HomeMy WebLinkAbout1965-06-2911 1 - MINUTES'
OF THE
HUNTINGTON.-BEACH"PLANNING',COMMISSION
Fout"Wihds:,Restaurant
Huntingtori=Beacb,:,California
TOTE DAY, -JUNE 29 3. -1965.', ADJOURNED- MEETING, =PTUDY.' SESSION
-,COMMISSIONERS -PRESENT: "''.Crabb Lawson " BAtiil,,_;Kaufma,n, ',Worthy,
T L-Atkin.
COMMISSIONERS ABSENT: .-,:Miller.
DISCUSSION- -' Main: 'Street ;to'.. Beach -:Boulevard ;,. 70wnership Study
The :Secretary -discussed a map
' y
-,,pertaining -to,, a,-propos6d"-.land,�,swaoy,--�etween: the Huntington Beach
that-'th is-; item,,, ,was; before the
It,.,was1,n Company; and ;the -,,,City, oted
,City:,Council--and that�,anl, 'appraisetf,-had- been hired to -establish
.,fair ,:market value .of; the , property. 'The --Secretary,. explained that
tbis'_,item,- was;,,,on- the, -agenda-,,t6�lbring-:the,; Commission, up- to' date
,,on -what ,was -,being 'proposed.
j_-Tbe', Secretary presented the
"Off i-street Parking" Study"-,,wbi-cb,,;was,,prepared by.'tbe Staff.
,'-..After, dlengtby�_.discussion
,-.regarding -landscaping -reqUirement.s.11.1t, -was .decided to. have the
Staff perform further, st.tidies,,and.report back to,'tbe Commission.
DI-acuskON. Huntington, Beef cb'fteeway .Route Study
The :Secretary :explained the
study and -told, the: fCommission -tbat,::this iwas - on itbeir,,agenda for
inf okmation ; only.
.kLDp`yleMlller Administrator,
--stated_!tbat, the; Higbw4y,",Commiggiori ; bAd-. proposed, another, , study of
tbe_C6ast,-` Freeway: alignment
:7be-Secretary pointed out that
.�if.-tbe,freeway alignment. d.s.:�recommended by,tbe4Director of Public
Works is �, adopted,; the,,,Master` Plan- of: Land:,Use,."sbould,be reevaluated.
The'. ,Chairman., suggested, tbat-sucb a,,; study -should- ,be, prepared once a
,route -is adopted by the Highway -,,.Commission.
DISCUSSION - Master Plan Study .of_.,tbe,Warner. Avenue-- Algonquin
DISCUSS- ,
Street Vicinity
-
6/29/65
history of the events that have taken place in this area and the
reason for reconsidering the plan. Mr. Harlow reviewed various
maps of the area showing zoning, existing land use, Master Plan
of Land Use and two proposals entitled "Al' and "B",
After considerable discussion
of the proposals, it was the consensus,of the Commission to set
Proposal "A" for a public hearing.
A MOTION WAS MADE BY CRABB AND
SECONDED BY BAZIL TO SET.PROPOSAL "A"' FOR PUBLIC HEARING.
ROLL CALL VOTE:
AYES: Crabb,,Lawsdn, Bazil, Kaufman, Worthy, Larkin,
NOES: None,
ABSENT: Miller,
THE MOTION CARRIED.
DISCUSSION - Capital Improvements Program
The Secretary summarized a
report on the Capitol Improvements Program and explained that
the totals.did not include the. Water or Lifeguard Departments,
Discussion followed regarding
bond proposals. It was the consensus of the Commission that a
study session should be held when more imformation is available
and after the Capital Improvements Program is put into final form,
MISCELLANEOUS:
Sam, Furgeson, Asst. Director of
Building and Safety, informed the Commission that the Board of Appeals.,
had determined that removable storm windows not exceeding 24" in
width could be installed around a patio and not interfere with
requirements for light and ventelation6 He stated that the material
mu9t be noncombustable and that such an enclosure would provide
for a more usable patio, He pointed out that this provision was
in conflict with the present City requirements for patio enclosures.
After discussion by the Commission
it wad decided that a change in the ordinance might be in order and
suggested that the Building Department submit a proposal for their
consideration„
THERE BEING NO FURTHER BUSINESS,
-2- 6/29/65
A MOTION WAS MADE BY BAZIL'AND SECONDED BY CRABB TO ADJOURN,
d,
4�2,4-1 11,6�
K. A. Reynolds
Secretary
Henry Kaufman
Chairman
-3-
6/29/65