HomeMy WebLinkAboutInitial Plan; Zoning Review IPZR2017011 - Plans11
•
••
•
•
• ••
•
•
•
•
SITE
•• • •• •
• •'••
••
•• ••
••
•• ••
••
••• • ••
•
•
••••• • ••
•••
• '6•
•
•
• •
•••
••••VIGNITY MAR
NOT TO SCALE
NOTES:
LI VERTICAL DATUM: NAVD88 (ORANGE COUNTY)
BENCHMARK: ORANGE COUNTY SURVEYOR'S 3-3/0 ALUMINUM DISK
DESIGNATION HB-202.71 EIEVATION • 46.366'
PARONG SPACES: 239 STANDARD 12ADA 251 TOTAL
TOPOGRAPHICSURVEY
18081 BEACH BOULEVARD
CITY OF HUNTINGTON BEACH, ORANGE COUNTY, CAUFORNIA
FIELD SURVEYED: (16-16-2017
LEGEND:
BURDING OUTUNE WITH DOOR
CONCRETE SURFAa
ASPHALT SURFACE
WALL
BUILDWG OVERHANG
CURB USE
EDGE OF ASPHALT
LOT UNE
PROPERTY UNE
ELECTRICAL UNE
•
TELECOMMUNICATIONS UNE
so STORM UNE
SD SANITARY SEWER UNE
•
WATER UNE
O GAS UNE
—0—SIGN
DOUBLE POST SIGN
0 B BOLLARD
ONJ DRIVEWAY ENTRY
HOT HANDICAP RAMP
(11)MASH ENCLOSURE
OD BIKE RACK
0 RD ROOF DRA/N
GO UNKNOWN MANHOLE
LB ELECTRICAL JUNCTION BOO
0 E ELECTRICAL METER
0 ER ELECTRICAL RISER
O EC EIECTRICAL CABINET
EVLT EIECTRICAL VAULT
TRAN TRANSFORMER
GROUND ROOD UGHT
POWER POLE
OVERHEAD LIGHT
O G GPS METER
0 GV GASVALVE
SANITARY MANHOLE WITH STRUCTURE
STORM MANHOLE WON STRUCTURE
1PSS
2.) BASIS OF BEARINGS FORTED SURVEY IS THE CENTER UNE OF BEACH BOUIEVARD SHOWN AS
190,14'45`W ON IHAT MAP RECORDED IN BOOK 69, OF PARCEL MAPS, PAGE 11, OFIANGE
COUNTY RECORDS, ESTABLISHED FROM FOUND MONUMENTS.
34 UTILITY LOCATIONS SHOWN ARE PER OBSERVED REM EVIDENCE. UNLSS INDKATED,
DEPTHS OF UTIUTY UNES ARE NOT AVAILABLE. ALL UTILITY LOCATIONS SHOUID BE REW
VERIFIED (POTHOLED) PRIORI° CONSTRUCTION
18001 BEACH BOULEVARD
1 STORY TWILL/RIG
o CO cce B RUCO
OT°
^ •4'I
16.
2 -
••UTIUTY ENCLOSURE
7.--GO
DOUBLE DETECTOR
CHECK VALVE
12.
ABLE O'
W/ BEPICHES
020
TO
'CV
CV
FF 56.01.16081 BEACH BOULEVARD
2 STORY BUILDING
LAS
CATOI BASIN/AREA DRAIN
QM CURB INLET
0 CD OJRB DRAIN
0 CO SANCTARY/STORM aEAN OUT
0 ®SANITARY/STORM STRUCIVRE
TROT MECOMMUNICATIONS VAULT
DO WATER VALVE
FIRE HYDRANT
0 W WATER MEIER
WATER SHUTOFF VALVE
a BAOGLOW PREVENTER
4 FIRE DEPARTMENT CONNECT
VNLT WATER VAULT
0 KB HOSE BIB
0 KV IRRIGATION CONTROL VALVE
0DEOTWOUS TREE W/ TRUNK DIAMETER-PERIMETER REPRESENTS DRIPUNE
PALM TREE W/ TRUNK DIAMETER
-PERIMETER REPRESENTS DRIPUNE
41 PROTECT CONTROL POINT6.ADA PARKING
\
"01161PVERN
,
E Mt/MINER
010 10/
oce PROJECTCONTROL:
STATION DESCRIPTION NORTHING FASTING ELEVATION
l MAG NAIL W/ SHINER
2,202425.67 6,031.5SS.12 54.22'i
MAG NAIL W/ SHINER 2,20242L6U 6,032,395.15 SS.60'
3 MAR NAIL W/ SHINER 2,202,482.63 653740167 57.03.
4 SCRIBED le IN CONCRETE 2.202,504.94 6,032.570.67 59.33'
STORM TABLE:SANITARY TABLE:
< > u,—I
M
003
0 BATCH BASIN
RIM • 5423.
IE G. PVC OUT (NEI • 52.611'
CATCH BASIN
RIM • 54.46
IE 6. PVC IN (SW). 5231'
IE 6. PVC OUT 010 • 52.46.
0 CATCH BASIN
RIM • 53.68.
