposed CIP for fiscal year 2012/13 is in
conformance to the City's General Plan. The CIP conforms to the following goals, objectives, and
policies of the General Plan:
1. DRAINAGE IMPROVEMENTS
A. Planned Pro'ects:
1. First Street Diversion - SCADA Project
Design and install a SCADA system and flow weir for the First Street Urban Runoff
Discharge Permit with the Orange County Sanitation District.
2. ,Meredith Pump Station
Project will expand the existing pump station building footprint to accommodate
higher capacity engines.
3. Northwest Catch Basin Retrofit Project
Retrofit 155 existing catch basins with Automatic Retractable Screens.
4. Slater Channel Improvements
Project will improve the areas adjacent to the Slater channel to mitigate erosion being
caused by runoff.
B. General Plan Policies:
U. 3 Provide a flood control system which is able to support the permitted land uses which
preserving the public safety; upgrade existing deficient systems; and pursue funding
sources to reduce the costs of flood control provisions in the City.
U.3.1 Ensure that adequate storm drain and flood control facilities are provided and
properly maintained in order to protect life and property from flood hazards.
U.3.1.1 Maintain existing public storm drains and flood control facilities, upgrade and
expand storm drain and flood control facilities.
PC Staff Report - 7/24/12 2 (12sr32 GPC 12-003)
II. FACILITY IMPROVEMENTS
A. Planned Pro*ects:
1. Various Roof Replacements
Replace the existing roof of various City buildings, which have reached the end of their
useful life. The facilities include: City Pool and Gym, Gothard Fire Station, Joint
Powers Training Center, Oak View Community Center, and Newland House.
B. General Plan Policies:
LU 13.1.1 Allow for the continuation of existing public and private institutional, cultural,
educational, and health uses at their present locations and development of new uses in
areas designated on the Land Use Plan Map in accordance with Policy 7.1.1.
PF 6.1.3 Maintain or improve the governmental facilities and services in order to meet
the adopted levels of service and standards established in the Growth Management
Element.
III. NEIGHBORHOOD IMPROVEMENTS
A. Planned Pro'ects
1. Keelson Lane
This project will rehabilitate Keelson Lane, including sidewalk, curb & gutter, and
pavement.
2. Lakeview Drive
This project will install a retaining wall and rebuild the sidewalk adjacent to
Huntington Lake.
3. 10th Street Lighting Replacement
Replace all elements of a six block street light circuit on 10th Street, from PCH to
Palm Avenue. The new circuit will provide a more reliable, standard voltage
4. Sunset Beach Improvements
This project will provide improvements to the Sunset Beach Community, including
Entry Sign(s) and Landscape Improvements to the Warner Turnaround.
B. General Plan Policies:
CE 1.2.1 Enhance circulation system standards for roadway and intersection
classifications, right -of-way width, pavement width, design speed, capacity and associated
features such as medians and bicycle lanes.
CE 6.1.6 Maintain existing pedestrian facilities and require new development provide
pedestrian walkways and bicycle routes between developments, schools, and public
facilities.
PC Staff Report - 7/24/12 3 (12sr32 GPC 12-003)
CE 7.1.7 Continue to construct landscaped medians in existing major and primary arterial
streets and continue to require the construction of landscaped medians in new
developments.
CE 7.3 Protect scenic corridors and. open space/landscape areas by blending man-made
features with the natural environment.
CE 7.3.1 Require that new development include landscaping that is compatible with visual
character of the designed scenic highways and corridors.
IV. PARKS AND BEACHES
A. Planned Pro'ects
1. Beach Parking Lot
This project will rehabilitate the parking lot between Beach Blvd and Huntington St.
2. Central Park North Parking Lot
This project will rehabilitate the parking lot to mitigate flooding.
3. Edison Park Sidewalk
This project will replace lifted and broken sections of sidewalk.
4. Murdy Community Center Patio
Reconfiguration of patio and addition of shade structure.
5. Shipley Parking Lot
This project would install a permanent parking lot.
B. General Plan Policies:
CE 5 Provide sufficient, well designed and convenient on and off street parking facilities
throughout the City.
CE 5.1 Balance the supply of parking with the demand for parking.
CE 5.1.1 Maintain an adequate supply of parking that supports the present level of demand
and allow for the expected increase in private transportation use.
RCS 4 Ensure recreation facilities are renovated and upgraded to meet the current
recreational interests of adults and youth.
RCS 4.1 Improve and modernize existing parks and facilities to overcome existing design
deficiencies and deteriorated conditions.
