Loading...
HomeMy WebLinkAboutAdministrative Permit APX2016007 - Project Implementation Code Requirements4,61 HUNTINGTONBEACH HUNTINGTONBEACH BUILDINGDIVISION PROJECTIMPLEMENTATIONCODEREQUIREMENTS DATE: PROJECTNAME: PLANNING APPLICATIONNO.: ENTITLEMENTS: DATEOFPLANS: PROJECTLOCATION: PROJECTPLANNER: PLANREVIEWER: TELEPHONE/E-MAIL: PROJECTDESCRIPTION: MARCH11,2016 FOX2ND UNIT PLANNINGAPPLICATIONNO.2016-54 APNO16-007 FEBRUARY26,2016 6832LAFAYETTEDRIVE,HUNTINGTONBEACH JOHNP.RAMIREZ,CONTRACTPLANNER KHOADUONG,P.E (714)872-6123/ KHOA@CSGENGR.COM TOCONSTRUCTA DETACHED325SQ.FT.ACCESSORYUNIT INCONJUNCTIONWITHA 3,060SQ.FT.SINGLEFAMILY RESIDENCE. Thefollowingis a listof coderequirementsdeemedapplicableto the proposedprojectbasedon plans statedabove. The list is intendedto assistthe applicantby identifyingrequirementswhichmustbe satisfiedduringthe variousstagesof projectpermittingand implementation.A list of conditionsof approvaladoptedby the PlanningCommissionin conjunctionwiththe requestedentitlement(s),if any, will also be provided upon final project approval. If you have any questions regardingthese requirements,pleasecontactthePlanReviewer. I. REQUIREMENT: DevelopmentImpactFeeswillberequiredfornewconstruction. Submitseparateplansfor alldisciplines;Building3 sets,MEP2 setseach. Landscapeplanis a separatesubmittalfor irrigationand plantsonly. No accessorystructuresor flat work will be reviewedon the landscapeplans. All siteworkfor accessibilitywill be reviewedand inspected basedontheapprovedarchitecturalplans.Allaccessoryandminoraccessorystructuresincluding siteMEPwillbeonseparatepermits. II. CODEREQUIREMENTSBASEDONPLANS&DRAWINGSSUBMITTED: 1.Projectshallcomplywiththecurrentstatebuildingcodesadoptedbythecityat thetimeof permit applicationsubmittal. Currentlytheyare 2013CaliforniaBuildingCode(CBC),2013California ResidentialCode(CRC),2013CaliforniaMechanicalCode,2013CaliforniaPlumbingCode,2013 CaliforniaElectricalCode,2013CaliforniaEnergyCode,2013CaliforniaGreenBuildingStandards Page2of2 Code,andthe HuntingtonBeachMunicipalCode(HBMC).Complianceto allapplicablestateand localcodesisrequiredpriortoissuanceofbuildingpermit. Newadditionareashallhavefiresprinklersystem. ProvidecompleteRoofplanshowing: Showthesetbackbetweenroofprojectionandpropertyline. Lengthofeaveprojections. EaveprojectionsmustcomplywithTableR302.1. Checktherequiredlight,ventilationandegresswindowfornewaddition. Plansand calculationsmustbe stampedandwet signedby architect/civilengineerlicensedby StateofCalifornia. Energycalculationsandstructuralcalculationsarerequired. Soilreportisrequired. Reviewand providecompliancewith Title 17 of the Cityof HuntingtonBeachMunicipalCode, BuildingandConstruction.Thisdocumentcanbefoundonlineonthecity'swebsite. Forprojectsthatwill includemultiplelicensedprofessionsin multipledisciplines,i.e.Architectand professionalengineersforspecificdisciplines,a DesignProfessionalinResponsibleChargewillbe requestedperthe2013CBC,Section107.3.4. Inadditionto allof thecoderequirementsofthe2013CaliforniaGreenBuildingStandardsCode, specificallyaddressConstructionWaste Managementper Sections4.408.2,4.408.3,4.408.4, 5.408.1.1,5.408.1.2,and5.408.1.3andBuildingMaintenanceandOperation,Section5.410. Prior to the issuanceof