IE CER IN (NE) • 5173'
IE ait OUT INE)mar
0 CATOI BASIN
RIM =
IE 6* OUT (NW) • 5138.
C) CATCH BASIN
RIM S3.32'
IF 12. PVC OUT (5) -51.62'
0 CURB INLET
FLOW UNE • 56.13.
IEIT OUT (N) • 55.20.
0 WALL INLET
FLOW UNE • 55.57
SIZE 3' WHOM /C9^ HEIGHT
0 CATCH BASIN
RIM *5533'
0 SANITARY MANHOLE
RIM • 56.73'
tE K IN (S) • 43.40'
11. OUT (N) 43.20'
0 SANITARY MANHOLE
RIM • 5139'
!ER IN (5).4249'
E (VA. 42.51'UB OUTINI
SCALE
20 0 10 20 40
1 INCH = 20 FEET
44.
424-1q3ff2250 D000In BRA,6W. ROO
850ev10, CA 95661
0: 9152322686
F. 916.7723699
REV. DATE BY DESCRIPTION
kpff 7.730 troughs BIM. SuIte ROO
Ba,It .CA 9S6610: 916372.7686
Fr 916.772.7699
SURVEYED BY: TcT,SH
DRAWN BY:KRC
CHECKED BY:DMG
PROJECTNO.: 1700-037
FILE:1700-037.5B
TOPOGRAPHIC SURVEY
18081 BEACHBOULEVARD
KAISER PERMANENTE
CITY OFHUNTINGTON BEACH / ORANGE coml.( / CAUFORNIA
DATE,06/23/201.7
CONTOUR INTERVAL 1 FOOT
SHEET NO.
1 OF2
LEGEND:
r////////X7////////i BUILDINGOUTLINEWM/ DOOR
• TI CONCRETESURFACE
.1 ASPHALTSURFACE
InG/1=•1 WAIL
BUILDINGOVERHANG
CURB UNE
EDGEOFASPHALT
LOTLINE
PROPERTYUNE
ELECTRICALUNE
TELECOMMUNICATIONSUNE
SO STORMUNE
55 SANITARYSEWERUNE
•
WATERUNE
O GASUNE
SIGN
DOUBLEPOSTSIGN
O B BOUARD
D/W DRIVEWAYENTRY
OUR HANDICAPRAMP
CTE)TRASHENO.OSURE
BIKEFLACK
O RD ROOFDRAIN
UNKNOWNMANHOLE
0
HI ELECTRICAL/UNCTIONBOX
0 E ELECTRICALMETER
ER ELECTRICALRISER
0 EC ELECTRICALCABINET
EVLT ELECTRICALVAULT
TRAN TRANSFORMER
GROUNDROOD UGHT
POWERPOLE
OVERHEADUGHT
0 G GASMETER
0 GV GASVALVE
SANITARYMANHOLEWITHSTRUCTURE
STORMMANHOLEWITTISTRUCTURE
CATCHBASIN/AREADR.AIN
CURBINLET
0 CD CURBDRAIN
c).0 CO SANITARY/STORMCLEANOUT
SANITARY/STORMSTRUCTURE*
TELVLT TELECOMMUNICATIONSVAULT
DO WATERVALVE
"Cf FIREHYDRANT
W WATERMETER
WATERSHUTOFFVALVEaBACKFLOWPREVENTER
4 RREDEPARTMENTCONNECT
WV1.7 WATERVAULT
0 NB HOSEBIB
0 IN IRRIGATIONCONTROLVALVE
0
DECIDUOUSTREEW/ TRUNKDIAMETER
-PERIMETERREPRESENTSDRIPLINE
TOPOGRAPHICSURVEY
18081 BEACH BOULEVARD
CITY OF HUNTINGTON BEACH, ORANGE COUNTY,CAUFORMA
FIELDSURVEYED:06-16-2017
•••••
•
• •
•••
•••••
•••••
•
• •••
•••
••
•
•••••••
0,•O._•
••N
•
—41
•fr •••1
•••
/
.
•••••
•••
•
••
••
•••
•
••
•••
••
••
•
SEESHEET1
FE 56.01.IBM BEACHBOULEVARD
2 STORYBUILDING
CD "DUMPSIER,
FF S6.0
RI
GAITEIT
RAGECONTAINER
RH
g „.6
or
IN0
/
EMTci
156'.
ART PROJECTCONTROLPOINT
ADAPARKING IC:
WALLOPENINGABOVEINLET
10/.B --
'
I
m
p
CV =T
.1
oco
BEACH
BOU
LEV
;SB
(Fa:,
/ DEC
158',
WVLTCI 0. 0.
18141 BEACHBOULEVARD
MULTISTORYBUILDING
SCALE
o 10 20
40
ANT
15z.;
/./
STEPSUP
1
I
N
C
H
=
2
0
F
E
E
T
106 90.1700.1117
krif 2250
0
0
9
9
1
1
.