PC Staff Report - 7/24/12 4 (12sr32 GPC 12-003)
IV. SEWER IMPROVEMENTS
A. Planned Pro'ects
1. Sewer Replacement Project
Sewer line in Beach Boulevard (Talbert to Warner) will be upsized to meet current and
future capacity demands.
B. General Plan Policies:
U. 2 Provide a wastewater collection and treatment system which is able to support
permitted land uses; upgrade existing deficient systems; and pursue funding sources to
reduce costs of wastewater service provision in the City.
U.2.1 Ensure the City provides and maintains a wastewater collection and treatment
facilities system which adequately conveys and treats wastewater generated by existing
and planned development at a maximized cost efficiency.
U.2.1.5 Maintain, upgrade, and expand existing wastewater collection and treatment
facilities.
V. STREETS AND TRANSPORTATION IMPROVEMENTS
A. Planned Pro*ects
1. Beach at Edinger
Restripe to add a fourth northbound through lane on Beach Boulevard from
approximately 500 feet south of Edinger Avenue to 460 feet north of Edinger.
2. Edinger Avenue Traffic Signal Synchronization
Provide communication and operational upgrades for greater system reliability to
improve flows and minimize delays.
3. Gothard/Heil Traffic Signal Modification
Modify the traffic signal at the intersection of Gothard and Heil to provide left turn
arrows for east-west traffic.
4. Gothard/Talbert Traffic Signal Modification
Modify the traffic signal at the intersection of Gothard and Talbert to provide left turn
arrows for east-west traffic.
5. Yorktown/Huntington Intersection Improvements
Develop alternatives, design and construct improvements to address existing accident
patterns.
6. Stacey - Clegg Safe Routes To School
Installation of curb ramps and the upgrading of warning signs in the vicinity of Stacey
Middle School and Clegg Elementary School.
PC Staff Report - 7/24/12 5 (12sr32 GPC 12-003)
B. General Plan Policies:
CE 1.2.1 Enhance circulation system standards for roadway and intersection
classifications, right-of-way width, pavement width, design speed, capacity and associated
features such as medians and bicycle lanes.
CE 1.2.3 Maintain primary truck routes that sustain an effective transport of commodities
while mitigating the negative impacts on local circulation and on noise sensitive land.
CE 2.1.1 Maintain a city-wide level of service (LOS) not to exceed LOS "D" for
intersections during the peak hours.
CE 2.1.2 Maintain a city-wide level of service (LOS) for links not to exceed LOS "C" for
daily traffic with the exception of Pacific Coast Highway south of Brookhurst Street.
CE 2.1.3 Identify and improve roadways and intersections that are approaching, or have
reached, unacceptable levels of service.
CE 6.1.10 Implement appropriate traffic devices and operational programs throughout the
community to ensure that conflicts between pedestrians, bicycles, and vehicles are
minimized and safety enhanced.
UD 1.3.2 Provide for the implementation of streetscape and landscape improvements
along the major commercial corridors, through public capital improvement programs,
business district improvements, or other techniques as funding is available.
VI. WATER IMPROVEMENTS
A. Planned Pro'ects:
1. Slater Pump Station Modification
Design and install new three phase power supply from Graham Street and up to an
electric 10, 000 gpm pump system to address increase water flowing into Slater Pump
Station due to increase in groundwater injection by Orange County Water District
(OCWD) for the purpose of operating the salt water barrier.
B. General Plan Policies:
U.1 Provide a water supply system which is able to meet the projected water demands;
upgraded deficient systems and expand water treatment, supply, and distributed facilities;
and pursue funding sources to reduce the costs of water provision in the City and develop
fair rate structures to ensure high quality water service.
U 1.1 Maintain a system of water supply and distribution facilities capable of meeting
existing and future daily and peak demands, including fire flow requirements in a timely
and cost efficient manner.
PC Staff Report - 7/24/12 6 (12sr32 GPC 12-003)
U.1.1.3 Continue to evaluate the adequacy of the water supply and distribution system.
The Capital Improvement Program (CIP) ensures that City facilities continue to be adequately accessible
and maintained in order to provide services to residents and visitors. CIP projects will provide continued
improvements to sidewalks, curbs, gutters and pavement. Landscaping is enhanced to continue to
improve the visual character of the city. The CIP ensures that an adequate amount of new circulation and
access improvements are developed and maintained to support existing and future development. Capital
improvements maintain an integral circulation infrastructure allowing the movement of people and goods
throughout the City. The CIP program provides and maintains an adequate citywide water supply system,
improved collection and treatment of wastewater and ensures that sufficient parking facilities are provided
citywide.
