Loading...
HomeMy WebLinkAboutGeneral Plan Conformance GPC2012003 - Staff Report or Executive SummaryCity of Huntington Beach Planning and Building Department STAFF REPORT HUNTINGTON BEACH TO: FROM: BY: DATE: Planning Commission Scott Hess, AICP, Director of Planning and Building Rosemary Medel, Associate Planner July 24, 2012 SUBJECT: GENERAL PLAN CONFORMANCE NO. 12-003 (CAPITAL IMPROVEMENT PROGRAM FOR FISCAL YEAR 2012/13) APPLICANT: City of Huntington Beach, Public Works Department, 2000 Main Street, Huntington Beach, CA 92648 PROPERTY OWNER: City of Huntington Beach, 2000 Main Street, Huntington Beach, CA 92648 LOCATION: Citywide STATEMENT OF ISSUE: • General Plan Conformance No. 12-003 request: - Evaluate Capital Improvement Program for Fiscal Year 2012/13for compliance with the General Plan. • Staffs Recommendation: Approve General Plan Conformance No. 12-003 based upon the following: - The proposed projects conform to the goals, objectives, and policies of the General Plan. RECOMMENDATION: Motion to: "Adopt Resolution No. 1662, approving General Plan Conformance No. 12-003 with findings (Attachment Nos. 1 and 2)." ALTERNATIVE ACTION: The Planning Commission may take alternative actions such as: A. "Deny General Plan Conformance No. 12-003 with findings for denial." B. "Continue General Plan Conformance No. 12-003 and direct staff accordingly." PROJECT PROPOSAL: General Plan Conformance No.12-003 represents a request, pursuant to Section 65401 of the California Government Code, by the City of Huntington Beach to determine if the 2012/13 Capital Improvement Program (CIP) is in conformance with the goals, objectives, and policies of the General Plan. The 2012/13 CIP is a list of proposed projects recommended for planning, initiation, or construction during the next fiscal year. ISSUES: General Plan Con ormance: The only issue to consider as part of this request is if the proposed CIP for fiscal year 2012/13 is in conformance to the City's General Plan. The CIP conforms to the following goals, objectives, and policies of the General Plan: 1. DRAINAGE IMPROVEMENTS A. Planned Pro'ects: 1. First Street Diversion - SCADA Project Design and install a SCADA system and flow weir for the First Street Urban Runoff Discharge Permit with the Orange County Sanitation District. 2. ,Meredith Pump Station Project will expand the existing pump station building footprint to accommodate higher capacity engines. 3. Northwest Catch Basin Retrofit Project Retrofit 155 existing catch basins with Automatic Retractable Screens. 4. Slater Channel Improvements Project will improve the areas adjacent to the Slater channel to mitigate erosion being caused by runoff. B. General Plan Policies: U. 3 Provide a flood control system which is able to support the permitted land uses which preserving the public safety; upgrade existing deficient systems; and pursue funding sources to reduce the costs of flood control provisions in the City. U.3.1 Ensure that adequate storm drain and flood control facilities are provided and properly maintained in order to protect life and property from flood hazards. U.3.1.1 Maintain existing public storm drains and flood control facilities, upgrade and expand storm drain and flood control facilities. PC Staff Report - 7/24/12 2 (12sr32 GPC 12-003) II. FACILITY IMPROVEMENTS A. Planned Pro*ects: 1. Various Roof Replacements Replace the existing roof of various City buildings, which have reached the end of their useful life. The facilities include: City Pool and Gym, Gothard Fire Station, Joint Powers Training Center, Oak View Community Center, and Newland House. B. General Plan Policies: LU 13.1.1 Allow for the continuation of existing public and private institutional, cultural, educational, and health uses at their present locations and development of new uses in areas designated on the Land Use Plan Map in accordance with Policy 7.1.1. PF 6.1.3 Maintain or improve the governmental facilities and services in order to meet the adopted levels of service and standards established in the Growth Management Element. III. NEIGHBORHOOD IMPROVEMENTS A. Planned Pro'ects 1. Keelson Lane This project will rehabilitate Keelson Lane, including sidewalk, curb & gutter, and pavement. 2. Lakeview Drive This project will install a retaining wall and rebuild the sidewalk adjacent to Huntington Lake. 3. 