9 MAL
M
s
2
0
0
Roseolt
C
A
9
5
6
6
1
0:
9
1
6
,
2
7
6
6
8
F:9163723699
REV. DATE BY DESCRIPTION
2250 DougRs BYO., Sone 200
*moi•, CA95661
0:916772.7686
F: 916.772.7699
wow.bottom,
SURVEYED BY: TCT, SH
DRAWN BY:KRC
CHECKED BY:DMG
PROJECT NO.: 1700-037
FILE:1700-037.SB
TOPOGRAPHICSURVEY
18081
B
E
A
C
H
B
O
U
L
E
V
A
R
D
KAISERPERMANENTE
CITY OF HUNTINGTON BEACH / ORANGE COUNTY / CAUFORNIA
DATE:06/23/2017
CONTOUR
I
N
T
E
R
V
A
L
:
1
F
O
O
T
SHEET NO.
PALMTREEW/ TRUNKDIAMETER
-PERIMETERREPRESENTSDRIPUNE
2OF2
44.
EXISTING%ITE
18081 B
E
A
C
H
B
L
V
D
.
EXISTING
M
E
D
I
C
A
L
O
F
F
I
C
E
BUILDING (MOB)
BUSINESS OCCUPA
N
C
Y
FULLY
S
P
R
I
N
K
L
E
R
E
D
TYPE
5
C
O
N
S
T
R
U
C
T
I
O
N
18121 B
E
A
C
H
B
L
V
D
.
SURFACE
P
A
R
K
I
N
G
1.1.1•11
EXISTING PARKING: 251
REQUIRED PARKING
(33x4.5 SPACES PER 1,000 SF): 149
EXTRA PARKING: 102
BEACH
BLVD
56'-6"1 146-9"0
ADJACENT
RESIDENTIAt
2
STORY
•
O •
O
„....1.111MME1111111•11116111111111111‘11111.1114MINSMININEMIALINSHILISINSIIIMININIIIIINSINIIMMINIMMINImusf •
ii
ADJACENT
O
F
F
I
C
E
3
STORY
B
U
I
L
D
I
N
G
EXISTING
2
S
T
O
R
Y
MOB
33,000
S
F
O
••
• •
••
•••
•
•••••
••
•
•••
•
•
•••
•
•
•••
••
••
••
••
••••••••
••
••
•••••
••
••••
•••
•••
•55.5
••
••••
ADJACENT
STRIP
M
A
L
L
1
S
T
O
R
Y
NOTTOSCALE•
•vprMISER TAY
L
O
RPERMANENTE 07/18/2017 1
o
f
2
9
ALTERNATIVE1
PHASE
1
:
C
O
N
S
T
R
U
C
T
I
O
N
O
F
N
E
W
M
O
B
CONSTRUCTION DURATION
(MONTHS)
•••
•••
•
••••
••
••
••
••
••
••
ISIS
••
•
••
•
••
•
•
••••
•
•••••
•
••
••
•••
••
••
••
•
III •
••
••••
•
•••
•
••
••
••
•
•
BEACH
BLVD
258'-2"109'-3"30'-0"
EXISTING
2
S
T
O
R
Y
MOB
33,000
S
F
S.
CONSTRUC
I
O
N
ENTRANCE
HAL
MAKE-READY SITE WORK 2
FOR NEW CONSTRUCTION
CONSTRUCTION OF NEW 14
BUILDING
DEMOLISH EXISTING 4
BUILDING
REMOVE CONSTRUCT
I
O
N
4
BARRIER
/
P
E
R
F
O
R
M
S
I
T
E
IMPROVEMENTS
CODE PARKING DEFICIT 24
J
L
1 r „
1..........................,_
.
_
_
„
.
.
_
.
...
E
EXISTING PARKING: 251
PARKING REQ'D DURING
CONSTRUCTION:
1
4
9
(@ 4.5/1000 SF)
ON-SITE PARKING: 112
CODE PARKING DEFICIT: 37
O
•mipf KAISER TAYLORPERMANENTE 07/18/2017 2
o
f
2
9
NOT
T
O
S
C
A
L
E
ALTERNAVE
1
PHASE
1
:
C
O
N
S
T
R
U
C
T
I
O
N
OF N
E
W
M
O
B
CONSTRUCTION STAGING
(ENLARGED PLAN)
MAKE-READY SITE WORK
FOR NEW CONSTRUCTION
CONSTRUCTION
O
F
N
E
W
BUILDING
DEMOLISH EXISTING
BUILDING
JOB SITE TRAILERS /
STAGING
SET BACK R
E
Q
U
I
R
E
M
E
N
T
°
N
•
•
•
•••
•
A
l
•
•
•
0
.
•
,
•
•
•
I
•
;1.37"6 •
••
r
z
t
:r
15'-9"
EXISTING
2
S
T
O
R
Y
MOB
33,000
S
F
258'-1"
180'-11"
111111111111M1111111111111111111111111111111111111111111111111111111111141111111
:".
CONSTRUCTION
ENTRANCE
..
.
.
.
m
a
. .... eire's !t;
f:11-
.....................
-
53.
01
I -
N(.3
=
\\
•vfrKAISER TAY
L
O
RPERMANENTE
Iit
V
i
r
,
t
t
t
n
i
t
i
.
