HomeMy WebLinkAboutAmend previously approved Park Playground and Equipment Repl APP>20VtD ��yyTINCIp'' C 3RE✓Dew, DEL. Iz ABSENT) City of Huntington Beach File #: 19-239 MEETING DATE: 3/18/2019 REQUEST FOR CITY COUNCIL ACTION SUBMITTED TO: Honorable Mayor and City Council Members SUBMITTED BY: Fred A. Wilson, City Manager PREPARED BY: Chris Slama, Interim Director of Community Services Subject: Amend the previously approved Park Playground and Equipment Replacement Priority List and appropriate funds from the Park Development Impact Fund for installation of new playground equipment at Tarbox Park in the amount of$91,000 Statement of Issue: There is a need to amend the previously approved Park Playground and Equipment Replacement Priority List and appropriate funds to install new playground equipment at Tarbox Park. Financial Impact: Funding for $91,000 to install playground equipment at Tarbox Park is available in the Park Development Impact Fund 228 fund balance. City Council authorization is requested to appropriate from available fund balance, since this project was not anticipated as part of the FY 2018/19 budget. Sufficient funds are available in the Fund 228 fund balance. Recommended Action: A) Approve the amendment of the previously approved Park Playground and Equipment Replacement Priority List; and, B) Authorize an appropriation increase of$91,000 into Park Development Impact account 22845001.82900 for the installation of new playground equipment at Tarbox Park. Alternative Action(s): Do not approve the recommended action and direct staff accordingly. Analysis: Tarbox Park is a mini park in Huntington Harbour, located at 16601 Wellington Circle. Tarbox Park is very popular and highly attended in the harbor area, being the only park that is within the recommended 0.5-mile walking distance, per the Parks & Recreation Master Plan. There are no other parks within walking distance on Gilbert Island. Amenities also include a park bench and open grass area, making the park a favorite location for the surrounding community. City of Huntington Beach Page 1 of 2 Printed on 3/13/2019 powered44 Legistarr"' File #: 19-239 MEETING DATE: 3/18/2019 On November 29, 2018, the playground equipment at Tarbox Park was found to be damaged most likely due to a previous rainstorm. Following a joint inspection of the damage by staff of the Community Services and Public Works Departments, it was determined that the condition of the playground equipment was not salvageable and needed removal. Upon removal of the playground equipment, staff also become aware that the rubber surfacing had deteriorated in some locations, also requiring repair. Since that time, staff has received feedback from several residents about the absence of playground equipment. Public Works was recently able to address some needed repairs to the rubber surfacing, but lacks funding to replace an entire play structure. On November 19, 2018, City Council approved the Park Playground and Equipment Replacement Priority List, featuring 27 parks in need of equipment replacement. Tarbox Park was not included in that list, nor was there any language in the approved RCA regarding replacement of playground equipment due to unforeseen circumstances (Attachment 1). Therefore, staff is requesting that the list be amended to include Tarbox Park (Attachment 2, Item #3). Construction of the playground improvements at Oak View and Seabridge Parks (park priorities #1 and #2) are underway and will be completed within the next month. The General Plan identifies mini parks, such as Tarbox Park, as a necessary element of the Environmental and Conservation Element of the General Plan and even identifies Tarbox Park as a representative facility. The playground equipment is consistent with the City's General Plan, and if approved, will continue to meet the recreational requirements of additional residents and visitors resulting from new residential and commercial development. At their February 13, 2019, meeting, the Community Services Commission approved the recommendation to amend the previously approved Park Playground and Equipment Replacement Priority List, to appropriate funding in the amount of$91,000 (including 10% contingency) from the Park Development Impact Fund, and to present the item to City Council for approval. Environmental Status: Not applicable. Strategic Plan Goal: Improve quality of life Attachment(s): 1. November 19, 2018, Approved Park Playground and Equipment Replacement Priority List RCA and Attachments. 2. Amended Park Playground and Equipment Replacement Priority List. City of Huntington Beach Page 2 of 2 Printed on 3/13/2019 powered441j LegistarTr' ATTACHMENT # 1 6/44,../ UNTINGTjQe City of Huntington Beach <,'J 9�cFCdUNT1 CPS File #: 18-488 MEETING DATE: 11/19/2018 REQUEST FOR CITY COUNCIL ACTION SUBMITTED TO: Honorable Mayor and City Council Members SUBMITTED BY: Fred A. Wilson, City Manager PREPARED BY: Chris Slama, Interim Director of Community Services Subject: Approve the City's Park Playground Equipment Replacement Priority List Statement of Issue: Based on a recommendation by the Playground Equipment & Park Maintenance Committee, the Community Services Commission has approved a playground equipment replacement priority list. City Council is being asked to approve the priority list based upon the Community Services Commission recommendation. Financial Impact: No specific funding source is being identified at this time. Funding sources will be identified through future budget processes, available grant funds or donations. Recommended Action: Approve the City's park playground equipment replacement priority list, with an emphasis on playgrounds surfaced with a combination of rubberized material and sand whenever possible, and apply for applicable grants and other funding sources. Alternative Action(s): Do not approve the recommended action and direct staff accordingly. Analysis: Currently, there are 77 parks in the City's park system consisting of active, passive, and open space uses. Of the 77 parks, a total of 65 include tot lots with a total of 450 play units. Play units range from individual structures, group structures and/or swings. The play units are designed to meet all safety standards as established by the Consumer Product Safety Commission (CPSC) and accessibility requirements per Americans with Disabilities Act (ADA). The life expectancy of play units per industry estimations is an average of 15 years. The Parks, Trees and Landscape (PTL) Division of Public Works inspects the units for safety on a regular basis and makes repairs when City of Huntington Beach Page 1 of 3 Printed on 11/15/2018 powered4 'Legistar r" Impact Fund, and to present the item to City Council for approval. Environmental Status: Not applicable. Strategic Plan Goal: Improve quality of life Attachment(s): 1. November 19, 2018, Approved Park Playground and Equipment Replacement Priority List RCA and Attachments. 