10th Street Lighting Replacement Replace all elements of a six block street light circuit on 10th Street, from PCH to Palm Avenue. The new circuit will provide a more reliable, standard voltage 4. Sunset Beach Improvements This project will provide improvements to the Sunset Beach Community, including Entry Sign(s) and Landscape Improvements to the Warner Turnaround. B. General Plan Policies: CE 1.2.1 Enhance circulation system standards for roadway and intersection classifications, right -of-way width, pavement width, design speed, capacity and associated features such as medians and bicycle lanes. CE 6.1.6 Maintain existing pedestrian facilities and require new development provide pedestrian walkways and bicycle routes between developments, schools, and public facilities. PC Staff Report - 7/24/12 3 (12sr32 GPC 12-003) CE 7.1.7 Continue to construct landscaped medians in existing major and primary arterial streets and continue to require the construction of landscaped medians in new developments. CE 7.3 Protect scenic corridors and. open space/landscape areas by blending man-made features with the natural environment. CE 7.3.1 Require that new development include landscaping that is compatible with visual character of the designed scenic highways and corridors. IV. PARKS AND BEACHES A. Planned Pro'ects 1. Beach Parking Lot This project will rehabilitate the parking lot between Beach Blvd and Huntington St. 2. Central Park North Parking Lot This project will rehabilitate the parking lot to mitigate flooding. 3. Edison Park Sidewalk This project will replace lifted and broken sections of sidewalk. 4. Murdy Community Center Patio Reconfiguration of patio and addition of shade structure. 5. Shipley Parking Lot This project would install a permanent parking lot. B. General Plan Policies: CE 5 Provide sufficient, well designed and convenient on and off street parking facilities throughout the City. CE 5.1 Balance the supply of parking with the demand for parking. CE 5.1.1 Maintain an adequate supply of parking that supports the present level of demand and allow for the expected increase in private transportation use. RCS 4 Ensure recreation facilities are renovated and upgraded to meet the current recreational interests of adults and youth. RCS 4.1 Improve and modernize existing parks and facilities to overcome existing design deficiencies and deteriorated conditions. PC Staff Report - 7/24/12 4 (12sr32 GPC 12-003) IV. SEWER IMPROVEMENTS A. Planned Pro'ects 1. Sewer Replacement Project Sewer line in Beach Boulevard (Talbert to Warner) will be upsized to meet current and future capacity demands. B. General Plan Policies: U. 2 Provide a wastewater collection and treatment system which is able to support permitted land uses; upgrade existing deficient systems; and pursue funding sources to reduce costs of wastewater service provision in the City. U.2.1 Ensure the City provides and maintains a wastewater collection and treatment facilities system which adequately conveys and treats wastewater generated by existing and planned development at a maximized cost efficiency. U.2.1.5 Maintain, upgrade, and expand existing wastewater collection and treatment facilities. V. STREETS AND TRANSPORTATION IMPROVEMENTS A. Planned Pro*ects 1. Beach at Edinger Restripe to add a fourth northbound through lane on Beach Boulevard from approximately 500 feet south of Edinger Avenue to 460 feet north of Edinger. 2. Edinger Avenue Traffic Signal Synchronization Provide communication and operational upgrades for greater system reliability to improve flows and minimize delays. 3. Gothard/Heil Traffic Signal Modification Modify the traffic signal at the intersection of Gothard and Heil to provide left turn arrows for east-west traffic. 4. Gothard/Talbert Traffic Signal Modification Modify the traffic signal at the intersection of Gothard and Talbert to provide left turn arrows for east-west traffic. 5. Yorktown/Huntington Intersection Improvements Develop alternatives, design and construct improvements to address existing accident patterns. 