I
IjIttlity-11”)OW
I
P
W
W
I
1
1
P
1
1
,
U
r
i
t
t
/
1
1
1
1
,
1
S
W
I
M
i
t
t
f
4Itt#111-11111
NOT
T
O
S
C
A
L
E
07/18/2017 3
o
f
2
9
ALTERNAVE 1
PHASE 1:COMPLETION OF NEW MOB WITH SHELLED4TH STORY
NEW BUILDING IS COMPLETE
PREVIOUS BUILDING IS DEMOLISHED
SURFACE PARKING AND SITE
IMPROVEMENTS COMPLETE
J L
ir
•••• •
•••••
•• ••••
•
••
••
••
••
•••
••
••
•••
••
••
•••
•••
•
•
•
•••••••••
•••
•
•••
•
•••
••
•••
••
••
••••••
•
BEACH
BLVD
STAFF SERVICE ENTRAI 4:E
-1
ENTRANCE I>
1PEDESTRIANENTRANCE
4
PARKING REQ'D FOR PHASE 1 (3 STORY
PORTION: 48,517 SF/1,000 SF =48.52.
48.52x4.5) = 219
(@ 4.5/1000 SF)
ADA PARKING: 21
STANDARD PARKING: 199
OD•Vpi KAISER TAYLORPERMANENTE 07/18/2017 4 of 29
NOT TO SCALE
BEACH
BLVD
•••• ••
••••••
•••
••••••
•
•••••
•••• ••
•
•
•
•
•••
•• •
•
••••••
••
••
•
•
•
•
•
• ••
•
•
S•
0
S •
S •
S •S.
•
•
J'•v
ALTERNOIVE 1
PHASE2: CONSTRUCTION OF NEW PARKINGSTRUCTURE
CONSTRUCTION DURATION
(MONTHS)
SITE DEMOLITION 1
MAKE-READY SITE WORK
FOR NEW CONSTRUCTION
CONSTRUCTION OF NEW 6
PARKING GARAGE
SITE IMPROVEMENTS:2
LANDSCAPING
HARDSCAPE
-CIRCULATION
UTILITIES
CODE PARKING DEFICIT 9
4.•
-.PglEF;A ICE1
J L
r (tflLHTIflr4' ":7CC(1:1`-'
STAFF SERVICE ENTRANE,,
•
•
,
f-
-
:1 • •
ENTRANCEI>
,
PARKING REQD DURING
CONSTRUCTION: 219
(@ 4.5/1000 SF)
ON-SITE PARKING: 66
CODE PARKING DEFICIT: 153 O
OD•\fffr KAISER TAY LO RPERMANENTE
NOT TO SCALE
07/18/2017 5 of 29
ALTERNAVE 1
PHASE2: COMPLETION OF NEW PARKINGSTRUCTURE
•••
••
•••
•••
••••
•
•
••••
••
••
•
••
•
•
•••
••••
0.:
••
•••
555 •
•
••
•
••••••
•
•
•
•••
•
•
•
••
•
•
••
••
•••
•
•
GARAGE CONSTRUCTION COMPLETE
SITE LANDSCAPE COMPLETE
SITE PAVING COMPLETE
UTILITIES COMPLETE
SITE HARDSCAPE COMPLETE
PARKING REQ'D FOR PHASE 1 (3 STORY
PORTION: 48,517 SF/1,000 SF = 48.52.
48.52x4.5) = 219
(@ 4.5/1000 SF)
ON-SITE PARKING: 330
ADA PARKING: 32
STANDARD PARKING: 298
J L
ENTRANCE
STAFF SERVICE ENTRANO\
ADJACENT
RESIDENTIAL2
STORY STAFF PATIO
-
BEACH
BLVD
-9
:1 •
ENTRANCEI>
-
PEDESTRIAN
ENTRANCE
\
kt,' M"!
NV 1...11:te.1.. ..• •• S o.. • ...a wo.in4'...e.+INCNO 0
"\\\
;
O
:MTh., KAISER TAYLORPERMANENTE 07/18/2017 6 of29
NOT TO SCALE
ALTERNAVE
1
PHASE3:
B
U
I
L
D
-
O
U
T
O
F
4
T
H
S
T
O
R
Y
r
THE INTERIO
R
C
O
N
S
T
R
U
C
T
I
O
N
O
F
THE EX
I
S
T
I
N
G
S
H
E
L
L
E
D
4
T
H
STORY OF THE NEW BUILDING
WILL BE COMPLETED AFTER THE
COMPLETION OF THE PARKING
GARAGE STRUCTURE.
38'-0"130'-2"65'-6"
"”,"1"'r •
•
,
•
•
7
7
.
•
-
!
'
7
‘
.
