HomeMy WebLinkAboutSupplemental Communication - Study Session #1 - PowerPoint cCITY OF HUNTINGTON BEACH
PUBLIC WORKS DEPARTMENT
FY 2018/2019
CAPITAL IMPROVEMENT PROGRAM (CIP)
r.
1' TREE
MA /NTE NANC;E
17/18 SUCCESSES
STRATEGIC PLAN GOAL
ENC E A N D MAI IN rA
�NpRASTRUCTURE�N
17/18 SUCCESSES
PARKS & BEACHES
Central Park East Improvements
Park Bench Cafe Parking Lot
Pathways
Irrigation
Irby Park Improvements
�,: W.4 X,
17/18 SUCCESSES
PARKS & BEACHES
Beach Playground
Sports Complex Turf Replacement
Worthy Park Iq
HUNTINCTON ®EAeN H
Ar-
17/18 SUCCESSES
STREETS
Rehab 4 miles of arterials
Heil/Main/Atlanta/Adams
Heil/Slater/Indianapolis underway
Bridge Preventative Maintenance
Brookhurst and Magnolia (80%
Done)
Zone 1 Maintenance (Underway)
Overlay 8 miles of residential streets
Slurry 7 miles of residential streets
New ADA ramps
17/18 SUCCESSES
SEWER
Lined 3,500 feet of sewer mains
Started Edgewater Lift Station
WATER
Beach Blvd. water main
extension project
Completed drilling of Well 1
Well 9 Treatment System
17/18 SUCCESSES
*) FACILITIES
Rehabilitation of Main Prom
Parking Structure Restrooms
Council Chambers AN
Upgrade
CAPITAL IMPROVEMENT PROGRAM (CIP
Approximately $25M in New Projects
• DRAINAGE /WATER
QUALITY
■■■
FACILITIES
NEIGHBORHOOD
Ago%. PARKS AND BEACHES
SEWER
•
STREETS AND
TRANSPORTATION
FY 18/19 CIP BUDGET
Budget
New Appropriations: $24.7M
Continuing Appropriations: 3.2M
Total $27.9M
WATER
Funding sources include:
General Fund
Enterprise Funds (water and Sewer)
Special Revenue Funds (Measure M, Gas Tax, Prop 42,
RMRA/SB 1, AQMD, Park)
Grants (Federal, State, & OCTA)
CIP FUNDING SOURCES
(NEW APPROPRIATIONS)
$800.000
Infrastructure Fund
3%
$4.080.000 .420.000
Sewer Funds `'liater Funds
$1.900.000 18%
Measure M 17%
53.280.923
8% RMRA
13%
$463,288 / $5.072,332
Grants/Other General Fund $3.170.000
1% 21%
Gas Tax/Prop 42
13%
$1,531.000
Park Funds
6%
FACILITIES AND FLEET INFRASTRUCTURE
825 Pieces of Fleet Inventory
11 Fuel Islands
with 19 Dispensers
16 Underground Fuel Tanks 300+ Facilities/Structures
12
FACILITIES $3.OM
Central Library Restrooms ADA Imp. $315k
H B Art Center Improvements $74k
• Newland House Museum Imp. $50k
•:= Fiber Expansion Project $180k
Central Library Main Theater Imp. $100k
Lake Fire Station Renovation $125k
Jail Renovation $145k
• Police Lower Level Renovation $2M
NEIGHBORHOOD INFRASTRUCTURE
316 Miles of Residential
Streets 33 Miles of Alleys
(HB to Yosemite) A
iQ,
632 Miles of Sidewalk/Parkway
(H B to Provo Utah)
NEIGHBORHOOD $3.2M
Alley Rehabilitation $300k
Concrete Replacement $250k
Residential Overlay Zone 6 $2.6M
Ocean View Estate:; Parking $75k
Before ,� After
41-
PARKS AND BEACHES
$2.6M
•:
Central Park Improvements
$400k
•:
Beach Showers Replacement
$90k
•r•
Playground Improvements
$54k
•:
HCP Sports Complex Turf
$194k
Hunt. Harbour Bulkhead Study
$70k
.•
Former Gun Range Dev. Study
$50k
Murdy Park Sports Field
$427k
�•
Murdy &Edison Comm. Center Imp.
$50k
•
Central Park Restrooms
$1M
�•
Central Park High Mast Pole Repl.
$280k
SEWER INFRASTRUCTURE
52,000
Service Laterals
27 Lift Stations
2.3 Miles of Force
Mains
CCTV Sewer Mains
7,678 Manholes
All sewage delivered to OCSD
-� 4'v��U
360 Miles of Pipelines
SEWER IMPROVEMENTS $
Sewer Lift Station Improvements
Saybrook LS (Construction)
New Britian LS (Design)
Sewer Lining —Various Locations
4.OM
040
Sewer Lift ion
$500k
im
STREET INFRASTRUCTURE
yr.
100 Miles of
Arterial Streets
(HB to Ventura)
200 Miles of Sidewalk and
Parkways (HB to San Luis Obispo)
4,430,000 SF of AC Parking Lot
TRANSPORTATION INFRASTRUCTURE
tfRf ,
a
143 Signalized
Intersections
3,765 Park, Parking Lot, and
Street Lights
78 Miles of Bike Lanes
19 Miles of Bike/Pedestrian
Paths
20
STREETS & TRANSPORTATION $7.5M $!jibmi
Arterial Rehabilitation
Edinger/Saybrook/Algonquin/Slater/Newland/Graham/Delaware/Atlanta
Includes $1.7M rebudgeted due to short Fiscal Year
Edinger/Atlanta/Brookhurst
Arterial Rehab — Before
Arterial Rehab —After
W
STREETS & TRANSPORTATION (CONT.)
Downtown Street Lighting
Newland T.S. Interconnect
Traffic Signal Projects
Bolsa Chica/Pearce — Main/17th $98k
Goldenwest/Heil $52k
Brookhurst/Indianapolis $75k
$452k
$131 k
$225k
WATER INFRASTRUCTURE
20 Miles of Shared
Transmission Mains
(OC-9, OC-35 and OC-44)
- 53 091
Meter Connections
17,749
Control Valves f:
. 1A4
3 Emergency .
Connections 5,801
(Fountain Valley, Seal Public Hydrants
Beach, Westminster)
25
WATER IMPROVEMENTS $4.4M
•• Water Distribution Improvements $25k
Water Production Improvements $875k
Water Main Replacements $3.4M
•. Water Facilities Security Imp. $100k
UNFUNDED/DEFERRED PROJECTS
$12.2M in projects requesting General Fund
submitted this year and not funded
Facilities $6.2M
Parks and Beaches $970k
$200M in unfunded infrastructure needs
Reserve Policy Revisions
Water Fund
Reserve equal to 25% (was 33%) of the adopted annual budget to ensure adequate working
capital for operating expenses.
Water Master Plan (New)
One -hundred -fifty percent (150%) of the average planned Water Master Plan Capital
Improvement Program for the following five years.
Cost of thirty (30) months of imported water needed to replace the production from the
average City well.
Emergency: Cost to replace one groundwater well
Sewer Service Fund (Existing)
33% of the adopted annual budget to ensure adequate working capital for operating
expenses.
One -hundred percent (100%) of the average annual planned Capital Improvement Program
for the following five years.
Emergency: Cost to replace one sewer lift station.
NATIONAL PUBLIC WORKS WEEK
OPEN HOUSE AT SURF CITY NIGHTS
TC)MC)RRC)\Al NIC;HTIIIII
THANK YOU
QUESTIONS?