2. Amended Park Playground and Equipment Replacement Priority List. City of Huntington Beach Page 2 of 2 Printed on 3/13/2019 powered441j LegistarTr' File #: 18-488 MEETING DATE: 11/19/2018 possible. Within the past few years, several parks have received new units through grant funds, such as Harbour View and Newland Parks, which now have play units that are in good condition. Other parks such as Clegg-Stacey and Edison Parks have recently received new units due to the failing condition of the previous units. However, at remaining parks, many of the play units are coming to the end of their life expectancy and some units will no longer be able to be repaired. The majority of parks received new equipment utilizing State Park bond funds with the last major replacement efforts occurring in the late 1990's and early 2000's. The replacements were completed as major projects and, in both cases, the equipment replacement was conducted based upon a priority ranking approved by the Commission. Due to the volume of parks and play units, the Community Services Commission (CSC) approved recommending review of a playground equipment inventory list to the Playground Equipment & Park Maintenance Committee (PE&PMC) at the October 11, 2017, CSC meeting. The PE&PMC met several times to discuss PTL's process on inspecting each park and the condition of the play equipment. The rating sheets from PTL's inspections provided detailed information on which play equipment needs attention, whether or not the playground meets ADA requirements for access to the play equipment, as well as an overall rating of poor, fair, and good (Attachment 1). Based on this information, the PE&PMC directed staff to create a priority list based on which parks did not meet ADA requirements, parks that are in poor condition, and parks that are of high-use. In an effort to control costs, the Committee recommended that partial rubber surfacing be installed when possible as opposed to full rubber surfacing at the playgrounds. The Committee felt that having partial sand and partial rubber surfacing allowed for different play options for park users. The PE&PMC also requested staff to provide an estimated cost breakdown for each park to include the cost of new rubber surfacing to meet ADA requirements, as well as the neighborhood park standard amenities: one swing set, one unit for the 2-5 year old age group, and one unit for the 5-12 year old age group. Committee members also toured a playground inspection with PTL to get a better understanding on the process and requirements for a playground to meet ADA standards. At the September 27, 2018. PE&PMC meeting, staff presented to the committee a park playground equipment replacement priority list and packet that included information on each park's condition and estimated cost breakdown for replacement (Attachments 2 and 3). Should new equipment and partial rubberized surfacing be installed at all 27 parks listed as priority, the total estimated cost would be $3,262,174. Please note that previous playground equipment replacement projects have been phased over several years based on availability of funds. Based on the information provided, the PE&PMC made the recommendation for Commission to approve the park playground equipment replacement priority list as presented. Environmental Status: The establishment of a park playground equipment replacement priority list is exempt pursuant to Section 15061(b)(3) of the CEQA Guidelines, which exempts projects where it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the City of Huntington Beach Page 2 of 3 Printed on 11/15/2018 powereoLta Legistar File #: 18-488 MEETING DATE: 11/19/2018 environment. Strategic Plan Goal: Enhance and maintain infrastructure Attachment(s): 1. Park Playground Inventory List 2. Park Playground Equipment Replacement Priority List 3. Park Playground Information Sheets City of Huntington Beach Page 3 of 3 Printed on 11/15/2018 powered LegistarT U, v 0 E c. 0 Y - T 0 4 r^~ .. _.c •^��•' ✓ iZ '3 0 .ti ,^ N cO U a O .',.. L+ :9 Al m ^. ..^ 7. c.• 43 G �n a'-' N '^ v G G V▪ s 2 r. c 0.. r: n 2 c in m ® V µ tw 4 ,33 ,1 o 0 o �,. 0 _ L.L.. cr0 `0 o �a t - a ,fa ... �.. u.. .+. ..L �' 0 r-. i' u..T. 0 Zu L O 2 Je F- c 0 u to q 'c O• 3 1 „" c c N IIV Z m to F. c w _ a u x w a 5, Z D so O cc C m x x x L. x x } m Q J a. • N b .3 x x X x x x x x x x x x x x x x x x x x x x x x, X X X X X X x x X X i. m, . ° cc 0 ac0G .0, 3 _ _ .. m . "05 , . 5w .0 ""0 0 n - '0 ,c .0 '0 _ 3 R .c s -0 . . .0 . ;c , - .0 L .0 'a +T M _ E E. E ' E = E E E ,^a c E ? a E E ro -. E E E c Y E E E E P o E m E E E = `o 17. in1 vt Q i w G 0 C ci, o "- C c e ;+± C ^ i ,A o f ?r , > 0 a n ® G J o a a y b +a 0 O ✓; G a V V U V V V V 0 Li V G U U Jt, 4 V L} V V V tJ V V V N [+-+ X N N CO V X X X X 5 x' X OO .N+ X G0 N X UJ N x X U N V X X SA CA CO OD CO N W X C6 X X 0 [G N X C C ti C. C O O O 0 O 0 C O 0 O P. O 0 Q O O C L O O O O ✓, C 00 .00 0 0 O O 0 U 01 J O 0 9 0 O O 6 0 0 0 0 ^.. O 01 0 O IV ry J N. N N N M1t 'Y fw N +i N fN r N N N ',N 0,: N N N ^t 'U fy it A N ih N N x C CO X UW W X 0. N W X X q W X 4f 0y. LO 0S N � X X W X ▪ RNZEE 4 L Q C O OC 0 0 C 0 C ^ C C rL C .�! 0 0 0 C C O O v O C 0, O 0 ^. 0, N N 0. N N N N N N N N N tN +^. N N Cti 01 N V V in N 3. RF V J G e x -a G U C a C O J 7c a r to 5. "0 U U ` 2 v t O .X YC - O V H ' > 0U4 } o ^0 C T. l ig yU v ry' s x .. . . ypN , U x ro 2 u 4LEw cG4 3a cci G 'n4, 'a _ .n +ii ,,a BQA m C i! a < ¢ 2 .2 O 2 2 2 3 3 3 3 8 3 0 v 8 -5Q .2 au47 6 L o V S 2 2 x x 2 o C 0 a al 2 2 2 2 quipment replacement priority list is exempt pursuant to Section 15061(b)(3) of the CEQA Guidelines, which exempts projects where it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the City of Huntington Beach Page 2 of 3 Printed on 11/15/2018 powereoLta Legistar 0 -4- o ..o • E o ,.., a ...., c.; T., 3 0 ..^. ,•, L, 0 t • c .2 6'.. ... , .:P. a 7i a 2 a • E, 2 7 a y-. E. t-..•.... a 8 E 0* „.,.-." 7;a , .. ..... LI '.•' e 5 .E •E' -o c t - '5 2- c..A ,, c E c a E .:....-' ..o y ...... .t, c ,<L,u y , . -.. '','• e, o y ,%-.. . 2 a. ..... .,, ...o c 0, t j ..D •s. 6 n- :5 3 2 .Y. t, ,, ... ._ . -,,; E .. 7 • a a r., a. .'. 8 .,,-- =7, .7. r- > VI C 0 - '.. ?.... < f., a 0 _ o.T. a ' , 'AF... < en en a n en o" 0` o o a. 0. , ,...1 a tu 1; ,..;. e•.7, 7 47. V .= ..,..... _." `‘: 2 o „.; e., 7°' -.% 7_ ‘r.7:- ....% •7:1.. a 7, m 7-.; 0 •...T. St a;... Z.1 o .-• a. ,cr Oo t 1'2 7o ra x x . . x x x a x x xxx x xxx x x x xx • o o o Jo ....o 2 _ 2 _-0 •-• -. , , , 2 _ _ 2, '2' 2 c ° ° _.. ... .. -.. ... , EEE o o 5 g '7 g 2 5 '5 5 5 oE -5"- oE .Eo g L 1. ""-E Ea !'.•'' 0a L.) (..., <1 V U 0 U Cd LI 41 U U COa XX X X = X , a a MCDCO X XaXaa , CO , 0 0 C 00 = aa a 'a --.., 0 C 0 0 0 0 0 0 0 0 0 5 a a a a a a a a a a a a a a a a a a a >Ca a a a a a a aX a aa a aa 0 a a a a aa a a aa 0 aa a a a ----' 5— 0 0 c a a o c a a a a a a a a -----..--.- 3 7.-. a -6 z .r1 _ ..x .. t..- :.-. 6... ,..7., ,s. -,-,,, r: E • _ -1-..... -a c o so Z5 0 G 7=, g "7 7 , u '-' -.. ,, I- ,.. .c, t-, x ,,. .... 'A` r- , t, 4 4 5 , o -0 ----7 H :1 .'1'. L' ..° — > ;.,- ,..- A' .o •... t • f.: Z 2.1 C a -.....P, g ----^.- t '....P• ..'' 2 2 z z c , .... n_ n_ — vl , v, ,.., v., ,, v•A ,-- I— -..-- ,-- .... 2 u 4LEw cG4 3a cci G 'n4, 'a _ .n +ii ,,a BQA m C i! a < ¢ 2 .2 O 2 2 2 3 3 3 3 8 3 0 v 8 -5Q .2 au47 6 L o V S 2 2 x x 2 o C 0 a al 2 2 2 2 quipment replacement priority list is exempt pursuant to Section 15061(b)(3) of the CEQA Guidelines, which exempts projects where it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the City of Huntington Beach Page 2 of 3 Printed on 11/15/2018 powereoLta Legistar r-- *1- -0 0 0-1 0J / * > > VI -T, 0 0 V) >- cc E " (1.) l ' < ,I1) ''' v' IoD • 4--' Lri c11 CCEC rts rO C 0 8 M 7 c) •-• 0.) CI) 3 0 z 4- ›.. >. L ,-.-,--, 0 0 0 7 -re () 2 cg: c, to .4 C-'▪ ga 0_ E ,,o ._c ._c ...., „.. ro C 1— 2 7, < < if.) _1 ,./) v.) ui Z w 2 VI ,vo VI of; LW C N •3 rs4- VI , LU Ln 00 0.0 no VI - Ln c4 ct C ,c C',1 C N • N .. N 0 Lri § § r-I .' LT) V) '471 V) ...f1' 71 VI ul 71 1--_,, •Or ("V uo Lr) , 1.11 , , IIIIIII a a a VI N! N 111 N N III c•-•!., N ul G LU 2 0 D Ci LU 06 v, V) VI 4.41 VI v) IA Z CC OD 00 CD CD OD 00 c c c c c c c ._ __ ,...... .._ ._ ..... 0 VI,,, v. 0.0 v., v) 00 no 0 taD V) VI VI VI Vi V) vi Ln no (I) CID CC < C C csi CC C C C C C ---;-, ._ ___ ._ - . „ - - ,. (N CV N N N N 00 C '- ...„- 0 ° rl ',- > > 4-1 rl ri rl .4-1 ri 5 • < 1 > VI VI III VI1 1 1 4 i 1 3 VI VI V) LA - V) V) 1./1 1.1-11 V) Llh Ln MO ..er, Z N N N N N N . . . (N N (N , N C Ni 30 Lh. Lf).' 4-4 er .--1 rl ri r4 if) Lr-) u-} Lr-j Lrc Li) ,--4 ,--i ,-, Li-) r-a 11111111111113 1 . = Zit It".4 C..1 1.)) VI V) Ln Ln Ln IN N N r--I N N Ln Ln Ln N LI-, Ii) , 1.,1 CC < CL in L" Z CI 0 N (^4 C C./ Z PI .,,.,. E LU — Ln cl. L-1 "..:1!. ._ -,,,- L... ,- •- L.. ,-.. -0 ' 2 - 0 0 0 0 0 1._ s.- s- s- s... 1... s.- s- s.... L. s.- 0 s- '6.- 8 5- 1.- 1.