17
'
4
.ENTRANCEo
••••
•
•SO*••
•
••
00 •
•••
•
•••••
••
••••
••
••••
•••
•••
OS
••
•
5415 •••0
•
••
••
041
S •
•
•
•••
•
••000
•
0
30'-0"
109%1"
STAFF
S
E
R
V
I
C
E
E
N
T
R
A
N
in
STAFF
P
•-•
u,
,z
z.w
ENTRANCEI>•
II•
PEDISTRIAN
ENTRANCE
\SA
I BEACH
BLVD
CNI
ADJACENT
RESIDENTIAL (2
STORY
-9
•
.000000D • 600.1 10000 0•06 •
m
e
•
•
•
0
4
•
s
r
•11,
n\l
;
LILW
•
til sidiummum0100.0me....0.11.00mma0m..00m00.0.011mvimi.00.0amla0m00 8.00,01101sm0.00 001.0m0.001010meftem0Mem
14--
PARKING REQ'D (48,517+13,341=61,858:
61.858/1000 = 61.86: 61.86x4.5) = 279
(@ 4.5/1000 SF)
ON-SITE PARKING: 330
•
•\IN KAISER TAY
L
O
RPERMANENTE
O
NOT
T
O
S
C
A
L
E
07/18/2017 7
o
f
2
9
ALTERNAVE
1
PHASE3:
L
A
N
D
S
C
A
P
E
P
L
A
N
LEGEND:
•••
•
•
••••
•••••
••••
0•••••
••
•
•••
••
•
•
••
•••
•••
00
••
•••
•
•
•••••
••••
•••
••
••
••
•••••
••
••5555
•
••
go.-a
s
a
•
•••••• •••• ••••••••••maas•••-...• •••• • maaN.••••••
•
a
•
••••••••
•
a
m
•
•
•
•
••••••••
i
4
4 4,,,-
4
4
4
4
3
4
4
4
'
EN ,NCE
•
.
.
.
.
_I
i p STAFF,
S
E
R
V
I
C
E
E
N
T
R
A
N
C
E
.4
'
2
,
I
1
4 A
40
4116
i
I,
•q8-.4.,•1-• I ..ii.
1 II4.:1
t
w
Ri
-:--..iill'.14wl,
-
ENTRANCEt>
:
1
•
•
•
BEACH
BLVD
PEDESTRIAN
ENTRANCE
h
40
4
0
4
0
.40
EVENT LAWN
STAFF PATIO
COFFEE KIOSK
DATE
P
A
L
M
C
O
U
R
T
DROP OFF
THRIVE
W
A
L
K
QUEEN
P
A
L
M
S
SOUND WALL
HEALING
G
A
R
D
E
N
BIOFILTRATION
P
L
A
N
T
E
R
LANDSCAPE AREA:
REQUIREMENT
O
F
1
0
0
S
F
O
P
E
N
S
P
A
C
E
PER 1,000 SF BUILDING
BUILDING SF
REQ'D
O
P
E
N
S
P
A
C
E
••••••••• •••aaam.mamorm•am• ••••••• 11
)44
48 517 (PH. 1)
28,365 (PH. 2)
13,341
P
H
.
3
88,223
4,852
2,836
1,334
I
•1•0.•••••••••••••••••••••• ••••• • • • •
9,022
PROVIDED AREA: 45,196 SF
ii]
;4----- • •••• •••.•••••• •••••••-••• • • ••-••• •- • • • • • • ••••• • •••••••• •• •
O
NOT
T
O
S
C
A
L
E
•
•Mtpf KAISER TAY
L
O
RPERMANENTE 07/18/2017 8
o
f
2
9
OD
•MTh
K
A
I
S
E
R
PERMANENTETAYLOR 07/18/2017 9
o
f
2
9
•••
•
•
•••
•••
•••
••
•••••
•••
•
••
•••
••
••
•••
••
••
•••
••
ALTERNAVE
1
VIEW
F
R
O
M
S
O
U
T
H
1
___••il.4.•
•
••••
•
•
•
•
•
.r..
•
,
,
,
•
••
.
.
.:
•
•
•
•
•
'
•
•
•
•
/
•
•
•
PHASE
1
3
S
T
O
R
Y
48,517
S
F
4TH
S
T
O
R
Y
SHELLED
13,341
S
F
PHASE
2
4
S
T
O
R
Y
G
A
R
A
G
E
280
S
P
A
C
E
S
ALTERNAVE
1
VIEW
F
R
O
M
S
O
U
T
H
W
E
S
T •••
•
•
•••
•••
•••
•
•••••••
•••
••
•••
•a
••
•••
••
••
•••
••
•
•111,KAISER PERMANENTETAYLOR 07/18/2017 10
o
f
2
9
•
I
I
••••
•
••••
5••04-
0
--
•
•
•
0
.-
••••••
•
•• 6*
)0,0
•
.
6
•••
•••
* •I
••
••
•
..
t
••••••
•
• •
8
` 0 .
I
A6
•
•
•
••
•••
ALTERNAVE
1
VIEW
F
R
O
M
S
O
U
T
H
E
A
S
T
Plok
•••vt,KAISER TAYLORL.-PERMANENTE 07/18/2017 11
o
f
2
9
ALTERNAVE 1
VIEW FROMNORTHEAST
•••
•
•
••••••
••IP
•
••••••
•••
•••
•••
••
••
•••
••
••
•••
••
par
- 4;1,:1'.
,
=t.