a buildingpermitthepermiteewill berequiredto describehowtheywillcomply withthe sectionsdescribedabove. Priorto BuildingFinalApproval,the citywill requirea Waste DiversionReportperSections4.408.5and5.408.1.4. III. COMMENTS: Planningand Building Departmentencouragethe use of pre-submittalbuilding plan check meetings. SeparateBuilding,Mechanical,Electricaland PlumbingPermitswill be requiredfor all exterior accessoryelementsof the project,includingbut not limitedto: fireplaces,fountains,sculptures, light poles,wallsand fencesover42" high,retainingwallsover2' high,detachedtrellises/patio covers, gas piping, water service,backflowanti-siphon,electrical,meter pedestals/electrical panels,swimmingpools,storageracksfor industrial/commercialprojects. It will be the design professionalin charge, responsibilityto coordinateand submit the documentsfor the work describedabove. Provideon all plan submittalsfor building,mechanical,electricaland plumbingpermits,the Conditionsof ApprovalandCodeRequirementsthatareassociatedwiththe projectthroughthe entitlementprocess. If thereis a WQMP,it is requiredto beattachedto the plumbingplansfor plancheck. CITYOFHUNTINGTONBEACH PROJECTIMPLEMENTATIONCODEREQUIREMENTS HUNTINGTONBEACH DATE:MARCH7,2016 PROJECTNAME:FOX2N0UNIT PLANNING APPLICATIONNO.:PLANNINGAPPLICATIONNO.2016-54 ENTITLEMENTS:APNO16-007 DATEOFPLANS:FEBRUARY26,2016 PROJECTLOCATION:6832LAFAYETTEDRIVE,HUNTINGTONBEACH PROJECTPLANNER:JOHNP.RAMIREZ,CONTRACTPLANNER PLANREVIEWER: TELEPHONE/E-MAIL:(714)536-XXXIXXXXX surfcit-hb.or PROJECTDESCRIPTION:TO CONSTRUCTA DETACHED325 SQ. FT.ACCESSORY UNIT IN CONJUNCTIONWITH A 3,060 SQ. FT.SINGLE FAMILY RESIDENCE. Thefollowingis a listof coderequirementsdeemedapplicableto the proposedprojectbasedon plans statedabove. The list is intendedto assistthe applicantby identifyingrequirementswhich mustbe satisfiedduringthe variousstagesof projectpermittingand implementation.A list of conditionsof approvaladoptedby the PlanningCommissionin conjunctionwiththe requestedentitlement(s),if any, will also be provided upon final project approval. If you have any questions regardingthese requirements,pleasecontactthePlanReviewer. PLEASEPROVIDECOMMENTSBYMARCH18,2016 CITYOFHUNTINGTONBEACH PROJECTIMPLEMENTATIONCODEREQUIREMENTS HUNTINGTONBEACH DATE:MARCH7,2016 PROJECTNAME:FOX2NDUNIT PLANNING APPLICATIONNO.:PLANNINGAPPLICATIONNO.2016-54 ENTITLEMENTS:APNO16-007 DATEOFPLANS:FEBRUARY26,2016 PROJECTLOCATION:6832LAFAYETTEDRIVE,HUNTINGTONBEACH PROJECTPLANNER:JOHNP.RAMIREZ,CONTRACTPLANNER PLANREVIEWER: TELEPHONE/E-MAIL:(714)536-XXXIXXXXX surfcit-hb.or PROJECTDESCRIPTION:TOCONSTRUCTA DETACHED325SQ.FT.ACCESSORYUNIT INCONJUNCTIONWITHA 3,060SQ.FT.SINGLEFAMILY RESIDENCE. Thefollowingis a listof coderequirementsdeemedapplicableto the proposedprojectbasedon plans statedabove. The list is intendedto assistthe applicantby identifyingrequirementswhich mustbe satisfiedduringthe variousstagesof projectpermittingand implementation.A list of conditionsof approvaladoptedby the PlanningCommissionin conjunctionwiththe requestedentitlement(s),if any, will also be provided upon final project approval. If you have any questions regardingthese requirements,pleasecontactthePlanReviewer. PLEASEPROVIDECOMMENTSBYMARCH18,2016