Zonin Com liance: Not applicable.
Urban Desi n Guidelines Con ormance: Not applicable.
Environmental Status:
The General Plan conformance review is categorically exempt pursuant to Section 15306, Class 6 of the
California Environmental Quality Act, which states that information collection which does not result in
major disturbance to an environmental resource is exempt from any environmental review.
Coastal Status: Not applicable.
Redevelo ment Status: Not applicable.
Desi n Review Board: Not applicable.
Subdivision Committee: Not applicable.
Other De artments Concerns and Re uirements:
The Public Works Department, acting as applicant for General Plan Conformance No. 12-003, has
reviewed and is processing the Capital Improvement Program request through the City Council. There are
no concerns from other departments.
Public Noti ication:
General Plan Conformances are non-public hearing items and do not require legal public notification.
A lication Processin Dates:
DATE OF COMPLETE APPLICATION: MANDATORY PROCESSING DATE S :
June 20, 2012 August 29, 2011 (within 40 days of submittal)
PC Staff Report - 7/24/12 7 (12sr32 GPC 12-003)
ANALYSIS:
The Government Code of the State of California, Section 65401, requires that a local planning agency
review a list of proposed projects recommended for planning, initiation, or construction during the
ensuing fiscal year for conformance with the local General Plan. This list of proposed projects is
contained in the Capital Improvement Program (CIP). The Public Works Department has submitted a
CIP for fiscal year 2012/13. The role of the Planning Commission in reviewing a CIP is to ensure the
conformity of each project with the goals, objectives, and policies of the General Plan. The benefits and
funding source for individual projects listed in the CIP will then be reviewed and approved by the City
Council.
Staff has identified goals, objectives, and policies that are applicable to the CIP in the General Plan
Conformance section of this staff report. Because the proposed projects further the goals, objectives, and
policies of the General Plan, staff recommends the Planning Commission approve General Plan
Conformance No. 12-003 finding that the proposed CIP is in conformance with the General Plan.
ATTACHMENTS:
1. Suggested Findings of Approval - GPC No. 12-003
2. Draft Planning Commission Resolution No. 1662
SH:MBB:RM:kd
PC Staff Report - 7/24/12 8 (12sr32 GPC 12-003)
ATTACHMENT NO. 1
FINDINGS FOR APPROVAL
GENERAL PLAN CONFORMANCE NO. 12-003
FINDINGS FOR PROJECTS EXEMPT FROM CE A:
The Planning Commission finds that the proposed project will not have any significant effect on the
environment and is exempt from the provisions of the California Environmental Quality Act (CEQA)
pursuant to Section 15306 of the CEQA Guidelines because the project involves information collection
which does not result in major disturbance to an environmental resource.
FINDINGS FOR APPROVAL - GENERAL PLAN CONFORMANCE NO. 12-003:
1. The 2012/13 Capital Improvement Program conforms to the following goals, objectives, and
policies of the General Plan:
U. 2 Provide a wastewater collection and treatment system which is able to support permitted land
uses; upgrade existing deficient systems; and pursue funding sources to reduce costs of wastewater
service provision in the City.
U.2.1 Ensure the City provides and maintains a wastewater collection and treatment facilities
system which adequately conveys and treats wastewater generated by existing and planned
development at a maximized cost efficiency.
U.2.1.5 Maintain, upgrade, and expand existing wastewater collection and treatment facilities.
U. 3 Provide a flood control system which is able to support the permitted land uses which
preserving the public safety; upgrade existing deficient systems; and pursue funding sources to
reduce the costs of flood control provisions in the City.
U.3.1 Ensure that adequate storm drain and flood control facilities are provided and properly
maintained in order to protect life and property from flood hazards.
U.3.1.1 Maintain existing public storm drains and flood control facilities, upgrade and expand
storm drain and flood control facilities.
LU 13.1.1 Allow for the continuation of existing public and private institutional, cultural,
educational, and health uses at their present locations and development of new uses in areas
designated on the Land Use Plan Map in accordance with Policy 7.1.1.
PF 6.1.3 Maintain or improve the governmental facilities and services in order to meet the
adopted levels of service and standards established in the Growth Management Element.
(12sr32GPC No. 12-003) Attachment No. 1.1
CE 1.2.1 Enhance circulation system standards for roadway and intersection classifications, right-
of-way width, pavement width, design speed, capacity and associated features such as medians and
bicycle lanes.