• •
misER PERMANENTETAYLOR
07/18/2017 12
o
f
2
9
ALTERNAVE 1
VIEW FROM SOUTH EAST •••••••••
••0 •••••••
•••
••
•••
••
••
•••
••
••
•••
••
-
„.,
•••
MP, KAISER PERMANENTETAYLOR
07/18/2017 13 of 29
••
ALTERNATIVE2
PHASE 1:CONSTRUCTION OF NEW MOB
CONSTRUCTION DURATION
(MONTHS)
MAKE-READY SITE WORK 2
FOR NEW CONSTRUCTION
CONSTRUCTION OF NEW 14
BUILDING
DEMOLISH EXISTING 4
BUILDING
REMOVE CONSTRUCTION 4
BARRIER / PERFORM SITE
IMPROVEMENTS
CODE PARKING DEFICIT 24
EXISTING PARKING: 251
PARKING REQ'D DURING
CONSTRUCTION: 149
(@ 4.5/1000 SF)
ON-SITE PARKING: 112
CODE PARKING DEFICIT: 37
• •\iffr KAISER TAY LORPERMANENTE
(Di
NOT TO SCALE
07/18/2017 14 of 29
•••• • •• • •• *• •••
•• ••••
• ••••• •• • ••••• • •• ••• ••.•• •555. •• •
E
EXISTING
2 STORY
MOB
33,000 SF
BEACH
BLVD
CONSTRUCTION
ENTRANCE
1 IE
A V
• •••• • .•
F
-
••:. 4•
•••goo
•••
•.
••••••••S ••CONSTRUCTION STAGING
(ENLARGED PLAN)
30'
•4:77
41.
•••
Pr-EXISTING
2 STORY
MOB
33,000 SF
MAKE-READY SITE WORK
FOR NEW CONSTRUCTION
CONSTRUCTION OF NEW
BUILDING
•‘(...1.•
NOT TO SCALE
07/18/2017 15 of 29
••vpr KAISER PERMANENTETAY LOR
ALTERNAVE 2
PHASE 1:CONSTRUCTION
.OF NEW MOB
••
nunxtulittnOuttnrotiktItitWityiip Itttnt911tUntttattAlttintUtitifillIUM4M41-WII,MIWittUtOtittAtiiUlltWittlitiftti
341'-9",4--
•••••••••DEMOLISH EXISTING
BUILDING
JOB SITE TRAILERS /
STAGING
\\ \ \ Nrtniie.rs)r..N 1 41.11 .1111 M." 011
SET BACK REQUIREMENT
258'-1"
180'-11"
111111111111111111111111111111111111111111111141111111111111111114111111111111111t
CONSTRUCTION
ENTRANCE
--'"'71 • • •
.14.4•11.1•••••[••••111. W{i &••••••Iti••r-er,
• • • • • • •.‘LII• •• •N,10. • • •
17 • •
ni-1-14-11-11111111414:1-141-111111Watt447411iDTr :o i5•-9"
ALTERNAVE 2
PHASE 1:COMPLETION OF NEW MOB •••••.
•
•• ••
••••••
••
• •
••
••
•
••••II
.
•
SS
•
.••••
•• ••
•
• •
••
••
••
•
• • •
S•
•••••
,
NEW BUILDING IS COMPLETE
PREVIOUS BUILDING IS DEMOLISHED
SURFACE PARKING AND SITE
IMPROVEMENTS COMPLETE
STAFFSERVICEENTRA4"Er
,
ENTRANCE
I>1PEDESTRIANENTRANCE
BEACH
BLVD
S.E
-*
PARKING REQ'D FOR PHASE 1 (3 STORY
PORTION: 48.517 SF/1,000 SF = 48.52.
48.52x4.5) = 219
(@ 4.5/1000 SF)
ADA PARKING: 21
STANDARD PARKING: 199
O
•MP( KAISER TAY LOR
b PERMANENTE 07/18/2017 16 of 29
NOT TO SCALE
ALTERNAVE 2
PHASE2: CONSTRUCTION OF NEW PARKINGSTRUCTURE
CONSTRUCTION DURATION
(MONTHS)
SITE DEMOLITION 1
MAKE-READY SITE WORK
FOR NEW CONSTRUCTION
CONSTRUCTION OF NEW 6
PARKING GARAGE
SITE IMPROVEMENTS:2
LANDSCAPING
HARDSCAPE
CIRCULATION
-UTILITIES
CODE PARKING DEFICIT 9
1 ••
-
:1 •
STAFF SERVICE ENTRANM
—
-
.••s••••••••••••••• •••:•;;•;00;•••• ••••••••••• ••••• ••001;
ENTRANCE
_
k
J L
r
BEACH
BLVD
Pg1 AICEN
•••0• ••
• • •••
•
••••••
•••0••
•
••
••
••
• ••••••
•
••
•••••••
••
•
••
••
•
••••
•••••••
••
H-HP )
PARKING REQ'D DURING
CONSTRUCTION: 219
(@ 4.5/1000 SF)
ON-SITE PARKING: 66
CODE PARKING DEFICIT: 153 O
YPP,KAISER TAYLORPERMANENTE 07/18/2017 17 of 29
NOT TO SCALE
ALTERNAVE 2
PHASE2: COMPLETION OF NEW PARKINGSTRUCTURE a• •• •• • •• •• ••
GARAGE CONSTRUCTION COMPLETE
SITE LANDSCAPE COMPLETE
SITE PAVING COMPLETE
UTILITIES COMPLETE
SITE HARDSCAPE COMPLETE
a ••••
•
••
••
•
• ••••
••
••
••
49••0
C •
••••••••
•
••
0 •
•
••
•
00 0 0 •
0 0.