6. Stacey - Clegg Safe Routes To School Installation of curb ramps and the upgrading of warning signs in the vicinity of Stacey Middle School and Clegg Elementary School. PC Staff Report - 7/24/12 5 (12sr32 GPC 12-003) B. General Plan Policies: CE 1.2.1 Enhance circulation system standards for roadway and intersection classifications, right-of-way width, pavement width, design speed, capacity and associated features such as medians and bicycle lanes. CE 1.2.3 Maintain primary truck routes that sustain an effective transport of commodities while mitigating the negative impacts on local circulation and on noise sensitive land. CE 2.1.1 Maintain a city-wide level of service (LOS) not to exceed LOS "D" for intersections during the peak hours. CE 2.1.2 Maintain a city-wide level of service (LOS) for links not to exceed LOS "C" for daily traffic with the exception of Pacific Coast Highway south of Brookhurst Street. CE 2.1.3 Identify and improve roadways and intersections that are approaching, or have reached, unacceptable levels of service. CE 6.1.10 Implement appropriate traffic devices and operational programs throughout the community to ensure that conflicts between pedestrians, bicycles, and vehicles are minimized and safety enhanced. UD 1.3.2 Provide for the implementation of streetscape and landscape improvements along the major commercial corridors, through public capital improvement programs, business district improvements, or other techniques as funding is available. VI. WATER IMPROVEMENTS A. Planned Pro'ects: 1. Slater Pump Station Modification Design and install new three phase power supply from Graham Street and up to an electric 10, 000 gpm pump system to address increase water flowing into Slater Pump Station due to increase in groundwater injection by Orange County Water District (OCWD) for the purpose of operating the salt water barrier. B. General Plan Policies: U.1 Provide a water supply system which is able to meet the projected water demands; upgraded deficient systems and expand water treatment, supply, and distributed facilities; and pursue funding sources to reduce the costs of water provision in the City and develop fair rate structures to ensure high quality water service. U 1.1 Maintain a system of water supply and distribution facilities capable of meeting existing and future daily and peak demands, including fire flow requirements in a timely and cost efficient manner. PC Staff Report - 7/24/12 6 (12sr32 GPC 12-003) U.1.1.3 Continue to evaluate the adequacy of the water supply and distribution system. The Capital Improvement Program (CIP) ensures that City facilities continue to be adequately accessible and maintained in order to provide services to residents and visitors. CIP projects will provide continued improvements to sidewalks, curbs, gutters and pavement. Landscaping is enhanced to continue to improve the visual character of the city. The CIP ensures that an adequate amount of new circulation and access improvements are developed and maintained to support existing and future development. Capital improvements maintain an integral circulation infrastructure allowing the movement of people and goods throughout the City. The CIP program provides and maintains an adequate citywide water supply system, improved collection and treatment of wastewater and ensures that sufficient parking facilities are provided citywide. Zonin Com liance: Not applicable. Urban Desi n Guidelines Con ormance: Not applicable. Environmental Status: The General Plan conformance review is categorically exempt pursuant to Section 15306, Class 6 of the California Environmental Quality Act, which states that information collection which does not result in major disturbance to an environmental resource is exempt from any environmental review. Coastal Status: Not applicable. Redevelo ment Status: Not applicable. Desi n Review Board: Not applicable. Subdivision Committee: Not applicable. Other De artments Concerns and Re uirements: The Public Works Department, acting as applicant for General Plan Conformance No. 12-003, has reviewed and is processing the Capital Improvement Program request through the City Council. There are no concerns from other departments. Public Noti ication: General Plan Conformances are non-public hearing items and do not require legal public notification. A lication Processin Dates: DATE OF COMPLETE APPLICATION: MANDATORY PROCESSING DATE S : June 20, 2012 August 29, 2011 (within 40 days of submittal) PC Staff Report - 7/24/12 7 (12sr32 GPC 12-003) ANALYSIS: The Government Code of the State of California, Section 65401, requires that a local planning agency review a list of proposed projects recommended for planning, initiation, or construction during the ensuing fiscal year for conformance with the local General Plan. This list of proposed projects is contained in the Capital Improvement Program (CIP). The Public Works Department has submitted a CIP for fiscal year 2012/13. The role