- 0000 © 0 Cli 4_, - 0000 0 0FilrE, 76 "iki 'r-s To 'r7; 'r-o- To- 'rTli 'c'ti ,2 -Fn. 75 0 '(7 ,,7 0 0 0 0 __, LL.1 U _ CL CL a.. „._ u._ u_ ._ u_ u_ ...,._ .._ u_ u.... LL ,,,, Li.. u_ 0_ u_ u_ u_ 0_ a_ a_ 0._ . 0 0 ° Z I- (4.) C ' LU ro CC * LA cC :E a) ,..4., I.— L-- 5 < L. * a.) Ill LI. 0) --• Cr s:( CLi ro _J U Cr, * _..Y •- -1:5 r‘, c..1 ,'l ,.._ -- 4-1 Cl) o.)._ 5 L,- ti; 0 i I.- > C •-• c _o C C ...I a) 0 •- 0_, 4-, (1.1 48-p '--r,2 a, r-> — c a., - n 2 c 0 C r o > 5 >„ li-, >. ..-, a. r.../1 C (../ a 0< _c (43 1.1 _NG (t/ (1.1 U -0 ro m '- .- — ro ro .1 cv 11) 0 u co = CI -r-o 0.3 (-) (-) ct. CD u-) I Lu LU cc 0 .0 (.9 I _I _u Z 0- C V) G < -.1 t.r) 4-n I- 0- 03 I = 0- * yj 1-1 rNi Oak View 17261 Oak Lane Condition: POOR High Use: Yes ADA: Yes ISSUES: • Rubber surfacing needs patching. • Approach steps, transfer stations, hand rails, stairs, climbers rusted and corroded beyond repair • Slides cracked • Hanger clamps broken • Multiple missing rivets • All plastic worn with graffiti/etching . • won ,11 was Estimated Costs to Replace Existing Playground Equipment incl, Install l Swing Set $3,100 2-5 Years $A0,000 5-12 Years $65,000 Estimated Costs for Rubberized Surfacing Incl. Install Partial (950 SF) $29,184 Full(5,521 SF) $169,605 TOTAL COST FOR EQUIPMENT & SURFACING Partial $137,284 Full $277,705 48 Seabridge 16252 Countess Drive Condition: POOR High Use: Yes ISSUES: • ADA: No. Needs rubber surfacing. • All play units have been removed $ ••% • * 4 • • • * ••:• • t; Vt4 I • n • • r , i• dtpl - OM= 14t. t , , 4014. L, „„itt, •t"i' • ; " Ne • lir 111 .1" ' .41 - - %, • * .` 4 - - _ - , - = Estimated Costs to Replace Existing Playground Equipment Md. Install 1 Swing Set $3,100 2-5 Years $40,000 5-12 Years 565,000 Estimated Costs for Rubberized Surfacing incl. Install Partial (660 SF) $20,275 Full (5,565 SF) $170,959 TOTAL COST FOR EQUIPMENT & SURFACING Partial $128,375 Full $279,059 4 9 ._ __ ,...... .._ ._ ..... 0 VI,,, v. 0.0 v., v) 00 no 0 taD V) VI VI VI Vi V) vi Ln no (I) CID CC < C C csi CC C C C C C ---;-, ._ ___ ._ - . „ - - ,. (N CV N N N N 00 C '- ...„- 0 ° rl ',- > > 4-1 rl ri rl .4-1 ri 5 • < 1 > VI VI III VI1 1 1 4 i 1 3 VI VI V) LA - V) V) 1./1 1.1-11 V) Llh Ln MO ..er, Z N N N N N N . . . (N N (N , N C Ni 30 Lh. Lf).' 4-4 er .--1 rl ri r4 if) Lr-) u-} Lr-j Lrc Li) ,--4 ,--i ,-, Li-) r-a 11111111111113 1 . = Zit It".4 C..1 1.)) VI V) Ln Ln Ln IN N N r--I N N Ln Ln Ln N LI-, Ii) , 1.,1 CC < CL in L" Z CI 0 N (^4 C C./ Z PI .,,.,. E LU — Ln cl. L-1 "..:1!. ._ -,,,- L... ,- •- L.. ,-.. -0 ' 2 - 0 0 0 0 0 1._ s.- s- s- s... 1... s.- s- s.... L. s.- 0 s- '6.- 8 5- 1.- 1.- 0000 © 0 Cli 4_, - 0000 0 0FilrE, 76 "iki 'r-s To 'r7; 'r-o- To- 'rTli 'c'ti ,2 -Fn. 75 0 '(7 ,,7 0 0 0 0 __, LL.1 U _ CL CL a.. „._ u._ u_ ._ u_ u_ ...,._ .._ u_ u.... LL ,,,, Li.. u_ 0_ u_ u_ u_ 0_ a_ a_ 0._ . 0 0 ° Z I- (4.) C ' LU ro CC * LA cC :E a) ,..4., I.— L-- 5 < L. * a.) Ill LI. 0) --• Cr s:( CLi ro _J U Cr, * _..Y •- -1:5 r‘, c..1 ,'l ,.._ -- 4-1 Cl) o.)._ 5 L,- ti; 0 i I.- > C •-• c _o C C ...I a) 0 •- 0_, 4-, (1.1 48-p '--r,2 a, r-> — c a., - n 2 c 0 C r o > 5 >„ li-, >. ..-, a. r.../1 C (../ a 0< _c (43 1.1 _NG (t/ (1.1 U -0 ro m '- .- — ro ro .1 cv 11) 0 u co = CI -r-o 0.3 (-) (-) ct. CD u-) I Lu LU cc 0 .0 (.9 I _I _u Z 0- C V) G < -.1 t.r) 4-n I- 0- 03 I = 0- * yj 1-1 rNi HCP Lower Lake 18000 Goldenwest St. Condition: POOR High Use: Yes ADA: Yes ISSUES: . All play units have been removed - — - ,. t'`.• il• stt.,.. , • • . ..,,. • . , - .- h 5.*•-.:-f.,-.. - ..; :1 • ‘- ... ho , 4111 . . . ._. _ It " .- ir i '.. L' ....!......„--. ii. 77..i. - - ..._ „„,...0", Pliorg. 1 , _ - , i rT il * - ... . .- ... -, 7444,4,41 1 i t. 1 _Iine° ..,i4i. ;,iti . i „„. * -1411141111 ,.. snail :4:eill - * • . ...-.^ - Estimated Costs to Replace Existing Playground Equipment incl. Install 1 Swing Set $3,100 2-5 Years $40,000 5-12 Years $65,000 Estimated Costs for Rubberized Surfacing incL Install Partial (921 SF) S28,293 Full (4,157 SF) $127,703 TOTAL COST FOR EQUIPMENT & SURFACING Partial $136,393 Full $235,803 50 ,. (N CV N N N N 00 C '- ...„- 0 ° rl ',- > > 4-1 rl ri rl .4-1 ri 5 • < 1 > VI VI III VI1 1 1 4 i 1 3 VI VI V) LA - V) V) 1./1 1.1-11 V) Llh Ln MO ..er, Z N N N N N N . . . (N N (N , N C Ni 30 Lh. Lf).' 4-4 er .--1 rl ri r4 if) Lr-) u-} Lr-j Lrc Li) ,--4 ,--i ,-, Li-) r-a 11111111111113 1 . = Zit It".4 C..1 1.)) VI V) Ln Ln Ln IN N N r--I N N Ln Ln Ln N LI-, Ii) , 1.,1 CC < CL in L" Z CI 0 N (^4 C C./ Z PI .,,.,. E LU — Ln cl. L-1 "..:1!. ._ -,,,- L... ,- •- L.. ,-.. -0 ' 2 - 0 0 0 0 0 1._ s.- s- s- s... 1... s.- s- s.... L. s.- 0 s- '6.- 8 5- 1.- 1.- 0000 © 0 Cli 4_, - 0000 0 0FilrE, 76 "iki 'r-s To 'r7; 'r-o- To- 'rTli 'c'ti ,2 -Fn. 75 0 '(7 ,,7 0 0 0 0 __, LL.1 U _ CL CL a.. „._ u._ u_ ._ u_ u_ ...,._ .._ u_ u.... LL ,,,, Li.. u_ 0_ u_ u_ u_ 0_ a_ a_ 0._ . 0 0 ° Z I- (4.) C ' LU ro CC * LA cC :E a) ,..4., I.— L-- 5 < L. * a.) Ill LI. 0) --• Cr s:( CLi ro _J U Cr, * _..Y •- -1:5 r‘, c..1 ,'l ,.._ -- 4-1 Cl) o.)._ 5 L,- ti; 0 i I.- > C •-• c _o C C ...I a) 0 •- 0_, 4-, (1.1 48-p '--r,2 a, r-> — c a., - n 2 c 0 C r o > 5 >„ li-, >. ..-, a. r.../1 C (../ a 0< _c (43 1.1 _NG (t/ (1.1 U -0 ro m '- .- — ro ro .1 cv 11) 0 u co = CI -r-o 0.3 (-) (-) ct. CD u-) I Lu LU cc 0 .0 (.9 I _I _u Z 0- C V) G < -.1 t.r) 4-n I- 0- 03 I = 0- * yj 1-1 rNi Edison 2I 377 Magnolia St. Condition:PO YesOR High Il ADA:Pase:rtial ISSUES: • Rubber surfacing needed for older units. • Steps and slides rusted and cracked. • Bucket swings and hardware damaged. • Crawl tube flange warped. At _ , , t . 4 I Y— ,. ? - ,a* . ...V M w # .. P w Estimated Costs to Replace Existing Playground Equipment incl. Install 1 Swing Set $3,100 2-5 Years S40,000 5-12 Years S65,000 Estimated Costs for Rubberized Surfacing incl. Install Partial (890 SF) $27,340 Full (4,567 SF) $140,298 TOTAL COST FOR EQUIPMENT & SURFACING Partial $135,440 Full $248,398 51 Eader 9281 Banning Ave. Condition: POOR High Use: No ADA:Partial ISSUES: • Rubber Surfacing: Needed at 2-5 unit. • Railings, steps, platforms rusted. • Tube slides cracked and vandalized. Bucket swings and hardward damaged. '. • r_ t* lamp ANIL '.',. ligrillik - wu lir. - v . r 11 dilr *11/4111t14Vti ' • ,. '. k' 'fir.. 52 0 5-12 Years S65,000 Estimated Costs for Rubberized Surfacing incl. Install Partial (890 SF) $27,340 Full (4,567 SF) $140,298 TOTAL COST FOR EQUIPMENT & SURFACING Partial $135,440 Full $248,398 51 Estimated Costs to Replace Existing Playground Equipment incl. Install 1 Swing Set $3,100 2-5 Years $40,000 5-12 Years $65,000 Estimated Costs for Rubberized Surfacing 'incl. Install Partial (953 SF) $29,276 Full (8,536 SF) $262,225 TOTAL COST FOR EQUIPMENT & SURFACING Partial $137,376 Full $370,325 53 ik - wu lir. - v . r 11 dilr *11/4111t14Vti ' • ,. '. k' 'fir.. 52 0 5-12 Years S65,000 Estimated Costs for Rubberized Surfacing incl. Install Partial (890 SF) $27,340 Full (4,567 SF) $140,298 TOTAL COST FOR EQUIPMENT & SURFACING Partial $135,440 Full $248,398 51 Bushard 9691 Warburton Drive Condition: POOR High Use: No ISSUES: • ADA: No. Need rubber surfacing. • All swing hardware need to be replaced. • Transfer station rusted/corroded. • 36" wide slide cracked. - :1 74„'.., c - . , ' ' •i, " II, .arit , , ... . ,,,,• 2 . ' ...,. . i ... . ,.... . .110 it • i ..,., 1,1 lz.„...., . .4 I, , .... ........ _ _ . . .._ 1 4 a' 4, . 1 , if 1 V ., 6! IIII al!. ,. i -- IS bt 1:::: - - ,k, ... 4 ' " 'Is ' I - at ...... .., . . ... . ..as -...-,......,,,........,,,, Estimated Costs to Replace Existing Playground Equipment incl. Install 1 Swing Set S3,100 2-5 Years S40,000 5-12 Years $65,000 Estimated Costs for Rubberized Surfacing 'incl. Install Partial (327 SF) $10,045 Full (1,928 SF) $59,228 TOTAL COST FOR EQUIPMENT & SURFACING Partial $118,145 Full $167,328 54 R EQUIPMENT & SURFACING Partial $136,393 Full $235,803 50 ,. (N CV N N N N 00 C '- ...„- 0 ° rl ',- > > 4-1 rl ri rl .4-1 ri 5 • < 1 > VI VI III VI1 1 1 4 i 1 3 VI VI V) LA - V) V) 1./1 1.1-11 V) Llh Ln MO ..er, Z N N N N N N . . . (N N (N , N C Ni 30 Lh. Lf).' 