0
STAFF SERVICE ENTRAN
:-2 111 Lir
111+ •
1D
J L
r
ADJACENT
RESIDENTIALT
STORY
-9
STAFF PATIO
--
BEACH
BLVD
ENTRANCEI>PEDESTRIAN
ENTRANCE
occ
1 IR, baa oaa.
PARKING REQ'D FOR PHASE 1 (3 STORY
PORTION; 48,517 SF/1,000 SF = 48.52.
48.52x4.5) = 219
(@ 4.5/1000 SF)
ON-SITE PARKING: 330
ADA PARKING: 32
STANDARD PARKING: 298
• •KAISER TAYLORPERMANENTE
O
NOT TO SCALE
07/18/2017 18 of 29
1
ALTERNOIVE 2
PHASE 3:CONSTURCTION OF MOB ADDITION
CONSTRUCTION DURATION
(MONTHS)
•••
••
•••
•••
• ••
••
•
•••••••
••
••
••
••
••
••
••
••
• ••
•••
••
•
•
••
• • •••••
••
•
•••
••
••
••
••
•••
••
•
•ISIS •
•
MAKE-READY SITE WORK 2
FOR NEW ADDITION
CONSTRUCTION OF NEW 14
ADDITION
r
gramm••• •••• •• ••amommeamaeam•••• •..11
;
I .
;;;;
;1•11•111•••••••••21•11M5M.••••••••••••••••••11041•11M6M-••••••••••••••••••41•••••••••••••••201-E1•11•10.M.M1M-••••••••••••••••.O.6.1•44
...O.SOM.Mfaf•VE.1.01.1111.110111.1118.111.6.11.1.04M1101.M10.6.10.1.11m
STAFF SERVICE ENTRANCE
•
! 4-- ;
•
0
•
ENTglANCE
BEACH
BLVD
•
-
:•
ENTRANCEI>
-
L,)1
.1!t 1,
1-24
REMOVE CONSTRUCTION 2
BARRIER AND PERFORM
SITE IMPROVEMENTS
-LANDSCAPING
_q E
-HARDSCAPE
-UTILITIES
CODE PARKING DEFICIT 18
PARKING REQ'D FOR PHASE 1 (3 STORY
PORTION; 48,517 SF/1,000 SF = 48.52.
48.52x4.5) = 219
(@ 4.5/1000 SF)
ON-SITE PARKING: 330
ADA PARKING: 32
STANDARD PARKING: 298
O
•KAISER TAYLOR4PERMANENTE 07/18/2017 19 of 29
NOT TO SCALE
ALTERNAIIVE 2
PHASE3: COMPLETION OF MOB ADDITION
NEW ADDITION IS COMPLETE
LANDSCAPING COMPLETE
HARDSCAPE COMPLETE
UTILITIES COMPLETE
••••
• •••••
•••
••
••••••
•••
••
•••
••
••
•••
••
••
• ••
555 •
••
••
•
5555 ••••
•
••
•••
•
••
••
•
•••
••
••555.
•
•
r--
30'-0"
38'-0"130'-2"109'-1"
SOMM....6.4011SISSOBN.M S.S.SOMISSO.M11•11.4. .11.1104.S.4.164111
ENTRANCE
I
STAFF SERVICE ENTRAN E
-
0
1121fOISVO.02U.S1U.OVOIMOSIMOVIISIMISIOV
BEACH
BLVD
:I •
-9 •
ENTRANCE
ENTRANCEI>
;
1PEDE-STRIANENTRANCE
'
;
;
;
9
1.
;
;
;
;
;
loornsm.milm.milmem.m...ernow...m.a...milmomomosswomememmessmoom.stm.masem.m.som.m.m.mam.men.mgmemem.m.mos.
r•••••• ••• ••••• ••111•1•••••••• •1•115
—
PARKING REQ'D (48.517 SF+20,000
SF=681517SF: 68,517/1000 SF = 68.52:
68.52x4.5) = 309
(@ 4.5/1000 SF)
ON-SITE PARKING: 330
ADA PARKING: 32
STANDARD PARKING: 298
• •\ipf KAISER TAYLORPERMANENTE
O
NOT TO SCALE
07/18/2017 20 of 29
ALTERNATIVE 2
PHASE3: LANDSCAPEPLAN •••
•
•••
••••••••
••
••
•••••
•••••
•••
••
•
••
••••
••
•
•
••
•
•
••
•
••
•
•••
•LEGEND:
• •
••••
• • • • •
EVENT LAWN
COFFEE KIOSK
DATE PALM COURT
DROP OFF
THRIVE WALK
QUEEN PALMS
SOUND WALL
HEALING GARDEN
BIOFILTRATION PLANTER
LANDSCAPE AREA:
REQUIREMENT OF 100 SF OPEN SPACE
PER 1000 SF BUILDING
BUILDING SF REQ'D OPEN SPACE
48,517 (PH. 1)4,852
28,365 (PH. 2)2,836
20 000 PH. 3 2 000
88,223 9 688
PROVIDED AREA: 38,169 SF O
NOT TO SCALE
J L 0
-
-
1
S.
