HomeMy WebLinkAbout1975-05-14MINUTES
HUNTINGTON BEACH. BOARD OF ZONING ADJUSTMENTS
CIVIC CENTER
2000 MAIN STREET
BASEMENT, ROOM B-8
HUNTINGTON BEACH, CALIFORNIA
WEDNESDAY, MAY 14, 1975, 1:15 P.M.
BOARD MEMBERS: John Cope
Bruce Crosby
Chuck Gerarden
CITY STAFF Don Moore,
PRESENT: Fire Department
MINUTES: ON MOTION BY GERARDEN AND SECOND BY COPE, MINUTES OF
THE APRIL 23, 1975 MEETING WERE APPROVED AS TRANSCRIBED, BY THE
FOLLOWING VOTE:
AYES: COPE, CROSBY, GERARDEN
NOES: NONE
ABSENT: NONE
REGULAR AGENDA ITEMS:
ADMINISTRATIVE REVIEW NO. 75-36 (Continued from May 7, 1975)
Applicant: Robert F. Curtis
To permit the construction and establishment of an office and
commercial building, pursuant to Section 9471 of the Huntington
Beach Ordinance Code; located on the southwest corner of Bolsa
Chica Road and Warner Avenue, in a C4, Highway Commercial District.
The Chairman informed the Board that this application was granted
Negative Declaration No. 75-25 by the Environmental Review Board
on April 15, 1975. He further noted that the application had been
continued from the May 7, 1975 meeting in order to allow for sub-
mittal of revised plans.
The applicant, Mr. Robert Curtis, was present.
The Board reviewed the revised plans. Discussion centered on
landscaping requirements as well as locations and types of drive-
ways for the proposal. The Chairman noted that reciprocal access
agreements were not possible due to the location of a power pole
on the property; he further noted that the applicant had submitted
a notarized letter expressing the intent to provide an automatic
fire sprinkler system throughout the complex.
Conditions of Approval were discussed.
BZA 5-14-75 Page 1
Minutes: Huntington Beach Board of Zoning Adjustments
May 14, 1975
Page 2
Administrative Review No. 75-36
ON MOTION BY COPE AND SECOND BY CROSBY, THE BOARD OF ZONING
ADJUSTMENTS ADOPTED NEGATIVE DECLARATION NO. 75-25 BY THE
FOLLOWING VOTE:
AYES: COPE, CROSBY, GERARDEN
NOES: NONE
ABSENT: NONE
ON MOTION BY CROSBY AND SECOND BY COPE, ADMINISTRATIVE REVIEW
NO. 75-36 WAS APPROVED WITH THE FOLLOWING CONDITIONS, BY THE
FOLLOWING VOTE:
A. TO BE COMPLETED PRIOR TO ISSUANCE OF BUILDING PERMITS:
1. The revised conceptual plot plan and elevations
received May 13, 1975 shall be the approved layout,
subject to the modifications described herein:
a. Radius type driveway approaches shall be provided
at all points of access.
b. Six percent (6%) of the site shall be landscaped.
Said landscaped areas shall not include any areas
proposed as automobile overhang areas.
A plan delineating said modifications shall be sub-
mitted to the Secretary of the Board. If such plan
complies with the modifications outlined by the Board,
said plan shall be approved and made a permanent part
of the administrative file.
In its approval action, the Board of Zoning Adjustments
considered the following issues relating to the conceptual
plan:
Traffic circulation and drives;
Parking layout;
Lot area;
Lot width and lot depth;
Type of use and its relation to property and improvements
in the immediate vicinity;
Past administrative action regarding this property.
2. The following plans shall be submitted to the Secretary
of the Board:
a. Landscape and irrigation plan complying.wi•th
Article 979 of the Huntington Beach Ordinance Code
and landscaping specifications on file in the
Department of Public Works.
1
BZA 5-14-75 Page 2
Minutes: Huntington Beach Board of Zoning Adjustments
May 14, 1975
Page 3
Administrative Review No. 75-36
b. Rooftop mechanical equipment screening plan.
Said plan shall indicate screening of all
rooftop mechanical equipment and shall delineate
the type of material proposed to screen said
equipment.
3. Soil and compaction reports shall be submitted by a
certified soils engineer. Said reports shall be sub-
mitted to the Department of Building and Community
Development and shall be subject to approval by that
Department.
4. Fire protection systems, including automatic sprinkler
systems, standpipe systems, fire hydrants, fire alarm
systems, and any other required fire protection and
detection devices or systems shall comply with the
specifications of the Huntington Beach Fire Code
Plans for such systems and devices shall be sub-
mitted to the Fire Department and shall be subject to
approval by the Departments of Fire and Public Works.
5. The developer shall participate in the local drainage
assessment district.
B. GENERAL CONDITIONS:
1. All building spoils, such as unusable lumber, wire,
pipe, and other surplus or unusable material, shall
be disposed of at an offsite facility equipped to
handle them.
2. Natural gas shall be stubbed in at the locations of
cooking facilities, water heaters, and central heating
units.
3. An engineering geologist shall be engaged to submit a
report indicating the ground surface acceleration from
earth movement for the project property.
4. All structures proposed for construction within this
subdivision shall be constructed in compliance with
the g-factors as indicated by the geologist's report.
5. Calculations for footings and structural members to
withstand anticipated g-factors shall be submitted
to the City for review prior to the issuance of
building permits.
BZA 5-14-75 Page 3
Minutes: Huntington Beach Board of Zoning Adjustments
May 14, 1975
Page 4
Administrative Review No. 75-36
6. The City of Huntington Beach is to be notified prior
to any grading or surface disturbance, in order to
arrange for a pre -grading conference among the con-
tractor, ARI, and the Department of Environmental
Resources.