4-4 er .--1 rl ri r4 if) Lr-) u-} Lr-j Lrc Li) ,--4 ,--i ,-, Li-) r-a 11111111111113 1 . = Zit It".4 C..1 1.)) VI V) Ln Ln Ln IN N N r--I N N Ln Ln Ln N LI-, Ii) , 1.,1 CC < CL in L" Z CI 0 N (^4 C C./ Z PI .,,.,. E LU — Ln cl. L-1 "..:1!. ._ -,,,- L... ,- •- L.. ,-.. -0 ' 2 - 0 0 0 0 0 1._ s.- s- s- s... 1... s.- s- s.... L. s.- 0 s- '6.- 8 5- 1.- 1.- 0000 © 0 Cli 4_, - 0000 0 0FilrE, 76 "iki 'r-s To 'r7; 'r-o- To- 'rTli 'c'ti ,2 -Fn. 75 0 '(7 ,,7 0 0 0 0 __, LL.1 U _ CL CL a.. „._ u._ u_ ._ u_ u_ ...,._ .._ u_ u.... LL ,,,, Li.. u_ 0_ u_ u_ u_ 0_ a_ a_ 0._ . 0 0 ° Z I- (4.) C ' LU ro CC * LA cC :E a) ,..4., I.— L-- 5 < L. * a.) Ill LI. 0) --• Cr s:( CLi ro _J U Cr, * _..Y •- -1:5 r‘, c..1 ,'l ,.._ -- 4-1 Cl) o.)._ 5 L,- ti; 0 i I.- > C •-• c _o C C ...I a) 0 •- 0_, 4-, (1.1 48-p '--r,2 a, r-> — c a., - n 2 c 0 C r o > 5 >„ li-, >. ..-, a. r.../1 C (../ a 0< _c (43 1.1 _NG (t/ (1.1 U -0 ro m '- .- — ro ro .1 cv 11) 0 u co = CI -r-o 0.3 (-) (-) ct. CD u-) I Lu LU cc 0 .0 (.9 I _I _u Z 0- C V) G < -.1 t.r) 4-n I- 0- 03 I = 0- * yj 1-1 rNi Circle View 15720 Willett Lane Condition:Fair High Use:No • ISSUES: • ADA: No. Needs rubber surfacing. • Steps rusted/exposed metal. • 72" corckscrew exposed footing. ,C4ne I i 1 1 r ki,II I r I.1, I - - ,441°F "4...., .. , if,........__ .... 411 '• 1 .... , is P..---is p , i 1 I. ' per - I I! - ' a III 1 ' . . - - _ . ii, ... :„. „...:....... ,.., „-, ., .....„ ...... w -IL-- ,., .. - Estimated Costs to Replace Existing Playground Equipment incl. Install 1 Swing Set $3,100 2-5 Years $40,000 5-12 Years $65,000 Estimated Costs for Rubberized Surfacing incl. Install Partial(139 SF) $4,270 Full (1,725 SF) $52,992 TOTAL COST FOR EQUIPMENT & SURFACING Partial $112,370 Full $161,092 55 TOTAL COST FOR EQUIPMENT & SURFACING Partial $118,145 Full $167,328 54 R EQUIPMENT & SURFACING Partial $136,393 Full $235,803 50 ,. (N CV N N N N 00 C '- ...„- 0 ° rl ',- > > 4-1 rl ri rl .4-1 ri 5 • < 1 > VI VI III VI1 1 1 4 i 1 3 VI VI V) LA - V) V) 1./1 1.1-11 V) Llh Ln MO ..er, Z N N N N N N . . . (N N (N , N C Ni 30 Lh. Lf).' 4-4 er .--1 rl ri r4 if) Lr-) u-} Lr-j Lrc Li) ,--4 ,--i ,-, Li-) r-a 11111111111113 1 . = Zit It".4 C..1 1.)) VI V) Ln Ln Ln IN N N r--I N N Ln Ln Ln N LI-, Ii) , 1.,1 CC < CL in L" Z CI 0 N (^4 C C./ Z PI .,,.,. E LU — Ln cl. L-1 "..:1!. ._ -,,,- L... ,- •- L.. ,-.. -0 ' 2 - 0 0 0 0 0 1._ s.- s- s- s... 1... s.- s- s.... L. s.- 0 s- '6.- 8 5- 1.- 1.- 0000 © 0 Cli 4_, - 0000 0 0FilrE, 76 "iki 'r-s To 'r7; 'r-o- To- 'rTli 'c'ti ,2 -Fn. 75 0 '(7 ,,7 0 0 0 0 __, LL.1 U _ CL CL a.. „._ u._ u_ ._ u_ u_ ...,._ .._ u_ u.... LL ,,,, Li.. u_ 0_ u_ u_ u_ 0_ a_ a_ 0._ . 0 0 ° Z I- (4.) C ' LU ro CC * LA cC :E a) ,..4., I.— L-- 5 < L. * a.) Ill LI. 0) --• Cr s:( CLi ro _J U Cr, * _..Y •- -1:5 r‘, c..1 ,'l ,.._ -- 4-1 Cl) o.)._ 5 L,- ti; 0 i I.- > C •-• c _o C C ...I a) 0 •- 0_, 4-, (1.1 48-p '--r,2 a, r-> — c a., - n 2 c 0 C r o > 5 >„ li-, >. ..-, a. r.../1 C (../ a 0< _c (43 1.1 _NG (t/ (1.1 U -0 ro m '- .- — ro ro .1 cv 11) 0 u co = CI -r-o 0.3 (-) (-) ct. CD u-) I Lu LU cc 0 .0 (.9 I _I _u Z 0- C V) G < -.1 t.r) 4-n I- 0- 03 I = 0- * yj 1-1 rNi Drew 20252 Cape Cottage Lane Condition:Fair High Use:No ISSUES: • ADA: No. Needs rubber surfacing. • Transfer station rusted/corroded. • 36" wide slide cracked. • 360 slide exposed footing. I 43.ipt .k• _ -„wz r:41,7;. ri 5474:wla 1p tra,ft:474.-;__ ,r`• 401111* 64! _- 6T,-.1.44,,L..1;41tr.*:***,7=;KPL,44-iim _77r, '4'171 •, Estimated Costs to Replace Existing Playground Equipment incl. Install 1 Swi'ng Set $3,100 2-5 Years S40,000 5-12 Years $65,000 Estimated Costs for Rubberized Surfacing incl. Install Partial (406 SF) $12,472 Full(2,414 SF) $74,158 TOTAL COST FOR EQUIPMENT & SURFACING Partial $120,572 Full $182,258 56 5 Years $40,000 5-12 Years $65,000 Estimated Costs for Rubberized Surfacing incl. Install Partial(139 SF) $4,270 Full (1,725 SF) $52,992 TOTAL COST FOR EQUIPMENT & SURFACING Partial $112,370 Full $161,092 55 TOTAL COST FOR EQUIPMENT & SURFACING Partial $118,145 Full $167,328 54 R EQUIPMENT & SURFACING Partial $136,393 Full $235,803 50 ,. (N CV N N N N 00 C '- ...„- 0 ° rl ',- > > 4-1 rl ri rl .4-1 ri 5 • < 1 > VI VI III VI1 1 1 4 i 1 3 VI VI V) LA - V) V) 1./1 1.1-11 V) Llh Ln MO ..er, Z N N N N N N . . . (N N (N , N C Ni 30 Lh. Lf).' 4-4 er .--1 rl ri r4 if) Lr-) u-} Lr-j Lrc Li) ,--4 ,--i ,-, Li-) r-a 11111111111113 1 . = Zit It".4 C..1 1.)) VI V) Ln Ln Ln IN N N r--I N N Ln Ln Ln N LI-, Ii) , 1.,1 CC < CL in L" Z CI 0 N (^4 C C./ Z PI .,,.,. E LU — Ln cl. L-1 "..:1!. ._ -,,,- L... ,- •- L.. ,-.. -0 ' 2 - 0 0 0 0 0 1._ s.- s- s- s... 1... s.- s- s.... L. s.- 0 s- '6.- 8 5- 1.- 1.- 0000 © 0 Cli 4_, - 0000 0 0FilrE, 76 "iki 'r-s To 'r7; 'r-o- To- 'rTli 'c'ti ,2 -Fn. 75 0 '(7 ,,7 0 0 0 0 __, LL.1 U _ CL CL a.. „._ u._ u_ ._ u_ u_ ...,._ .._ u_ u.... LL ,,,, Li.. u_ 0_ u_ u_ u_ 0_ a_ a_ 0._ . 0 0 ° Z I- (4.) C ' LU ro CC * LA cC :E a) ,..4., I.— L-- 5 < L. * a.) Ill LI. 0) --• Cr s:( CLi ro _J U Cr, * _..Y •- -1:5 r‘, c..1 ,'l ,.._ -- 4-1 Cl) o.)._ 5 L,- ti; 0 i I.- > C •-• c _o C C ...I a) 0 •- 0_, 4-, (1.1 48-p '--r,2 a, r-> — c a., - n 2 c 0 C r o > 5 >„ li-, >. ..-, a. r.../1 C (../ a 0< _c (43 1.1 _NG (t/ (1.1 U -0 ro m '- .- — ro ro .1 cv 11) 0 u co = CI -r-o 0.3 (-) (-) ct. CD u-) I Lu LU cc 0 .0 (.9 I _I _u Z 0- C V) G < -.1 t.r) 4-n I- 0- 03 I = 0- * yj 1-1 rNi Glen View 6721 Glen Drive Condition:Fair High Use: No ISSUES: • ADA: No. Needs rubber surfacing. • All belt swings and hardware need to be replaced. * 48" slide missing. . . f t r:i_ _ , - ii , 1 ,,..__II I i "mow • ..,,, , i ':, :• II:i, tr..7.=11 : '... 11 i 1 , "OAP•; - , . , .._, ..mot. ‘41, am I - - - -Illk IWO .....,....o....o.. A . , ..2'." ''''' ''''' .7.:.::tj r'•': ' .34..",,,,:c. a:^,i4,,,i.:' ;:4'4'414.0'' ...'40',., '.7 ".5'!,:.*,4,*' Estimated Costs to Replace Existing Playground Equipment incl. Install 1 Swing Set $3,100 2-5 Years $40,000 5-12 Years $65,000 Estimated Costs for Rubberized Surfacing incl. Install Partial (357 SF) $10,967 Full (1,978 SF) $60,764 TOTAL COST FOR EQUIPMENT & SURFACING Partial $119,067 Full $168,864 57 l $112,370 Full $161,092 55 TOTAL COST FOR EQUIPMENT & SURFACING Partial $118,145 Full $167,328 54 R EQUIPMENT & SURFACING Partial $136,393 Full $235,803 50 ,. (N CV N N N N 00 C '- ...„- 0 ° rl ',- > > 4-1 rl ri rl .4-1 ri 5 • < 1 > VI VI III VI1 1 1 4 i 1 3 VI VI V) LA - V) V) 1./1 1.1-11 V) Llh Ln MO ..er, Z N N N N N N . . . (N N (N , N C Ni 30 Lh. Lf).' 4-4 er .--1 rl ri r4 if) Lr-) u-} Lr-j Lrc Li) ,--4 ,--i ,-, Li-) r-a 11111111111113 1 . = Zit It".4 C..1 1.)) VI V) Ln Ln Ln IN N N r--I N N Ln Ln Ln N LI-, Ii) , 1.,1 CC < CL in L" Z CI 0 N (^4 C C./ Z PI .,,.,. E LU — Ln cl. L-1 "..:1!. ._ -,,,- L... ,- •- L.. ,-.. -0 ' 2 - 0 0 0 0 0 1._ s.- s- s- s... 1... s.- s- s.... L. s.- 0 s- '6.- 8 5- 1.- 1.- 0000 © 0 Cli 4_, - 0000 0 0FilrE, 76 "iki 'r-s To 'r7; 'r-o- To- 'rTli 'c'ti ,2 -Fn. 75 0 '(7 ,,7 0 0 0 0 __, LL.1 U _ CL CL a.. „._ u._ u_ ._ u_ u_ ...,._ .._ u_ u.... LL ,,,, Li.. u_ 0_ u_ u_ u_ 0_ a_ a_ 0._ . 0 0 ° Z I- (4.) C ' LU ro CC * LA cC :E a) ,..4., I.— L-- 5 < L. * a.) Ill LI. 0) --• Cr s:( CLi ro _J U Cr, * _..Y •- -1:5 r‘, c..1 ,'l ,.._ -- 4-1 Cl) o.)._ 5 L,- ti; 0 i I.- > C •-• c _o C C ...I a) 0 •- 0_, 4-, (1.1 48-p '--r,2 a, r-> — c a., - n 2 c 0 C r o > 5 >„ li-, >. ..-, a. r.../1 C (../ a 0< _c (43 1.1 _NG (t/ (1.1 U -0 ro m '- .- — ro ro .1 cv 11) 0 u co = CI -r-o 0.3 (-) (-) ct. CD u-) I Lu LU cc 0 .0 (.9 I _I _u Z 0- C V) G < -.1 t.r) 4-n I- 0- 03 I = 0- * yj 1-1 rNi ,* 11 Haven View e 16041 Waikiki Lane Condition:Fair High Use:No ISSUES: • ADA: No. Needs rubber surfacing. glide• 48" tube slide and 36" wide slide needs to breplaced. ; ,,,r,--t77 ! "4•0i...7L-- —' . , ,...... --- , 1 .• ....1 ..