m 4,1
,t4
9 •
i(IPEDESTRIANENTRANCEENTRANCEI>
SI
-
4.4 4 4 4;
44
STAFF SERVICE ENTRANCE
-
•
•
•
41
,N1
11,...............,.....,.....,.....,,J
,i.Ji.1.41)..41444 .4 ,Z'4. ,
i _Aii Ail A
,4 4 Ai .C*1 AO
..4...........7........................................................................................................,
BEACH
BLVD
• •\IN KAISER TAYLORPERMANENTE 07/18/2017 21 of 29
ALTERNOIVE
2
VIEW
F
R
O
M
S
O
U
T
H
PHASE
2
4
S
T
O
R
Y
G
A
R
A
G
E
280
S
P
A
C
E
S
At*
A
s
PHASE
3
2
S
T
O
R
Y
20,000
S
F
1-1
PHASE
1
3
S
T
O
R
Y
48,517
S
F
••••
•
•
•
•
•
•
•••
„,••.-
'
.
:
"
,
:
-
,
11111k.
••
• •
S.
••
•
5555••
:.".
•
••••••
••••
•
• •
••
••
•
• • •
•••• ••
• •• ••
•
••• ••
••••• ••
•.\litt
M
I
S
E
R
PERMANENTETAY
L
O
R 07/18/2017 22
o
f
2
9
ALTERNAVE
2
VIEW
F
R
O
M
S
O
U
T
H
W
E
S
T •••
••
•
• •••
•••••
•••
••••••
••
••••
••
••••
•••
••••
••
••
••••••••••
•;••
••
••'410 •
••
•
••
•
•
00
c-
•
•
KAIsER t-PERMANENTE TAYLOR 07/18/2017 23
o
f
2
9
ALTERNATIVE2
VIEW
F
R
O
M
S
O
U
T
H
E
A
S
T
•••
•
•
••
•••
•••
••
•••••
••••
••
•••
•
••
•••
•
••
•••
555
•
•
••
••
•••••••**••••••
••
••
•••
••••••
••e e•••
•
••
-
•
•IN'KAISER PERMANENTETAYLOR 07/18/2017 24
o
f
2
9
•••
•
S
••
•••
•••
•••••••
••••
••
•••
•
••
•••
•
••
•••
555
•
ALTERNAVE 2
VIEW FROM NORTH EAST
411
.14
0
OD •Mpf KAISER PERMANENTETAYLOR
07/18/2017 25
o
f
2
9
ALTERNAVE
2
VIEW
F
R
O
M
S
O
U
T
H
E
A
S
T
0 •••••• ••••
••••••••
••
••
•••
•••
••
••
•••
••
••
•••
••
•
••
•••••••••
Jioor
_
-4
•••vp,KAISER PERMANENTETAYLOR 07/18/2017 26
o
f
2
9
• •'VW KAISER TAY LORPERMANENTE 07/18/2017 27 of 29
KAISER PERMANENTE
HUNTINGTON BEACH
OFFISITE$ARKING OPTIC%1
HUNTINGTON BEACHSPORTS COMPLEX:•
0••••
•••••
•
• •
4
•
0• • •
04••• •
OO OP
••0 •
••
•••••••••
•
••
•••
•
•.•
•
400•
•
••
O.'• a ISO
X41.4.
-4 •
Lilo—8min
.21.4
(141171...
ocw
WI".
-*PROPOSED OFF SITE
PARKING LOCATION
9 •*
•
0
•
••••••
•••
•
••••••
••*
•••
a 1 •
••
••
4 4 •
••
0 S
•••
••
•
••
•a •••••••••
•
•4•
•
•
•••••
••••••••
•••
OFFISITEfARKING OPTIC%2
HUNTINGTON BEACHELKSLODGE:
•*- PROPOSED OFF SITEPARKING LOCATION
O
•
•KAISER PERMANENTE
HUNTINGTON BEACH
•MTh KAISER TAYLORPERMANENTE 07/18/2017 28
o
f
2
9
•• •
••
•••
••
•••
•
•
•••••
••
*
••
•9 •
••
••
•••
••
••
••••
••••
•
••
•
•••••••••
•
••
•••
••
•••
••
•
•••
•41
••••••
•
••
OFFISITE,ARKING OPTIC%3
ST. VINCENT DE PAUL:
PROPOSED OFF SITE
PARKING LOCATION
11**-111vreilliI -Ntst'"A.A, ,AM .
411%–•,,4— -J0,•:-isi31.0.. , .....,,. _
•
•••911 o • :
I.•• •‘•
•
•
" •
6;
C.toll.11.1 1
_*1.1
P ITgl'in
KAISER PERMANENTE
HUNTINGTON BEACH
• •Vpf KAISER TAYLOR
07/18/2017 29 of 29PERMANENTE