of the Planning Commission in reviewing a CIP is to ensure the conformity of each project with the goals, objectives, and policies of the General Plan. The benefits and funding source for individual projects listed in the CIP will then be reviewed and approved by the City Council. Staff has identified goals, objectives, and policies that are applicable to the CIP in the General Plan Conformance section of this staff report. Because the proposed projects further the goals, objectives, and policies of the General Plan, staff recommends the Planning Commission approve General Plan Conformance No. 12-003 finding that the proposed CIP is in conformance with the General Plan. ATTACHMENTS: 1. Suggested Findings of Approval - GPC No. 12-003 2. Draft Planning Commission Resolution No. 1662 SH:MBB:RM:kd PC Staff Report - 7/24/12 8 (12sr32 GPC 12-003) ATTACHMENT NO. 1 FINDINGS FOR APPROVAL GENERAL PLAN CONFORMANCE NO. 12-003 FINDINGS FOR PROJECTS EXEMPT FROM CE A: The Planning Commission finds that the proposed project will not have any significant effect on the environment and is exempt from the provisions of the California Environmental Quality Act (CEQA) pursuant to Section 15306 of the CEQA Guidelines because the project involves information collection which does not result in major disturbance to an environmental resource. FINDINGS FOR APPROVAL - GENERAL PLAN CONFORMANCE NO. 12-003: 1. The 2012/13 Capital Improvement Program conforms to the following goals, objectives, and policies of the General Plan: U. 2 Provide a wastewater collection and treatment system which is able to support permitted land uses; upgrade existing deficient systems; and pursue funding sources to reduce costs of wastewater service provision in the City. U.2.1 Ensure the City provides and maintains a wastewater collection and treatment facilities system which adequately conveys and treats wastewater generated by existing and planned development at a maximized cost efficiency. U.2.1.5 Maintain, upgrade, and expand existing wastewater collection and treatment facilities. U. 3 Provide a flood control system which is able to support the permitted land uses which preserving the public safety; upgrade existing deficient systems; and pursue funding sources to reduce the costs of flood control provisions in the City. U.3.1 Ensure that adequate storm drain and flood control facilities are provided and properly maintained in order to protect life and property from flood hazards. U.3.1.1 Maintain existing public storm drains and flood control facilities, upgrade and expand storm drain and flood control facilities. LU 13.1.1 Allow for the continuation of existing public and private institutional, cultural, educational, and health uses at their present locations and development of new uses in areas designated on the Land Use Plan Map in accordance with Policy 7.1.1. PF 6.1.3 Maintain or improve the governmental facilities and services in order to meet the adopted levels of service and standards established in the Growth Management Element. (12sr32GPC No. 12-003) Attachment No. 1.1 CE 1.2.1 Enhance circulation system standards for roadway and intersection classifications, right- of-way width, pavement width, design speed, capacity and associated features such as medians and bicycle lanes. CE 1.2.3 Maintain primary truck routes that sustain an effective transport of commodities while mitigating the negative impacts on local circulation and on noise sensitive land. CE 2.1.1 Maintain a city-wide level of service (LOS) not to exceed LOS "D" for intersections during the peak hours. CE 2.1.2 Maintain a city-wide level of service (LOS) for links not to exceed LOS "C" for daily traffic with the exception of Pacific Coast Highway south of Brookhurst Street. CE 2.1.3 Identify and improve roadways and intersections that are approaching, or have reached, unacceptable levels of service. CE 5 Provide sufficient, well designed and convenient on and off street parking facilities throughout the City. CE 5.1 Balance the supply of parking with the demand for parking. CE 5.1.1 Maintain an adequate supply of parking that supports the present level of demand and allow for the expected increase in private transportation use. CE 6.1.6 Maintain existing pedestrian facilities and require new development provide pedestrian walkways and bicycle routes between developments, schools, and public facilities. CE 6.1.10 Implement appropriate traffic devices and operational programs