----- '.. l= ' • -1'. '''''....'1 ' ' ' '1:,'::, '•,,,,,.,:1,, ,I,,,'':'' ,''-.. - -- Costs to Replace Existing EstimatedPlayground Equipments3,100 incl. Install 1 swill* g Set 2-5 Years $40,000 $65,000 5-12 Years Estimated Costs for Rubberized Surfacins6g,3in89c1. Install Partial (208 SF) Full(4,520 SF) $138,854 TOTAL COST FOR EQUIPMENT & $SURFACINGii4,489 Partial Full $246,954 58 Rubberized Surfacing incl. Install Partial (357 SF) $10,967 Full (1,978 SF) $60,764 TOTAL COST FOR EQUIPMENT & SURFACING Partial $119,067 Full $168,864 57 l $112,370 Full $161,092 55 TOTAL COST FOR EQUIPMENT & SURFACING Partial $118,145 Full $167,328 54 R EQUIPMENT & SURFACING Partial $136,393 Full $235,803 50 ,. (N CV N N N N 00 C '- ...„- 0 ° rl ',- > > 4-1 rl ri rl .4-1 ri 5 • < 1 > VI VI III VI1 1 1 4 i 1 3 VI VI V) LA - V) V) 1./1 1.1-11 V) Llh Ln MO ..er, Z N N N N N N . . . (N N (N , N C Ni 30 Lh. Lf).' 4-4 er .--1 rl ri r4 if) Lr-) u-} Lr-j Lrc Li) ,--4 ,--i ,-, Li-) r-a 11111111111113 1 . = Zit It".4 C..1 1.)) VI V) Ln Ln Ln IN N N r--I N N Ln Ln Ln N LI-, Ii) , 1.,1 CC < CL in L" Z CI 0 N (^4 C C./ Z PI .,,.,. E LU — Ln cl. L-1 "..:1!. ._ -,,,- L... ,- •- L.. ,-.. -0 ' 2 - 0 0 0 0 0 1._ s.- s- s- s... 1... s.- s- s.... L. s.- 0 s- '6.- 8 5- 1.- 1.- 0000 © 0 Cli 4_, - 0000 0 0FilrE, 76 "iki 'r-s To 'r7; 'r-o- To- 'rTli 'c'ti ,2 -Fn. 75 0 '(7 ,,7 0 0 0 0 __, LL.1 U _ CL CL a.. „._ u._ u_ ._ u_ u_ ...,._ .._ u_ u.... LL ,,,, Li.. u_ 0_ u_ u_ u_ 0_ a_ a_ 0._ . 0 0 ° Z I- (4.) C ' LU ro CC * LA cC :E a) ,..4., I.— L-- 5 < L. * a.) Ill LI. 0) --• Cr s:( CLi ro _J U Cr, * _..Y •- -1:5 r‘, c..1 ,'l ,.._ -- 4-1 Cl) o.)._ 5 L,- ti; 0 i I.- > C •-• c _o C C ...I a) 0 •- 0_, 4-, (1.1 48-p '--r,2 a, r-> — c a., - n 2 c 0 C r o > 5 >„ li-, >. ..-, a. r.../1 C (../ a 0< _c (43 1.1 _NG (t/ (1.1 U -0 ro m '- .- — ro ro .1 cv 11) 0 u co = CI -r-o 0.3 (-) (-) ct. CD u-) I Lu LU cc 0 .0 (.9 I _I _u Z 0- C V) G < -.1 t.r) 4-n I- 0- 03 I = 0- * yj 1-1 rNi Langenbeck 8721 Suncoral Drive Condition:Fair High Use: No ISSUES: ADA: No. Needs rubber surfacing. • 360 slide cracked at base. • Swings need to be replaced. • Slide pole railing is rusted. • 48" tube slide cracked. • 36" slide bracket is non compliant. ' '1 �. t. .,' t .r r " ti � e .gym r e wp u.� Estimated Costs to Replace Existing Playground Equipment incl. Install 1 Swing Set $3,100 2-5 Years $40,000 5-12 Years $65,000 Estimated Costs for Rubberized Surfacing Incl. Install Partial (300 SF) $9,216 Full(2,624 SF) $80,609 TOTAL COST FOR EQUIPMENT & SURFACING Partial $117,316 Full $188,709 59 51 LeBard 20461 Craimer Lane Condition:Fair High Use:No ISSUES: • ADA: No. Needs rubber surfacing. * 36" slide, 48" slide cracked. • Transfer stations, slide pole railing and climber rusted and corroded. r P"' 4 . i 4 ' t ftwil - __ le . 4 , .,` ' 1 ', 1..-• t ''' - ,'tit., ,,,h 7 ' ' 11 40' ........- v K . . . _ 1 ,, .. re s - - —- ---; - i v ' ••1 1 _ 1 i ;An.-""-- I 1 liOnt m ..Estimated Costs to Replace Existing Playground Equipment incl. Install 1 SNving Set $3,100 2-5 Years $40,000 5-12 Years $65,000 Estimated Costs for Rubberized Surfacing incl. Install Partial (565 SF) $17,356 Full(8,696 SF) $267,141 TOTAL COST FOR EQUIPMENT & SURFACING Partial $125,456 Frill $375,241 60 $168,864 57 l $112,370 Full $161,092 55 TOTAL COST FOR EQUIPMENT & SURFACING Partial $118,145 Full $167,328 54 R EQUIPMENT & SURFACING Partial $136,393 Full $235,803 50 ,. (N CV N N N N 00 C '- ...„- 0 ° rl ',- > > 4-1 rl ri rl .4-1 ri 5 • < 1 > VI VI III VI1 1 1 4 i 1 3 VI VI V) LA - V) V) 1./1 1.1-11 V) Llh Ln MO ..er, Z N N N N N N . . . (N N (N , N C Ni 30 Lh. Lf).' 4-4 er .--1 rl ri r4 if) Lr-) u-} Lr-j Lrc Li) ,--4 ,--i ,-, Li-) r-a 11111111111113 1 . = Zit It".4 C..1 1.)) VI V) Ln Ln Ln IN N N r--I N N Ln Ln Ln N LI-, Ii) , 1.,1 CC < CL in L" Z CI 0 N (^4 C C./ Z PI .,,.,. E LU — Ln cl. L-1 "..:1!. ._ -,,,- L... ,- •- L.. ,-.. -0 ' 2 - 0 0 0 0 0 1._ s.- s- s- s... 1... s.- s- s.... L. s.- 0 s- '6.- 8 5- 1.- 1.- 0000 © 0 Cli 4_, - 0000 0 0FilrE, 76 "iki 'r-s To 'r7; 'r-o- To- 'rTli 'c'ti ,2 -Fn. 75 0 '(7 ,,7 0 0 0 0 __, LL.1 U _ CL CL a.. „._ u._ u_ ._ u_ u_ ...,._ .._ u_ u.... LL ,,,, Li.. u_ 0_ u_ u_ u_ 0_ a_ a_ 0._ . 0 0 ° Z I- (4.) C ' LU ro CC * LA cC :E a) ,..4., I.— L-- 5 < L. * a.) Ill LI. 0) --• Cr s:( CLi ro _J U Cr, * _..Y •- -1:5 r‘, c..1 ,'l ,.._ -- 4-1 Cl) o.)._ 5 L,- ti; 0 i I.- > C •-• c _o C C ...I a) 0 •- 0_, 4-, (1.1 48-p '--r,2 a, r-> — c a., - n 2 c 0 C r o > 5 >„ li-, >. ..-, a. r.../1 C (../ a 0< _c (43 1.1 _NG (t/ (1.1 U -0 ro m '- .- — ro ro .1 cv 11) 0 u co = CI -r-o 0.3 (-) (-) ct. CD u-) I Lu LU cc 0 .0 (.9 I _I _u Z 0- C V) G < -.1 t.r) 4-n I- 0- 03 I = 0- * yj 1-1 rNi Newland East 19702 Topeka Lane Condition: Fair High Use: No ISSUES: • ADA: No. Needs rubber surfacing. • 36" slide cracked and rusted. • Transfer station rusted and corroded. a ,K I yl f-i-' M r" 111/ 1 qy +d 1.1 tilk "'�s " vas' ! �;:x•"t - , l 4 " y :a' y s 4. -4 ':.a erg : : ..,�y� :�"�: �� . : .. ...�'1, �..'' ::. em ..'..� .=Asa .:� ,�..........ax ' �• � :�+ tY�„.�.e ;#':. � i� Estimated Costs to Replace Existing Playground Equipment hid. Install l Swing Set $3,100 2-5 Years $40,000 5-12 Years $65,000 Estimated Costs for Rubberized Surfacing incL Install Partial(376 SF) $11,550 Full (6,129 SF) $188,282 TOTAL COST FOR EQUIPMENT & SURFACING Partial $119,650 Full $296,382 61 AL COST FOR EQUIPMENT & SURFACING Partial $125,456 Frill $375,241 60 $168,864 57 l $112,370 Full $161,092 55 TOTAL COST FOR EQUIPMENT & SURFACING Partial $118,145 Full $167,328 54 R EQUIPMENT & SURFACING Partial $136,393 Full $235,803 50 ,. (N CV N N N N 00 C '- ...„- 0 ° rl ',- > > 4-1 rl ri rl .4-1 ri 5 • < 1 > VI VI III VI1 1 1 4 i 1 3 VI VI V) LA - V) V) 1./1 1.1-11 V) Llh Ln MO ..er, Z N N N N N N . . . (N N (N , N C Ni 30 Lh. Lf).' 4-4 er .--1 rl ri r4 if) Lr-) u-} Lr-j Lrc Li) ,--4 ,--i ,-, Li-) r-a 11111111111113 1 . = Zit It".4 C..1 1.)) VI V) Ln Ln Ln IN N N r--I N N Ln Ln Ln N LI-, Ii) , 1.,1 CC < CL in L" Z CI 0 N (^4 C C./ Z PI .,,.,. E LU — Ln cl. L-1 "..:1!. ._ -,,,- L... ,- •- L.. ,-.. -0 ' 2 - 0 0 0 0 0 1._ s.- s- s- s... 1... s.- s- s.... L. s.- 0 s- '6.- 8 5- 1.- 1.- 0000 © 0 Cli 4_, - 0000 0 0FilrE, 76 "iki 'r-s To 'r7; 'r-o- To- 'rTli 'c'ti ,2 -Fn. 75 0 '(7 ,,7 0 0 0 0 __, LL.1 U _ CL CL a.. „._ u._ u_ ._ u_ u_ ...,._ .._ u_ u.... LL ,,,, Li.. u_ 0_ u_ u_ u_ 0_ a_ a_ 0._ . 0 0 ° Z I- (4.) C ' LU ro CC * LA cC :E a) ,..4., I.— L-- 5 < L. * a.) Ill LI. 0) --• Cr s:( CLi ro _J U Cr, * _..Y •- -1:5 r‘, c..1 ,'l ,.._ -- 4-1 Cl) o.)._ 5 L,- ti; 0 i I.- > C •-• c _o C C ...I a) 0 •- 0_, 4-, (1.1 48-p '--r,2 a, r-> — c a., - n 2 c 0 C r o > 5 >„ li-, >. ..-, a. r.../1 C (../ a 0< _c (43 1.1 _NG (t/ (1.1 U -0 ro m '- .- — ro ro .1 cv 11) 0 u co = CI -r-o 0.3 (-) (-) ct. CD u-) I Lu LU cc 0 .0 (.9 I _I _u Z 0- C V) G < -.1 t.r) 4-n I- 0- 03 I = 0- * yj 1-1 rNi Pleasant View 16650 Landau Lane Condition: Fair High Use: No ISSUES: • ADA: No. Needs rubber surfacing. • 4' oval crawl tube damaged with etching. • Beanstalk climber bent and rusted. • Tic tac toe damaged panel. • 48" and 36" slides cracked. • Transfer station rusted. t :'iy,4 ., 1t 1.,yU R e , _ AZ 46,0009 "'rig II ..0001 pates Estimated Costs to Replace Existing Playground Equipment incl. Install l Swing Set $3,100 2-5 Years S40,000 5-12 Years $65,000 Estimated Costs for Rubberized Surfacing incl. Install Partial (437 SF) $13,424 Full (7,005 SF) $215,193 TOTAL COST FOR EQUIPMENT & SURFACING Partial $121,524 Full $323,293 62 61 AL COST FOR EQUIPMENT & SURFACING Partial $125,456 Frill $375,241 60 $168,864 57 l $112,370 Full $161,092 55 TOTAL COST FOR EQUIPMENT & SURFACING Partial $118,145 Full $167,328 54 R EQUIPMENT & SURFACING Partial $136,393 Full $235,803 50 ,. (N CV N N N N 00 C '- ...„- 0 ° rl ',- > > 4-1 rl ri rl .4-1 ri 5 • < 1 > VI VI III VI1 1 1 4 i 1 3 VI VI V) LA - V) V) 1./1 1.1-11 V) Llh Ln MO ..er, Z N N N N N N . . . (N N (N , N C Ni 30 Lh. Lf).' 4-4 er .--1 rl ri r4 if) Lr-) u-} Lr-j Lrc Li) ,--4 ,--i ,-, Li-) r-a 11111111111113 1 . = Zit It".4 C..1 1.)) VI V) Ln Ln Ln IN N N r--I N N Ln Ln Ln N LI-, Ii) , 1.,1 CC < CL in L" Z CI 0 N (^4 C C./ Z PI .,,.,. E LU — Ln cl. L-1 "..:1!. ._ -,,,- L... ,- •- L.. ,-.. -0 ' 2 - 0 0 0 0 0 1._ s.