CE 1.2.3 Maintain primary truck routes that sustain an effective transport of commodities while
mitigating the negative impacts on local circulation and on noise sensitive land.
CE 2.1.1 Maintain a city-wide level of service (LOS) not to exceed LOS "D" for intersections
during the peak hours.
CE 2.1.2 Maintain a city-wide level of service (LOS) for links not to exceed LOS "C" for daily
traffic with the exception of Pacific Coast Highway south of Brookhurst Street.
CE 2.1.3 Identify and improve roadways and intersections that are approaching, or have reached,
unacceptable levels of service.
CE 5 Provide sufficient, well designed and convenient on and off street parking facilities
throughout the City.
CE 5.1 Balance the supply of parking with the demand for parking.
CE 5.1.1 Maintain an adequate supply of parking that supports the present level of demand and
allow for the expected increase in private transportation use.
CE 6.1.6 Maintain existing pedestrian facilities and require new development provide pedestrian
walkways and bicycle routes between developments, schools, and public facilities.
CE 6.1.10 Implement appropriate traffic devices and operational programs throughout the
community to ensure that conflicts between pedestrians, bicycles, and vehicles are minimized and
safety enhanced.
CE 7.1.7 Continue to construct landscaped medians in existing major and primary arterial streets
and continue to require the construction of landscaped medians in new developments.
CE 7.3 Protect scenic corridors and open space/landscape areas by blending man-made features
with the natural environment.
CE 7.3.1 Require that new development include landscaping that is compatible with visual
character of the designed scenic highways and corridors.
RCS 4 Ensure recreation facilities are renovated and upgraded to meet the current recreational
interests of adults and youth.
RCS 4.1 Improve and modernize existing parks and facilities to overcome existing design
deficiencies and deteriorated conditions.
(I2sr32GPC No. 12-003) Attachment No. 1.2
UD 1.3.2 Provide for the implementation of streetscape and landscape improvements along the
major commercial corridors, through public capital improvement programs, business district
improvements, or other techniques as funding is available.
U.1 Provide a water supply system which is able to meet the projected water demands; upgraded
deficient systems and expand water treatment, supply, and distributed facilities; and pursue funding
sources to reduce the costs of water provision in the City and develop fair rate structures to ensure
high quality water service.
U 1.1 Maintain a system of water supply and distribution facilities capable of meeting existing and
future daily and peak demands, including fire flow requirements in a timely and cost efficient
manner.
U.1.1.3 Continue to evaluate the adequacy of the water supply and distribution system.
The Capital Improvement Program (CIP) ensures that City facilities continue to be adequately
accessible and maintained in order to provide services to residents and visitors. CIP projects will
provide continued improvements to sidewalks, curbs, gutters and pavement. Landscaping is enhanced
to continue to improve the visual character of the city. The CIP ensures that an adequate amount of
new circulation and access improvements are developed and maintained to support existing and future
development. Capital improvements maintain an integral circulation infrastructure allowing the
movement of people and goods throughout the City. The CIP program provides and maintains an
adequate citywide water supply system, improved collection and treatment of wastewater and ensures
that sufficient parking facilities are provided citywide.
(12sr32GPC No. 12-003) Attachment No. 1.3
RESOLUTION NO. 1662
A RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF HUNTINGTON BEACH FINDING THE CAPITAL
IMPROVEMENTS PROGRAM FOR FISCAL YEAR 2012/2013
IN CONFORMANCE WITH THE GOALS, OBJECTIVES,
AND POLICIES OF THE GENERAL PLAN
(GENERAL PLAN CONFORMANCE NO. 2012-03)
WHEREAS , the Government Code of the State of California, Section 65401, provides
that a local planning agency review a list of the proposed public works projects recommended
for planning, initiation, or construction during the ensuing fiscal year as to conformity with the
local general plan; and
WHEREAS, the Department of Public Works has submitted a coordinated list of all
capital projects recommended by City departments for the ensuing fiscal year in the form of a
Capital Improvement Projects List for Fiscal Year 2012/2013; and
WHEREAS, staff has indicated applicable General Plan goals, objectives, and policies
for each project included in the Fiscal Year 2012/2013 Capital Improvements Program to
establish conformance with the General Plan (Exhibit A).
NOW, THEREFORE, BE IT RESOLVED THAT the Planning Commission of the
City of Huntington Beach finds the Capital Improvement Program for Fiscal Year 2012/2013 in
conformance with the goals, objectives, and policies of the General Plan.