throughout the community to ensure that conflicts between pedestrians, bicycles, and vehicles are minimized and safety enhanced. CE 7.1.7 Continue to construct landscaped medians in existing major and primary arterial streets and continue to require the construction of landscaped medians in new developments. CE 7.3 Protect scenic corridors and open space/landscape areas by blending man-made features with the natural environment. CE 7.3.1 Require that new development include landscaping that is compatible with visual character of the designed scenic highways and corridors. RCS 4 Ensure recreation facilities are renovated and upgraded to meet the current recreational interests of adults and youth. RCS 4.1 Improve and modernize existing parks and facilities to overcome existing design deficiencies and deteriorated conditions. (I2sr32GPC No. 12-003) Attachment No. 1.2 UD 1.3.2 Provide for the implementation of streetscape and landscape improvements along the major commercial corridors, through public capital improvement programs, business district improvements, or other techniques as funding is available. U.1 Provide a water supply system which is able to meet the projected water demands; upgraded deficient systems and expand water treatment, supply, and distributed facilities; and pursue funding sources to reduce the costs of water provision in the City and develop fair rate structures to ensure high quality water service. U 1.1 Maintain a system of water supply and distribution facilities capable of meeting existing and future daily and peak demands, including fire flow requirements in a timely and cost efficient manner. U.1.1.3 Continue to evaluate the adequacy of the water supply and distribution system. The Capital Improvement Program (CIP) ensures that City facilities continue to be adequately accessible and maintained in order to provide services to residents and visitors. CIP projects will provide continued improvements to sidewalks, curbs, gutters and pavement. Landscaping is enhanced to continue to improve the visual character of the city. The CIP ensures that an adequate amount of new circulation and access improvements are developed and maintained to support existing and future development. Capital improvements maintain an integral circulation infrastructure allowing the movement of people and goods throughout the City. The CIP program provides and maintains an adequate citywide water supply system, improved collection and treatment of wastewater and ensures that sufficient parking facilities are provided citywide. (12sr32GPC No. 12-003) Attachment No. 1.3 RESOLUTION NO. 1662 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF HUNTINGTON BEACH FINDING THE CAPITAL IMPROVEMENTS PROGRAM FOR FISCAL YEAR 2012/2013 IN CONFORMANCE WITH THE GOALS, OBJECTIVES, AND POLICIES OF THE GENERAL PLAN (GENERAL PLAN CONFORMANCE NO. 2012-03) WHEREAS , the Government Code of the State of California, Section 65401, provides that a local planning agency review a list of the proposed public works projects recommended for planning, initiation, or construction during the ensuing fiscal year as to conformity with the local general plan; and WHEREAS, the Department of Public Works has submitted a coordinated list of all capital projects recommended by City departments for the ensuing fiscal year in the form of a Capital Improvement Projects List for Fiscal Year 2012/2013; and WHEREAS, staff has indicated applicable General Plan goals, objectives, and policies for each project included in the Fiscal Year 2012/2013 Capital Improvements Program to establish conformance with the General Plan (Exhibit A). NOW, THEREFORE, BE IT RESOLVED THAT the Planning Commission of the City of Huntington Beach finds the Capital Improvement Program for Fiscal Year 2012/2013 in conformance with the goals, objectives, and policies of the General Plan. PASSED, APPROVED AND ADOPTED by the Planning Commission of the City of Huntington Beach at a regular meeting held on the 24th day of July 2012, by the following roll call vote: AYES: NOES: ABSENT: ABSTAIN: ATTEST: Scott Hess, Secretary Res 1662 Planning Commission Chairperson ATTACHMENT NO. EXHIBIT A PLANNED PROJECTS AND GENERAL PLAN POLICIES FOR CAPITAL IMPROVEMENTS PROGRAM FY 2012/2013 (GENERAL PLAN CONFORMANCE NO. 12-03) The following is a list of planned projects for Fiscal Year 2012/2013 Capital Improvements Program (CIP) that requires General Plan Conformance. The list is divided into categories by subject. Below each project group is a listing of the relative General Plan policies. 