- s- s- s... 1... s.- s- s.... L. s.- 0 s- '6.- 8 5- 1.- 1.- 0000 © 0 Cli 4_, - 0000 0 0FilrE, 76 "iki 'r-s To 'r7; 'r-o- To- 'rTli 'c'ti ,2 -Fn. 75 0 '(7 ,,7 0 0 0 0 __, LL.1 U _ CL CL a.. „._ u._ u_ ._ u_ u_ ...,._ .._ u_ u.... LL ,,,, Li.. u_ 0_ u_ u_ u_ 0_ a_ a_ 0._ . 0 0 ° Z I- (4.) C ' LU ro CC * LA cC :E a) ,..4., I.— L-- 5 < L. * a.) Ill LI. 0) --• Cr s:( CLi ro _J U Cr, * _..Y •- -1:5 r‘, c..1 ,'l ,.._ -- 4-1 Cl) o.)._ 5 L,- ti; 0 i I.- > C •-• c _o C C ...I a) 0 •- 0_, 4-, (1.1 48-p '--r,2 a, r-> — c a., - n 2 c 0 C r o > 5 >„ li-, >. ..-, a. r.../1 C (../ a 0< _c (43 1.1 _NG (t/ (1.1 U -0 ro m '- .- — ro ro .1 cv 11) 0 u co = CI -r-o 0.3 (-) (-) ct. CD u-) I Lu LU cc 0 .0 (.9 I _I _u Z 0- C V) G < -.1 t.r) 4-n I- 0- 03 I = 0- * yj 1-1 rNi Robinwood 5180 McFadden Avenue Condition: Fair High Use: No ISSUES: • ADA: No. Needs rubber surfacing. • Transfer station rusted and cracked. • All hardware on swing set needs to be replaced. a ` a Air . • • `a o'e. •K •. 1 %' • i';5' •# Alit 'y i.' ,./ .. � t 'tr.. fi" le yam i � A •. Air .-`�Y ' .. .:. ill •; . �.. i f . ,, ,_ 1, AlI, ... ,,,,,, ! .., „,,,,A,. . y,„ , i 1•. At i II—..1111}t!4 •t !l i g ilw • . '.5 d .mil. -- Pe 1,ipti _........, i _ .....er._, ; i :IIII ..< ......„.............5 ji .M'+-. ^'- ` ram- . ... _ ram Estimated Costs to Replace Existing Playground Equipment incl. Install 1 Swing Set S 3,100 2-5 Years S40,000 5-12 Years S65,000 Estimated Costs for Rubberized Surfacing incl. Install Partial (375 SF) S11,520 Full (5,224 SF) S 160,481 TOTAL COST FOR EQUIPMENT & SURFACING Partial $119,620 Full $268,581 63 8 54 R EQUIPMENT & SURFACING Partial $136,393 Full $235,803 50 ,. (N CV N N N N 00 C '- ...„- 0 ° rl ',- > > 4-1 rl ri rl .4-1 ri 5 • < 1 > VI VI III VI1 1 1 4 i 1 3 VI VI V) LA - V) V) 1./1 1.1-11 V) Llh Ln MO ..er, Z N N N N N N . . . (N N (N , N C Ni 30 Lh. Lf).' 4-4 er .--1 rl ri r4 if) Lr-) u-} Lr-j Lrc Li) ,--4 ,--i ,-, Li-) r-a 11111111111113 1 . = Zit It".4 C..1 1.)) VI V) Ln Ln Ln IN N N r--I N N Ln Ln Ln N LI-, Ii) , 1.,1 CC < CL in L" Z CI 0 N (^4 C C./ Z PI .,,.,. E LU — Ln cl. L-1 "..:1!. ._ -,,,- L... ,- •- L.. ,-.. -0 ' 2 - 0 0 0 0 0 1._ s.- s- s- s... 1... s.- s- s.... L. s.- 0 s- '6.- 8 5- 1.- 1.- 0000 © 0 Cli 4_, - 0000 0 0FilrE, 76 "iki 'r-s To 'r7; 'r-o- To- 'rTli 'c'ti ,2 -Fn. 75 0 '(7 ,,7 0 0 0 0 __, LL.1 U _ CL CL a.. „._ u._ u_ ._ u_ u_ ...,._ .._ u_ u.... LL ,,,, Li.. u_ 0_ u_ u_ u_ 0_ a_ a_ 0._ . 0 0 ° Z I- (4.) C ' LU ro CC * LA cC :E a) ,..4., I.— L-- 5 < L. * a.) Ill LI. 0) --• Cr s:( CLi ro _J U Cr, * _..Y •- -1:5 r‘, c..1 ,'l ,.._ -- 4-1 Cl) o.)._ 5 L,- ti; 0 i I.- > C •-• c _o C C ...I a) 0 •- 0_, 4-, (1.1 48-p '--r,2 a, r-> — c a., - n 2 c 0 C r o > 5 >„ li-, >. ..-, a. r.../1 C (../ a 0< _c (43 1.1 _NG (t/ (1.1 U -0 ro m '- .- — ro ro .1 cv 11) 0 u co = CI -r-o 0.3 (-) (-) ct. CD u-) I Lu LU cc 0 .0 (.9 I _I _u Z 0- C V) G < -.1 t.r) 4-n I- 0- 03 I = 0- * yj 1-1 rNi Schroeder 6231 Cornell Drive Condition: Fair High Use: No ISSUES: • ADA: No. Needs rubber surfacing. • Deck rusted. • 36"/48" slides and approach steps cracked. • All hardware on swing set needs to be replaced. ii:': .3,., I -ife. ..• :*,:.* , 4 ., 1 . -, . .4.... i0.- - •-••.. ::kolook 4..4 A , ' I - ' 4 .... -.. I., a , Air_ .,. , ,.:. , . III trf ' , I I . . . . .1.„, _........._,....-- 7. . ,.... t.... sumo anic PI — ...muol le . — ' • . .._ • ..=‘,-.:_ --- - -— —-•-. - . -- - . . . , ... . . Estimated Costs to Replace Existing Playground Equipment incl. Install 1 Swing Set $3,100 2-5 Years $40,000 S-12 Years $65,000 Estimated Costs for Rubberized Surfacing 'incl. Install Partial (774 SF) S23,777 Fiill (4,932 SF) $151,511 TOTAL COST FOR EQUIPMENT & SURFACING Partial $131,877 Full $259,611 64 50 ,. (N CV N N N N 00 C '- ...„- 0 ° rl ',- > > 4-1 rl ri rl .4-1 ri 5 • < 1 > VI VI III VI1 1 1 4 i 1 3 VI VI V) LA - V) V) 1./1 1.1-11 V) Llh Ln MO ..er, Z N N N N N N . . . (N N (N , N C Ni 30 Lh. Lf).' 4-4 er .--1 rl ri r4 if) Lr-) u-} Lr-j Lrc Li) ,--4 ,--i ,-, Li-) r-a 11111111111113 1 . = Zit It".4 C..1 1.)) VI V) Ln Ln Ln IN N N r--I N N Ln Ln Ln N LI-, Ii) , 1.,1 CC < CL in L" Z CI 0 N (^4 C C./ Z PI .,,.,. E LU — Ln cl. L-1 "..:1!. ._ -,,,- L... ,- •- L.. ,-.. -0 ' 2 - 0 0 0 0 0 1._ s.- s- s- s... 1... s.- s- s.... L. s.- 0 s- '6.- 8 5- 1.- 1.- 0000 © 0 Cli 4_, - 0000 0 0FilrE, 76 "iki 'r-s To 'r7; 'r-o- To- 'rTli 'c'ti ,2 -Fn. 75 0 '(7 ,,7 0 0 0 0 __, LL.1 U _ CL CL a.. „._ u._ u_ ._ u_ u_ ...,._ .._ u_ u.... LL ,,,, Li.. u_ 0_ u_ u_ u_ 0_ a_ a_ 0._ . 0 0 ° Z I- (4.) C ' LU ro CC * LA cC :E a) ,..4., I.— L-- 5 < L. * a.) Ill LI. 0) --• Cr s:( CLi ro _J U Cr, * _..Y •- -1:5 r‘, c..1 ,'l ,.._ -- 4-1 Cl) o.)._ 5 L,- ti; 0 i I.- > C •-• c _o C C ...I a) 0 •- 0_, 4-, (1.1 48-p '--r,2 a, r-> — c a., - n 2 c 0 C r o > 5 >„ li-, >. ..-, a. r.../1 C (../ a 0< _c (43 1.1 _NG (t/ (1.1 U -0 ro m '- .- — ro ro .1 cv 11) 0 u co = CI -r-o 0.3 (-) (-) ct. CD u-) I Lu LU cc 0 .0 (.9 I _I _u Z 0- C V) G < -.1 t.r) 4-n I- 0- 03 I = 0- * yj 1-1 rNi Marine View 17442 Frans Lane Condition: Good High Use:No ISSUES: • ADA: No. Needs rubber surfacing. • 36" slide, 48" slide cracked. • Transfer stations, slide pole railing and climber rusted and corroded. jit yy y, r t 1 � m r Estimated Costs to Replace Existing Playground Equipment Incl. Install 1 Swing Set $3,100 2-5 Years $40,000 5-12 Years $65,000 Estimated Costs for Rubberized Surfacing Incl. Install Partial(539 SF) $16,5 58 Full (5,516 SF) $169,451 TOTAL COST FOR EQUIPMENT & SURFACING Partial $124,658 Full $277,551 65 SF) $80,609 TOTAL COST FOR EQUIPMENT & SURFACING Partial $117,316 Full $188,709 59 51 Arevalos 10441 Shalom Drive Condition: Fair High Use:No ISSUES: • ADA: No. Needs rubber surfacing. • Transfer stations rusted and corroded. * >k- cr 11\ \: I __ , i,p �'. g .'ice �' ... ` ` . v - "^C . ... n r aB d L• iy ", -7; � "a Ei▪ry- .te ',.aw �� k- " �?, �f -; u a �Raha. F_,x `':';w 41 d. tea... a ��q 0 -= (( .-r � "3 �` � iM+ ''ddryry�,�'� i f ��x i��i,y dry" '"� s i''''-,i n 'iw�8i x '...: (i �Yy't.� t� i N ,tw xi -l`t'� ''ha'',,,, 74, '" ii �J I* y ,11 (�% SS: "$' '. e r a #.iit€- i( s. (RI Iy��I�.,r,r.3f ��i�i�(�I�i" 'is(��3�� ° ^" .., "�:xH3 s %i �"' ",_� .,x.�� .. _ •.:.�.=tit _,. .. mt .a� i� i �;����:k � �, -=��F a�. Estimated Costs to Replace Existing Playground Equipment incl. Install 1 Swing Set $3,100 2-5 Years $40,000 5-12 Years $65,000 Estimated Costs for Rubberized Surfacing M. i�cna te Install Partial (123 SF) $3,778 Full (885 5F) $27,187 TOTAL COST FOR EQUIPMENT &SURFACING Partial $111,878 Full $135,287 66 50 ,. (N CV N N N N 00 C '- ...„- 0 ° rl ',- > > 4-1 rl ri rl .4-1 ri 5 • < 1 > VI VI III VI1 1 1 4 i 1 3 VI VI V) LA - V) V) 1./1 1.1-11 V) Llh Ln MO ..er, Z N N N N N N . . . (N N (N , N C Ni 30 Lh. Lf).' 4-4 er .--1 rl ri r4 if) Lr-) u-} Lr-j Lrc Li) ,--4 ,--i ,-, Li-) r-a 11111111111113 1 . = Zit It".4 C..1 1.)) VI V) Ln Ln Ln IN N N r--I N N Ln Ln Ln N LI-, Ii) , 1.,1 CC < CL in L" Z CI 0 N (^4 C C./ Z PI .,,.,. E LU — Ln cl. L-1 "..:1!. ._ -,,,- L... ,- •- L.. ,-.. -0 ' 2 - 0 0 0 0 0 1._ s.- s- s- s... 1... s.- s- s.... L. s.- 0 s- '6.- 8 5- 1.- 1.- 0000 © 0 Cli 4_, - 0000 0 0FilrE, 76 "iki 'r-s To 'r7; 'r-o- To- 'rTli 'c'ti ,2 -Fn. 75 0 '(7 ,,7 0 0 0 0 __, LL.1 U _ CL CL a.. „._ u._ u_ ._ u_ u_ ...,._ .._ u_ u.... LL ,,,, Li.. u_ 0_ u_ u_ u_ 0_ a_ a_ 0._ . 0 0 ° Z I- (4.) C ' LU ro CC * LA cC :E a) ,..4., I.— L-- 5 < L. * a.) Ill LI. 0) --• Cr s:( CLi ro _J U Cr, * _..Y •- -1:5 r‘, c..1 ,'l ,.._ -- 4-1 Cl) o.)._ 5 L,- ti; 0 i I.- > C •-• c _o C C ...I a) 0 •- 0_, 4-, (1.1 48-p '--r,2 a, r-> — c a., - n 2 c 0 C r o > 5 >„ li-, >. ..-, a. r.../1 C (../ a 0< _c (43 1.1 _NG (t/ (1.1 U -0 ro m '- .