PASSED, APPROVED AND ADOPTED by the Planning Commission of the City of
Huntington Beach at a regular meeting held on the 24th day of July 2012, by the following roll
call vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
ATTEST:
Scott Hess, Secretary
Res 1662
Planning Commission Chairperson
ATTACHMENT NO.
EXHIBIT A
PLANNED PROJECTS AND GENERAL PLAN POLICIES FOR
CAPITAL IMPROVEMENTS PROGRAM FY 2012/2013
(GENERAL PLAN CONFORMANCE NO. 12-03)
The following is a list of planned projects for Fiscal Year 2012/2013 Capital Improvements
Program (CIP) that requires General Plan Conformance. The list is divided into categories by
subject. Below each project group is a listing of the relative General Plan policies.
1. DRAINAGE IMPROVEMENTS
A. Planned Pro'ects:
1. First Street Diversion - SCADA Project
Design and install a SCADA system and flow weir for the First Street Urban
Runoff Discharge Permit with the Orange County Sanitation District.
2. Meredith Pump Station
Project will expand the existing pump station building footprint to accommodate
higher capacity engines.
3. Northwest Catch Basin Retrofit Project
Retrofit 155 existing catch basins with Automatic Retractable Screens.
4. Slater Channel Improvements
Project will improve the areas adjacent to the Slater channel to mitigate erosion
being caused by runoff.
B. General Plan Policies:
U. 3 Provide a flood control system which is able to support the permitted land uses
which preserving the public safety; upgrade existing deficient systems; and pursue
funding sources to reduce the costs of flood control provisions in the City.
U.3.1 Ensure that adequate storm drain and flood control facilities are provided and
properly maintained in order to protect life and property from flood hazards.
U.3.1.1 Maintain existing public storm drains and flood control facilities, upgrade
and expand storm drain and flood control facilities.
II.FACILITY IMPROVEMENTS
A. Planned Pro'ects:
1. Various Roof Replacements
Replace the existing roof of various City buildings, which have reached the end
of their useful life. The facilities include: City Pool and Gym, Gothard Fire
Station, Joint Powers Training Center, Oak View Community Center, and
Newland House.
ATTACHMENT NO.-
I CIP 2012/13
B. General Plan Policies:
LU 13.1.1 Allow for the continuation of existing public and private institutional,
cultural, educational, and health uses at their present locations and development of
new uses in areas designated on the Land Use Plan Map in accordance with Policy
7.1.1.
PF 6.1.3 Maintain or improve the governmental facilities and services in order to
meet the adopted levels of service and standards established in the Growth
Management Element.
III. NEIGHBORHOOD IMPROVEMENTS
A. Planned Pro'ects
1. Keelson Lane
This project will rehabilitate Keelson Lane, including sidewalk, curb & gutter,
and pavement.
2. Lakeview Drive
This project will install a retaining wall and rebuild the sidewalk adjacent to
Huntington Lake.
3. 10th Street Lighting Replacement
Replace all elements of a six block street light circuit on 10th Street, from PCH
to Palm Avenue. The new circuit will provide a more reliable, standard voltage
4. Sunset Beach Improvements
This project will provide improvements to the Sunset Beach Community,
including Entry Sign(s) and Landscape Improvements to the Warner Turnaround.
B. General Plan Policies:
CE 1.2.1 Enhance circulation system standards for roadway and intersection
classifications, right-of-way width, pavement width, design speed, capacity and
associated features such as medians and bicycle lanes.
CE 6.1.6 Maintain existing pedestrian facilities and require new development
provide pedestrian walkways and bicycle routes between developments, schools, and
public facilities.
CE 7.1.7 Continue to construct landscaped medians in existing major and primary
arterial streets and continue to require the construction of landscaped medians in new
developments.
CE 7.3 Protect scenic corridors and open space/landscape areas by blending man-
made features with the natural environment.
ATTACHMENT NO. c2-3
2 CIP 2012/1,3
CE 7.3.1 Require that new development include landscaping that is compatible with
visual character of the designed scenic highways and corridors.
IV. PARKS AND BEACHES
A. Planned Pro'ects
1. Beach Parking Lot
This project will rehabilitate the parking lot between Beach Blvd. and
Huntington St.
2. Central Park North Parking Lot
This project will rehabilitate the parking lot to mitigate flooding.
3. Edison Park Sidewalk
This project will replace lifted and broken sections of sidewalk
4. Murdy Community Center Patio
Reconfiguration of patio and addition of shade structure.
5. Shipley Parking Lot
This project would install a permanent parking lot.