1. DRAINAGE IMPROVEMENTS A. Planned Pro'ects: 1. First Street Diversion - SCADA Project Design and install a SCADA system and flow weir for the First Street Urban Runoff Discharge Permit with the Orange County Sanitation District. 2. Meredith Pump Station Project will expand the existing pump station building footprint to accommodate higher capacity engines. 3. Northwest Catch Basin Retrofit Project Retrofit 155 existing catch basins with Automatic Retractable Screens. 4. Slater Channel Improvements Project will improve the areas adjacent to the Slater channel to mitigate erosion being caused by runoff. B. General Plan Policies: U. 3 Provide a flood control system which is able to support the permitted land uses which preserving the public safety; upgrade existing deficient systems; and pursue funding sources to reduce the costs of flood control provisions in the City. U.3.1 Ensure that adequate storm drain and flood control facilities are provided and properly maintained in order to protect life and property from flood hazards. U.3.1.1 Maintain existing public storm drains and flood control facilities, upgrade and expand storm drain and flood control facilities. II.FACILITY IMPROVEMENTS A. Planned Pro'ects: 1. Various Roof Replacements Replace the existing roof of various City buildings, which have reached the end of their useful life. The facilities include: City Pool and Gym, Gothard Fire Station, Joint Powers Training Center, Oak View Community Center, and Newland House. ATTACHMENT NO.- I CIP 2012/13 B. General Plan Policies: LU 13.1.1 Allow for the continuation of existing public and private institutional, cultural, educational, and health uses at their present locations and development of new uses in areas designated on the Land Use Plan Map in accordance with Policy 7.1.1. PF 6.1.3 Maintain or improve the governmental facilities and services in order to meet the adopted levels of service and standards established in the Growth Management Element. III. NEIGHBORHOOD IMPROVEMENTS A. Planned Pro'ects 1. Keelson Lane This project will rehabilitate Keelson Lane, including sidewalk, curb & gutter, and pavement. 2. Lakeview Drive This project will install a retaining wall and rebuild the sidewalk adjacent to Huntington Lake. 3. 10th Street Lighting Replacement Replace all elements of a six block street light circuit on 10th Street, from PCH to Palm Avenue. The new circuit will provide a more reliable, standard voltage 4. Sunset Beach Improvements This project will provide improvements to the Sunset Beach Community, including Entry Sign(s) and Landscape Improvements to the Warner Turnaround. B. General Plan Policies: CE 1.2.1 Enhance circulation system standards for roadway and intersection classifications, right-of-way width, pavement width, design speed, capacity and associated features such as medians and bicycle lanes. CE 6.1.6 Maintain existing pedestrian facilities and require new development provide pedestrian walkways and bicycle routes between developments, schools, and public facilities. CE 7.1.7 Continue to construct landscaped medians in existing major and primary arterial streets and continue to require the construction of landscaped medians in new developments. CE 7.3 Protect scenic corridors and open space/landscape areas by blending man- made features with the natural environment. ATTACHMENT NO. c2-3 2 CIP 2012/1,3 CE 7.3.1 Require that new development include landscaping that is compatible with visual character of the designed scenic highways and corridors. IV. PARKS AND BEACHES A. Planned Pro'ects 1. Beach Parking Lot This project will rehabilitate the parking lot between Beach Blvd. and Huntington St. 2. Central Park North Parking Lot This project will rehabilitate the parking lot to mitigate flooding. 3. Edison Park Sidewalk This project will replace lifted and broken sections of sidewalk 4. Murdy Community Center Patio Reconfiguration of patio and addition of shade structure. 