- — ro ro .1 cv 11) 0 u co = CI -r-o 0.3 (-) (-) ct. CD u-) I Lu LU cc 0 .0 (.9 I _I _u Z 0- C V) G < -.1 t.r) 4-n I- 0- 03 I = 0- * yj 1-1 rNi Lake View 17461 Condition:Zeider Fair High Use: :No ADA: Partial ISSUES: • Rubber Surfacing: Needed at 5-12 unit. • 36" and 48" slides cracked/damaged. • Transfer station and stair rig rusted. �g4 '-: 1*-152t.' ' ' ' - 4 E', ,:,, Ilf:,!,_ —.--,,,,,J 4i.... .4, 3 -- ,..4,te.i.,,,,. -,-,"Fr 4!!,,,,,- ::: _ E ' i ¢ s S. `fir r Estimated Costs to Replace Existing Playground Equipment incl. Install 1 Swing Set $3,100 2-5 Years $40,000 5-12 Years 565,000 Estimated Costs for Rubberized Surfacing Incl. Install Partial {S16 SF) $15,851 Full {7,786 SF) $239,203 TOTAL COST FOR EQUIPMENT& SPACING Partial $12 3,951 Full $347,303 67 mt .a� i� i �;����:k � �, -=��F a�. Estimated Costs to Replace Existing Playground Equipment incl. Install 1 Swing Set $3,100 2-5 Years $40,000 5-12 Years $65,000 Estimated Costs for Rubberized Surfacing M. i�cna te Install Partial (123 SF) $3,778 Full (885 5F) $27,187 TOTAL COST FOR EQUIPMENT &SURFACING Partial $111,878 Full $135,287 66 50 ,. (N CV N N N N 00 C '- ...„- 0 ° rl ',- > > 4-1 rl ri rl .4-1 ri 5 • < 1 > VI VI III VI1 1 1 4 i 1 3 VI VI V) LA - V) V) 1./1 1.1-11 V) Llh Ln MO ..er, Z N N N N N N . . . (N N (N , N C Ni 30 Lh. Lf).' 4-4 er .--1 rl ri r4 if) Lr-) u-} Lr-j Lrc Li) ,--4 ,--i ,-, Li-) r-a 11111111111113 1 . = Zit It".4 C..1 1.)) VI V) Ln Ln Ln IN N N r--I N N Ln Ln Ln N LI-, Ii) , 1.,1 CC < CL in L" Z CI 0 N (^4 C C./ Z PI .,,.,. E LU — Ln cl. L-1 "..:1!. ._ -,,,- L... ,- •- L.. ,-.. -0 ' 2 - 0 0 0 0 0 1._ s.- s- s- s... 1... s.- s- s.... L. s.- 0 s- '6.- 8 5- 1.- 1.- 0000 © 0 Cli 4_, - 0000 0 0FilrE, 76 "iki 'r-s To 'r7; 'r-o- To- 'rTli 'c'ti ,2 -Fn. 75 0 '(7 ,,7 0 0 0 0 __, LL.1 U _ CL CL a.. „._ u._ u_ ._ u_ u_ ...,._ .._ u_ u.... LL ,,,, Li.. u_ 0_ u_ u_ u_ 0_ a_ a_ 0._ . 0 0 ° Z I- (4.) C ' LU ro CC * LA cC :E a) ,..4., I.— L-- 5 < L. * a.) Ill LI. 0) --• Cr s:( CLi ro _J U Cr, * _..Y •- -1:5 r‘, c..1 ,'l ,.._ -- 4-1 Cl) o.)._ 5 L,- ti; 0 i I.- > C •-• c _o C C ...I a) 0 •- 0_, 4-, (1.1 48-p '--r,2 a, r-> — c a., - n 2 c 0 C r o > 5 >„ li-, >. ..-, a. r.../1 C (../ a 0< _c (43 1.1 _NG (t/ (1.1 U -0 ro m '- .- — ro ro .1 cv 11) 0 u co = CI -r-o 0.3 (-) (-) ct. CD u-) I Lu LU cc 0 .0 (.9 I _I _u Z 0- C V) G < -.1 t.r) 4-n I- 0- 03 I = 0- * yj 1-1 rNi Sun View 16192 Sher Lane Condition: Poor High Use: No ADA: Partial ISSUES: • Rubber Surfacing: Needed at 5-12 unit. • 36" and 48" slides burned, cracked and damaged. • Steps and surfaces are worn, chipped and etched. • Approach steps rusted. , . - : . ; • _� - - I/ 1 r ww J, - up Estimated Costs to Replace Existing Playground Equipment incl. Install 1 Swing Set S 3,100 2-5 Years S40,000 5-12 Years $65,000 Estimated Costs for Rubberized Surfacing incl. Install Partial (400 SF) S 12,288 Full (2,295 SF) $70,502 TOTAL COST FOR EQUIPMENT & SURFACING Partial $120,388 Full $178,602 68 03 67 mt .a� i� i �;����:k � �, -=��F a�. Estimated Costs to Replace Existing Playground Equipment incl. Install 1 Swing Set $3,100 2-5 Years $40,000 5-12 Years $65,000 Estimated Costs for Rubberized Surfacing M. i�cna te Install Partial (123 SF) $3,778 Full (885 5F) $27,187 TOTAL COST FOR EQUIPMENT &SURFACING Partial $111,878 Full $135,287 66 50 ,. (N CV N N N N 00 C '- ...„- 0 ° rl ',- > > 4-1 rl ri rl .4-1 ri 5 • < 1 > VI VI III VI1 1 1 4 i 1 3 VI VI V) LA - V) V) 1./1 1.1-11 V) Llh Ln MO ..er, Z N N N N N N . . . (N N (N , N C Ni 30 Lh. Lf).' 4-4 er .--1 rl ri r4 if) Lr-) u-} Lr-j Lrc Li) ,--4 ,--i ,-, Li-) r-a 11111111111113 1 . = Zit It".4 C..1 1.)) VI V) Ln Ln Ln IN N N r--I N N Ln Ln Ln N LI-, Ii) , 1.,1 CC < CL in L" Z CI 0 N (^4 C C./ Z PI .,,.,. E LU — Ln cl. L-1 "..:1!. ._ -,,,- L... ,- •- L.. ,-.. -0 ' 2 - 0 0 0 0 0 1._ s.- s- s- s... 1... s.- s- s.... L. s.- 0 s- '6.- 8 5- 1.- 1.- 0000 © 0 Cli 4_, - 0000 0 0FilrE, 76 "iki 'r-s To 'r7; 'r-o- To- 'rTli 'c'ti ,2 -Fn. 75 0 '(7 ,,7 0 0 0 0 __, LL.1 U _ CL CL a.. „._ u._ u_ ._ u_ u_ ...,._ .._ u_ u.... LL ,,,, Li.. u_ 0_ u_ u_ u_ 0_ a_ a_ 0._ . 0 0 ° Z I- (4.) C ' LU ro CC * LA cC :E a) ,..4., I.— L-- 5 < L. * a.) Ill LI. 0) --• Cr s:( CLi ro _J U Cr, * _..Y •- -1:5 r‘, c..1 ,'l ,.._ -- 4-1 Cl) o.)._ 5 L,- ti; 0 i I.- > C •-• c _o C C ...I a) 0 •- 0_, 4-, (1.1 48-p '--r,2 a, r-> — c a., - n 2 c 0 C r o > 5 >„ li-, >. ..-, a. r.../1 C (../ a 0< _c (43 1.1 _NG (t/ (1.1 U -0 ro m '- .- — ro ro .1 cv 11) 0 u co = CI -r-o 0.3 (-) (-) ct. CD u-) I Lu LU cc 0 .0 (.9 I _I _u Z 0- C V) G < -.1 t.r) 4-n I- 0- 03 I = 0- * yj 1-1 rNi Seely 8711 Surfcrest Drive Condition:Fair High Use:No AD A.Partial ISSUES: • Rubber Surfacing: Needed at 2-5 unit. 5 12 needs patching. • Railing rusted. • 48" slide cracked. , j �. a �J� q 3`,r 1'd �`,, '.fig " f p e ri ° ,C a w _.4 ,�-t ��� .. .fit a .- Yg t ` �^ Estimated Costs to Replace Existing Playground Equipment incl. Install 1 Swing Set S 3,100 2-5 Years $40,000 5-12 Years $65,000 Estimated Costs for Rubberized Surfacing incl. Install Partial (542 SF} $16,650 Full {4,587 SF} $140,912 TOTAL COST FOR EQUIPMENT & SURFACING Partial $124,750 Full $249,412 69 88,709 59 51 Talbert 19222 Magnolia Street Condition:Fair High Use: No ADA: Partial ISSUES: • Rubber Surfacing: Needed for combo unit. • 48" tube slide cracked. • 36" steps, pipe wall barriers and transfer stations rusted. / e*. N.- . . , tk? , 14144 *.- "‘"`"a" mak ipmulmmomommionimmisi Estimated Costs to Replace Existing Playground Equipment incl. Install 1 Swing Set $3,100 2-5 Years $40,000 5-12 Years $65,000 Estimated Costs for Rubberized Surfacing incl. Install Partial (587 SF) $18,032 Full (5,121 SF) $157,317 TOTAL COST FOR EQUIPMENT & SURFACING Partial $126,132 Full $265,417 70 69 88,709 59 51 Perry 8152 Deauville Drive Condition:Fair High Use:No ADA:Partial ISSUES: • Rubber Surfacing: Needed for swings. a Transfer station rusted and broken coating. • 36" and 48" slides cracked and damaged, J-- '. - - .4", :r., N. / 14, a Estimated Costs to Replace Existing Playground Equipment ind. Install 1 Swing Set $3,100 2-5 Years $40,000 5-12 Years $65,000 Estimated Costs for Rubberized Surfacing Md. Install Partial: (958 SF) $29,429 Full (6,426 SF) $197,406 TOTAL COS1 FOR EQUIPMENT & SURFACING Partial $13 7,529 Full $305,506 71 al $126,132 Full $265,417 70 69 88,709 59 51 Booster 16861 Baruna Lane Condition:POOR High Use:No ADA: Yes ISSUES: • Rubber Surfacing: Cracked and uneven from tree roots. • Transfer station and chain climber rusted and broken coating. • 36" and 60" slides cracked and damaged. • Hardware (nuts and bolts) rusted and corroded. ' , • 4, -• - . 141, - r . . met ip it04 ' . E . it,4 . , 167 , 40.,k 17-4 .• A a ;-, Estimated Costs to Replace Existing Playground Equipment incl. Install 1 Swing Set $3,100 2-5 Years $40,000 5-12 Years $65,000 Estimated Costs for Rubberized Surfacing incl. Install Partial(1,022 SF) $31,395 Full (2,343 SF) $71,976 TOTAL COST FOR EQUIPMENT & SURFACING Partial $139,495 Full $180,076 72 $65,000 Estimated Costs for Rubberized Surfacing M. i�cna te Install Partial (123 SF) $3,778 Full (885 5F) $27,187 TOTAL COST FOR EQUIPMENT &SURFACING Partial $111,878 Full $135,287 66 50 ,. (N CV N N N N 00 C '- ...„- 0 ° rl ',- > > 4-1 rl ri rl .4-1 ri 5 • < 1 > VI VI III VI1 1 1 4 i 1 3 VI VI V) LA - V) V) 1./1 1.1-11 V) Llh Ln MO ..er, Z N N N N N N . . . (N N (N , N C Ni 30 Lh. Lf).' 4-4 er .--1 rl ri r4 if) Lr-) u-} Lr-j Lrc Li) ,--4 ,--i ,-, Li-) r-a 11111111111113 1 . = Zit It".4 C..1 1.)) VI V) Ln Ln Ln IN N N r--I N N Ln Ln Ln N LI-, Ii) , 1.,1 CC < CL in L" Z CI 0 N (^4 C C./ Z PI .,,.,. E LU — Ln cl. L-1 "..:1!. ._ -,,,- L... ,- •- L.. ,-.. -0 ' 2 - 0 0 0 0 0 1._ s.- s- s- s... 1... s.- s- s.... L. s.- 0 s- '6.- 8 5- 1.- 1.- 0000 © 0 Cli 4_, - 0000 0 0FilrE, 76 "iki 'r-s To 'r7; 'r-o- To- 'rTli 'c'ti ,2 -Fn. 75 0 '(7 ,,7 0 0 0 0 __, LL.1 U _ CL CL a.. „._ u._ u_ ._ u_ u_ ...,._ .._ u_ u.... LL ,,,, Li.. u_ 0_ u_ u_ u_ 0_ a_ a_ 0._ . 0 0 ° Z I- (4.) C ' LU ro CC * LA cC :E a) ,..4., I.— L-- 5 < L. * a.) Ill LI. 0) --• Cr s:( CLi ro _J U Cr, * _..Y •- -1:5 r‘, c..1 ,'l ,.._ -- 4-1 Cl) o.)._ 5 L,- ti; 0 i I.