HomeMy WebLinkAbout1945-06-08r,
L-A
M I N U T E S
Council Chamber, City Hall,
Huntington Beach, California
Friday, June 9, 1945
The regular meeting of the Huntington Beach Planning
Commission was called to order at 7:30 P.M. by President
Langenbeck.
Members present: Langenbeck, Overacker, Overmyer, Shaw,
Davis, Furr, Kaufman and Consulting
Engineer Parks.
Members absent: Bristol and Hudson.
Visitors: F. W. Spencer, Engineer of Planning and
Development, Pacific Electric Railway
Company, Los Angeles.
Minutes Minutes for the month of May were read and approved.
President Langenbeck asked Mr. Spencer if he believed
Mr. Spenceffhe Pacific Electric had in contemplation of making any
P.E. changes in Pacific Electric lines running into Huntington
Beach.. Mr. Spencer said that he did not know of any changes
and believed that there would be none in the near future.
Engineer Overmyer asked Mr. Spencer if there is any
liklihood of abandoning the Ocean Avenue line and entering
by 23rd Street and the Pacific Electric -Southern Pacific
lines. Mr. Spencer said that owning to financing conditions
such a plan is not possible though a similar arrangement had
from time to time been discussed. Also the matter of cutting
off at Seal Beach and coming over the Southern Pacific lines
had been mentioned.
Industrial Mr. Spencer asked that a copy of the proposed zoning
zoning. map, especially the one having to do with industrial zoning,
be sent him as soon as prepared.
Discussion on the proposed area to be zoned in the
Areas downtown district, including a portion of property on the
to be east side, was had. The proposed business district was
zoned increased somewhat, also a portion of -the single family
district was changed to read two families.
New map Engineer Parks stated that he would prepare a new map
to be ready for next meeting of the Commission.
Meeting adjourned at 9:40 P.M.
C. R. Furr, Secretary