5. Shipley Parking Lot This project would install a permanent parking lot. B. General Plan Policies: CE 5 Provide sufficient, well designed and convenient on and off street parking facilities throughout the City. CE 5.1 Balance the supply of parking with the demand for parking. CE 5.1.1 Maintain an adequate supply of parking that supports the present level of demand and allow for the expected increase in private transportation use. RCS 4 Ensure recreation facilities are renovated and upgraded to meet the current recreational interests of adults and youth. RCS 4.1 Improve and modernize existing parks and facilities to overcome existing design deficiencies and deteriorated conditions. IV. SEWER IMPROVEMENTS A. Planned Pro'ects 1. Sewer Replacement Project Sewer line in Beach Boulevard (Talbert to Warner) will be upsized to meet current and future capacity demands. ATTACHMENT NO. - 3 CIP 2012/13 B. General Plan Policies: U. 2 Provide a wastewater collection and treatment system which is able to support permitted land uses; upgrade existing deficient systems; and pursue funding sources to reduce costs of wastewater service provision in the City. U.2.1 Ensure the City provides and maintains a wastewater collection and treatment facilities system which adequately conveys and treats wastewater generated by existing and planned development at a maximized cost efficiency. U.2.1.5 Maintain, upgrade, and expand existing wastewater collection and treatment facilities. V. STREETS AND TRANSPORTATION IMPROVEMENTS A. Planned Pro Sects 1. Beach at Edinger Restripe to add a fourth northbound through lane on Beach Boulevard from approximately 500 feet south of Edinger Avenue to 460 feet north of Edinger. 2. Edinger Avenue Traffic Signal Synchronization Provide communication and operational upgrades for greater system reliability to improve flows and minimize delays. 3. Gothard/Heil Traffic Signal Modification Modify the traffic signal at the intersection of Gothard and Heil to provide left turn arrows for east-west traffic. 4. Gothard/Talbert Traffic Signal Modification Modify the traffic signal at the intersection of Gothard and Talbert to provide left turn arrows for east-west traffic. 5. Yorktown/Huntington Intersection Improvements Develop alternatives, design and construct improvements to address existing accident patterns. 6. Stacey - Clegg Safe Routes To School Installation of curb ramps and the upgrading of warning signs in the vicinity of Stacey Middle School and Clegg Elementary School. B. General Plan Policies: CE 1.2.1 Enhance circulation system standards for roadway and intersection classifications, right-of-way width, pavement width, design speed, capacity and associated features such as medians and bicycle lanes. CE 1.2.3 Maintain primary truck routes that sustain an effective transport of commodities while mitigating the negative impacts on local circulation and on noise sensitive land. ATTACHMENT NO. 4 CIP 2012/13 CE 2.1.1 Maintain a city-wide level of service (LOS) not to exceed LOS "D" for intersections during the peak hours. CE 2.1.2 Maintain a city-wide level of service (LOS) for links not to exceed LOS "C" for daily traffic with the exception of Pacific Coast Highway south of Brookhurst Street. CE 2.1.3 Identify and improve roadways and intersections that are approaching, or have reached, unacceptable levels of service. CE 6.1.10 Implement appropriate traffic devices and operational programs throughout the community to ensure that conflicts between pedestrians, bicycles, and vehicles are minimized and safety enhanced. UD 1.3.2 Provide for the implementation of streetscape and landscape improvements along the major commercial corridors, through public capital improvement programs, business district improvements, or other techniques as funding is available. VI. WATER IMPROVEMENTS A. Planned Pro'ects: 1. Slater Pump Station Modification Design and install new three phase power supply from Graham Street and up to an electric 10, 000 gpm pump system to address increase water flowing into Slater Pump Station due to increase in groundwater injection by Orange County Water District (OCWD) for the purpose of operating the salt water barrier. B. General Plan Policies: U.1 Provide a water supply system which is able to meet the projected water demands; upgraded deficient systems and expand water treatment, supply, and distributed facilities; and pursue funding sources to reduce the costs of water provision in the City and develop fair rate structures to ensure high quality water service. U 1.1 Maintain a system of water supply and distribution facilities capable of meeting existing and future daily and peak demands, including fire flow requirements in a timely and cost efficient manner. U.1.1.3 Continue to evaluate the adequacy of the water supply and distribution system. ATTACHMENT NO. ;2- 5 CIP 2012/13