- > C •-• c _o C C ...I a) 0 •- 0_, 4-, (1.1 48-p '--r,2 a, r-> — c a., - n 2 c 0 C r o > 5 >„ li-, >. ..-, a. r.../1 C (../ a 0< _c (43 1.1 _NG (t/ (1.1 U -0 ro m '- .- — ro ro .1 cv 11) 0 u co = CI -r-o 0.3 (-) (-) ct. CD u-) I Lu LU cc 0 .0 (.9 I _I _u Z 0- C V) G < -.1 t.r) 4-n I- 0- 03 I = 0- * yj 1-1 rNi HCP Picnic Shelters 18000 Goldenwest St. Condition:POOR High Use: Yes ADA: Yes ISSUES: • Leaf climber chipped.• Platform, hand rails transfer station, approach step, barrier railings rusted. • 9', 36" and 48" slides rusted. ., .4,,,, IL, ,,,,,, ,,,, ,,,.,4 44, .. .. 4.:.2. %.. = - .i. ., :.1g ' . l'' .. ',. ,Sik. P, •-.-1 • I .... ' 41,f- : *. ' ,V10...• - - . * ... . . . _.„.. ..... isoiL • - ett..... -!.- , -, .. ! 1 - .., ........ qy I ik 1111PRI h. .411, NI _ _ .• , • b. . . ip 1,---,i, - :,. - Arti. - AZ, 4' OrkedItiv it! IlL 1 T 'A- .._ . . aliallithill Estimated Costs to Replace Existing Playground Equipment inclAnstall 1 Swing Set $3,100 2-5 Years $40,000 S-12 Years $65,000 Estimated Costs for Rubberized Surfacing incl.:Install Partial (536 SF) $16,465 Full (3,753 SF) $115,292 TOTAL COST FOR EQUIPMENT & SURFACING Partial $124,565 Full $223,392 73 111,878 Full $135,287 66 50 ,. (N CV N N N N 00 C '- ...„- 0 ° rl ',- > > 4-1 rl ri rl .4-1 ri 5 • < 1 > VI VI III VI1 1 1 4 i 1 3 VI VI V) LA - V) V) 1./1 1.1-11 V) Llh Ln MO ..er, Z N N N N N N . . . (N N (N , N C Ni 30 Lh. Lf).' 4-4 er .--1 rl ri r4 if) Lr-) u-} Lr-j Lrc Li) ,--4 ,--i ,-, Li-) r-a 11111111111113 1 . = Zit It".4 C..1 1.)) VI V) Ln Ln Ln IN N N r--I N N Ln Ln Ln N LI-, Ii) , 1.,1 CC < CL in L" Z CI 0 N (^4 C C./ Z PI .,,.,. E LU — Ln cl. L-1 "..:1!. ._ -,,,- L... ,- •- L.. ,-.. -0 ' 2 - 0 0 0 0 0 1._ s.- s- s- s... 1... s.- s- s.... L. s.- 0 s- '6.- 8 5- 1.- 1.- 0000 © 0 Cli 4_, - 0000 0 0FilrE, 76 "iki 'r-s To 'r7; 'r-o- To- 'rTli 'c'ti ,2 -Fn. 75 0 '(7 ,,7 0 0 0 0 __, LL.1 U _ CL CL a.. „._ u._ u_ ._ u_ u_ ...,._ .._ u_ u.... LL ,,,, Li.. u_ 0_ u_ u_ u_ 0_ a_ a_ 0._ . 0 0 ° Z I- (4.) C ' LU ro CC * LA cC :E a) ,..4., I.— L-- 5 < L. * a.) Ill LI. 0) --• Cr s:( CLi ro _J U Cr, * _..Y •- -1:5 r‘, c..1 ,'l ,.._ -- 4-1 Cl) o.)._ 5 L,- ti; 0 i I.- > C •-• c _o C C ...I a) 0 •- 0_, 4-, (1.1 48-p '--r,2 a, r-> — c a., - n 2 c 0 C r o > 5 >„ li-, >. ..-, a. r.../1 C (../ a 0< _c (43 1.1 _NG (t/ (1.1 U -0 ro m '- .- — ro ro .1 cv 11) 0 u co = CI -r-o 0.3 (-) (-) ct. CD u-) I Lu LU cc 0 .0 (.9 I _I _u Z 0- C V) G < -.1 t.r) 4-n I- 0- 03 I = 0- * yj 1-1 rNi HCP Slater 18000 Goldenwest St. Condition: POOR High Use: Yes ADA: Yes ISSUES: • Steps, 48" and double slides cracked. • Stair railing, transfer station and approach steps rusted. • „iota kl',1/0111' ; • k • ft " . I ."IV Nov, it .. • _-- - 4,1 Estimated Costs to Replace Existing Playground Equipment incl. Install 1 Swing Set $3,100 2-5 Years $40,000 5-12 Years $65,000 Estimated Costs for Rubberized Surfacing incl. Install Partial (839 SF) $25,774 Full (3,744 SF) $115,015 TOTAL COST FOR EQUIPMENT & SURFACING Partial $133,874 Full $223,115 74 59 51 Pattinson 6200 Palm Avenue Condition:POOR High Use: Yes ADA: Yes ISSUES: • Rubber Surfacing: Needs patching throughout • Platforms, 36" deck, chains and attachment points rusted. • Plastic steps needs to be replaced. • Large tube slide cracked. inr-- IR 1 ' -- - ,, . , _vets, - _ I -111.W" i .-f,„ , • 1 '' . —- . I .• — ; i X I fa --- - — / - . 1 — i A , 1.-- i 1 I 1 1 tc7'r--7 a , .. ' ''.4* +•' , .---...- i. .--- • Estimated Costs to Replace Existing Playground Equipment incl. Install 1 Swing Set $3,100 2-5 Years $40,000 5-12 Years $65,000 Estimated Costs for Rubberized Surfacing incl. Install Partial N/A Full (6,432 SF) $197,591 TOTAL COST FOR EQUIPMENT & SURFACING Partial N/A Full $305,691 75 al $124,565 Full $223,392 73 111,878 Full $135,287 66 50 ,. (N CV N N N N 00 C '- ...„- 0 ° rl ',- > > 4-1 rl ri rl .4-1 ri 5 • < 1 > VI VI III VI1 1 1 4 i 1 3 VI VI V) LA - V) V) 1./1 1.1-11 V) Llh Ln MO ..er, Z N N N N N N . . . (N N (N , N C Ni 30 Lh. Lf).' 4-4 er .--1 rl ri r4 if) Lr-) u-} Lr-j Lrc Li) ,--4 ,--i ,-, Li-) r-a 11111111111113 1 . = Zit It".4 C..1 1.)) VI V) Ln Ln Ln IN N N r--I N N Ln Ln Ln N LI-, Ii) , 1.,1 CC < CL in L" Z CI 0 N (^4 C C./ Z PI .,,.,. E LU — Ln cl. L-1 "..:1!. ._ -,,,- L... ,- •- L.. ,-.. -0 ' 2 - 0 0 0 0 0 1._ s.- s- s- s... 1... s.- s- s.... L. s.- 0 s- '6.- 8 5- 1.- 1.- 0000 © 0 Cli 4_, - 0000 0 0FilrE, 76 "iki 'r-s To 'r7; 'r-o- To- 'rTli 'c'ti ,2 -Fn. 75 0 '(7 ,,7 0 0 0 0 __, LL.1 U _ CL CL a.. „._ u._ u_ ._ u_ u_ ...,._ .._ u_ u.... LL ,,,, Li.. u_ 0_ u_ u_ u_ 0_ a_ a_ 0._ . 0 0 ° Z I- (4.) C ' LU ro CC * LA cC :E a) ,..4., I.— L-- 5 < L. * a.) Ill LI. 0) --• Cr s:( CLi ro _J U Cr, * _..Y •- -1:5 r‘, c..1 ,'l ,.._ -- 4-1 Cl) o.)._ 5 L,- ti; 0 i I.- > C •-• c _o C C ...I a) 0 •- 0_, 4-, (1.1 48-p '--r,2 a, r-> — c a., - n 2 c 0 C r o > 5 >„ li-, >. ..-, a. r.../1 C (../ a 0< _c (43 1.1 _NG (t/ (1.1 U -0 ro m '- .- — ro ro .1 cv 11) 0 u co = CI -r-o 0.3 (-) (-) ct. CD u-) I Lu LU cc 0 .0 (.9 I _I _u Z 0- C V) G < -.1 t.r) 4-n I- 0- 03 I = 0- * yj 1-1 rNi ATTACHMENT #2 18000 Goldenwest St. Condition: POOR High Use: Yes ADA: Yes ISSUES: • Steps, 48" and double slides cracked. • Stair railing, transfer station and approach steps rusted. • „iota kl',1/0111' ; • k • ft " . I ."IV Nov, it .. • _-- - 4,1 Estimated Costs to Replace Existing Playground Equipment incl. Install 1 Swing Set $3,100 2-5 Years $40,000 5-12 Years $65,000 Estimated Costs for Rubberized Surfacing incl. Install Partial (839 SF) $25,774 Full (3,744 SF) $115,015 TOTAL COST FOR EQUIPMENT & SURFACING Partial $133,874 Full $223,115 74 59 51 AMENDED PARK PLAYGROUND&EQUIPMENT REPLACEMENT PRIORITY LIST PARK CONDITION NON ADA ADA MISSING PARTS 1 Oak View* Poor - 2-5,5-12,swings Slated for removal 2 Seabridge* Poor - Swings All play units removed 3 Tarbox Damaged&removed Entire play unit removed 4 HCP Lower Lake* Poor - Swings All play units removed 5 Edison*' Poor 2-5,5-12,swings - Swing seats 6 Eader' Poor 2-5,swings 5-12 Large swing seats 7 Bushard Fair 5-12,swings - 8 Circle View Fair 5-12 - 9 Drew' Fair 5-12,swings - 10 Glen View Fair 5-12,swings - 11 Haven View Fair 5-12 - 12 Langenbeck Fair 5-12,swings - 13 LeBard Fair 2-5,5-12,swings - Swing seats 14 Newland East Fair 2-5,5-12,swings - Swing seats 15 Pleasant View Fair 2-5,5-12,swings - 16 Robinwood Fair 2-5,5-12,swings - 17 Schroeder' Fair 2-5,5-12,swings - 18 Marine View2 Good 2-5,5-12,swings - 19 Arevalos Fair 5-12 Swings 20 Lake View' Fair 5-12 2-5 Entire swing unit 21 Sun View Poor(5-12) 5-12 2-5 22 Seely Fair 2-5,swings 5-12 23 Talbert' Fair 5-12,swings 2-5 24 Perry Fair Swings 2-5,5-12 25 Booster Poor - 5-12,swings 26 HCP Picnic Shelters* Poor 5-12,swings 2-5 27 HCP Slater* Poor - 2-5,5-12,swings 28 Pattinson* Poor(5-12) - 5-12 *HIGH-USE PARK EMPTY PLAY AREA 1.Empty Node Within Tot Lot 2.Separate Play Area-No Equipment ./1 1.1-11 V) Llh Ln MO ..er, Z N N N N N N . . . (N N (N , N C Ni 30 Lh. Lf).' 4-4 er .--1 rl ri r4 if) Lr-) u-} Lr-j Lrc Li) ,--4 ,--i ,-, Li-) r-a 11111111111113 1 . = Zit It".4 C..1 1.)) VI V) Ln Ln Ln IN N N r--I N N Ln Ln Ln N LI-, Ii) , 1.,1 CC < CL in L" Z CI 0 N (^4 C C./ Z PI .,,.,. E LU — Ln cl. L-1 "..:1!. ._ -,,,- L... ,- •- L.. ,-.. -0 ' 2 - 0 0 0 0 0 1._ s.- s- s- s... 1... s.- s- s.... L. s.- 0 s- '6.- 8 5- 1.- 1.- 0000 © 0 Cli 4_, - 0000 0 0FilrE, 76 "iki 'r-s To 'r7; 'r-o- To- 'rTli 'c'ti ,2 -Fn. 75 0 '(7 ,,7 0 0 0 0 __, LL.1 U _ CL CL a.. „._ u._ u_ ._ u_ u_ ...,._ .._ u_ u.... LL ,,,, Li.. u_ 0_ u_ u_ u_ 0_ a_ a_ 0._ . 0 0 ° Z I- (4.) C ' LU ro CC * LA cC :E a) ,..4., I.— L-- 5 < L. * a.) Ill LI. 0) --• Cr s:( CLi ro _J U Cr, * _..Y •- -1:5 r‘, c..1 ,'l ,.._ -- 4-1 Cl) o.)._ 5 L,- ti; 0 i I.- > C •-• c _o C C ...I a) 0 •- 0_, 4-, (1.1 48-p '--r,2 a, r-> — c a., - n 2 c 0 C r o > 5 >„ li-, >. ..-, a. r.../1 C (../ a 0< _c (43 1.1 _NG (t/ (1.1 U -0 ro m '- .- — ro ro .1 cv 11) 0 u co = CI -r-o 0.3 (-) (-) ct. CD u-) I Lu LU cc 0 .0 (.9 I _I _u Z 0- C V) G < -.1 t.r) 4-n I- 0- 03 I = 0- * yj 1-1 rNi