B. General Plan Policies:
CE 5 Provide sufficient, well designed and convenient on and off street parking
facilities throughout the City.
CE 5.1 Balance the supply of parking with the demand for parking.
CE 5.1.1 Maintain an adequate supply of parking that supports the present level of
demand and allow for the expected increase in private transportation use.
RCS 4 Ensure recreation facilities are renovated and upgraded to meet the current
recreational interests of adults and youth.
RCS 4.1 Improve and modernize existing parks and facilities to overcome existing
design deficiencies and deteriorated conditions.
IV. SEWER IMPROVEMENTS
A. Planned Pro'ects
1. Sewer Replacement Project
Sewer line in Beach Boulevard (Talbert to Warner) will be upsized to meet
current and future capacity demands.
ATTACHMENT NO. -
3 CIP 2012/13
B. General Plan Policies:
U. 2 Provide a wastewater collection and treatment system which is able to support
permitted land uses; upgrade existing deficient systems; and pursue funding sources
to reduce costs of wastewater service provision in the City.
U.2.1 Ensure the City provides and maintains a wastewater collection and treatment
facilities system which adequately conveys and treats wastewater generated by
existing and planned development at a maximized cost efficiency.
U.2.1.5 Maintain, upgrade, and expand existing wastewater collection and treatment
facilities.
V. STREETS AND TRANSPORTATION IMPROVEMENTS
A. Planned Pro Sects
1. Beach at Edinger
Restripe to add a fourth northbound through lane on Beach Boulevard from
approximately 500 feet south of Edinger Avenue to 460 feet north of Edinger.
2. Edinger Avenue Traffic Signal Synchronization
Provide communication and operational upgrades for greater system reliability
to improve flows and minimize delays.
3. Gothard/Heil Traffic Signal Modification
Modify the traffic signal at the intersection of Gothard and Heil to provide left
turn arrows for east-west traffic.
4. Gothard/Talbert Traffic Signal Modification
Modify the traffic signal at the intersection of Gothard and Talbert to provide left
turn arrows for east-west traffic.
5. Yorktown/Huntington Intersection Improvements
Develop alternatives, design and construct improvements to address existing
accident patterns.
6. Stacey - Clegg Safe Routes To School
Installation of curb ramps and the upgrading of warning signs in the vicinity of
Stacey Middle School and Clegg Elementary School.
B. General Plan Policies:
CE 1.2.1 Enhance circulation system standards for roadway and intersection
classifications, right-of-way width, pavement width, design speed, capacity and
associated features such as medians and bicycle lanes.
CE 1.2.3 Maintain primary truck routes that sustain an effective transport of
commodities while mitigating the negative impacts on local circulation and on noise
sensitive land.
ATTACHMENT NO.
4 CIP 2012/13
CE 2.1.1 Maintain a city-wide level of service (LOS) not to exceed LOS "D" for
intersections during the peak hours.
CE 2.1.2 Maintain a city-wide level of service (LOS) for links not to exceed LOS
"C" for daily traffic with the exception of Pacific Coast Highway south of
Brookhurst Street.
CE 2.1.3 Identify and improve roadways and intersections that are approaching, or
have reached, unacceptable levels of service.
CE 6.1.10 Implement appropriate traffic devices and operational programs
throughout the community to ensure that conflicts between pedestrians, bicycles, and
vehicles are minimized and safety enhanced.
UD 1.3.2 Provide for the implementation of streetscape and landscape
improvements along the major commercial corridors, through public capital
improvement programs, business district improvements, or other techniques as
funding is available.
VI. WATER IMPROVEMENTS
A. Planned Pro'ects:
1. Slater Pump Station Modification
Design and install new three phase power supply from Graham Street and up to
an electric 10, 000 gpm pump system to address increase water flowing into
Slater Pump Station due to increase in groundwater injection by Orange County
Water District (OCWD) for the purpose of operating the salt water barrier.
B. General Plan Policies:
U.1 Provide a water supply system which is able to meet the projected water
demands; upgraded deficient systems and expand water treatment, supply, and
distributed facilities; and pursue funding sources to reduce the costs of water
provision in the City and develop fair rate structures to ensure high quality water
service.
U 1.1 Maintain a system of water supply and distribution facilities capable of
meeting existing and future daily and peak demands, including fire flow
requirements in a timely and cost efficient manner.
U.1.1.3 Continue to evaluate the adequacy of the water supply and distribution
system.
ATTACHMENT NO. ;2-
5 CIP 2012/13