AYES: COPE, CROSBY, GERARDEN
NOES: NONE
ABSENT: NONE
USE PERMIT NO. 75-18 (Continued from May 7, 1975)
Applicant: Wilfrie L. Byer
To permit an addition to a building having a nonconforming yard,
pursuant to Section 9719 of the Huntington Beach Ordinance Code;
located on the east side of England Street, approximately 58
feet north of Lincoln Street, in an R2, Medium Density Residential
District.
The Chairman informed the Board that this application is a Cate-
gorical Exemption, Class III, California Environmental Quality
Act, 1970. He further noted that the application had been con-
tinued from the May 7, 1975 meeting in order to allow for sub-
mittal of revised plans.
Mr. Albert S. Andrews represented the applicant.
The Chairman opened the continued Public Hearing; there being
no parties present to speak for or against the proposal, the
Public Hearing was closed.
The Board reviewed the revised plans. Discussion centered on
dedication requirements and conversion of one unit on the pro-
perty into a two -car garage. The Chairman noted that site and
setback dimensions on the plan were inaccurate, and stated that
a modified plan depicting accurate dimensions would be required.
Conditions of Approval were discussed.
ON MOTION BY COPE AND SECOND BY CROSBY, USE PERMIT NO. 75-18
WAS APPROVED WITH THE FOLLOWING CONDITIONS AND FINDINGS, BY
THE FOLLOWING VOTE:
BZA 5-14-75 Page 4
Minutes: Huntington Beach Board of Zoning Adjustments
May 14, 1975
Page 5
Use Permit No. 75-18
A. TO BE COMPLETED PRIOR TO ISSUANCE OF BUILDING PERMITS:
1. The revised conceptual plot plan and elevations received
May 12, 1975 shall be the approved layout, subject to the
modification described herein:
Accurate site and setback dimensions shall be shown.
A plan delineating said modification shall be submitted
to the Secretary of the Board. If such plan complies
with the modification outlined by the Board, said plan
shall be approved and made a permanent part of the
administrative file.
In its approval action, the Board of Zoning Adjustments
considered the following issues relating to the conceptual
plan:
Traffic circulation and drives;
Parking layout;
Lot area;
Lot width and lot depth;
Type of use and its relation to property and improvements
in the immediate vicinity;
Past administrative action regarding this property.
2. In accordance with the City's Master Plan of Streets
and Highways, an additional 2 1/2 feet of right-of-way
on the alley shall be dedicated.
3. Soil and compaction reports shall be submitted by a
certified soils engineer. Said reports shall be sub-
mitted to the Department of Building and Community
Development and shall be subject to approval by that
Department.
B. TO BE COMPLETED PRIOR TO FINAL INSPECTION:
1. The alley shall be improved to the center line of such
right-of-way, as required by the Department of Public
Works. Said improvement shall include curbs, gutters,
sidewalks, paving, street trees, street lights, street
signs, street drainage, and sewer and water main ex-
tensions, in full compliance with the City of Huntington
Beach street standards and requirements.
2. The existing two car garage shall be modified to serve
of off-street parking, with access directly from the alley.
BZA 5-14-75 Page 5
Minutes: Huntington Beach Board of Zoning Adjustments
May 14, 1975
Page 6
Use Permit No. 75-18
FINDINGS OF THE BOARD:
1. The establishment, maintenance, and operation of the use
will not be detrimental to:
a. The general welfare of persons residing or working in
the vicinity.
b. Property and improvements in the vicinity of such
use or building.
2. The granting of a Use Permit will not adversely affect
the Master Plan of the City of Huntington Beach.
3. The proposal is consistent with the City's General Plan of
Land Use.
AYES: COPE, CROSBY, GERARDEN
NOES: NONE
ABSENT: NONE
USE PERMIT NO. 75-11
Applicant: W & D Commercial Properties
To permit the construction and establishment of a shopping center,
pursuant to Section 9472 of the Huntington Beach Ordinance Code;
located on the southwest corner of Edinger Avenue and Sher Lane,
in a C2, Community Business District.
The Chairman informed the Board that this application was granted
Negative Declaration No. 75-26 by the Environmental Review Board
on April 29, 1975.
Representing the applicant were: Mr. Jerry Dicker, Mr. Al Cruz,
Mr. Steve Powers, and Mr. Mark Thompson.
The Chairman opened the Public Hearing; there being no parties
present to speak for or against the proposal, the Public Hearing
was closed.
The Board reviewed the proposal. The Chairman suggested that
the applicant be granted a parking percentage Allowance based on
storage needs for the complex, thus allowing the elimination of
parking stalls along the south property line. He stated that
elimination of said parking stalls would result in an improved
plan and would allow for improved circulation for the project.
The applicant's representatives expressed agreement with this
suggestion.
BZA 5-14-75 Page 6
Minutes: Huntington Beach Board of Zoning Adjustments
May 14, 1975
Page 7
Use Permit No. 75-11
Further discussion centered on fire sprinkler requirements for
the project. Mr. Dicker stated that it was their intent to
provide same for the large buildings in the complex only;
however, the Fire Department representative stated that,
pending further review by his Department, automatic fire
sprinklers would be required throughout the entire complex.
Board member Crosby expressed concern regarding the 12' wide
driveway on the proposal. Following discussion, it was decided
that disposition of the driveway would be subject to review and
approval by the Traffic Engineer.
Conditions of Approval were discussed.
ON MOTION BY GERARDEN AND SECOND BY CROSBY, THE BOARD OF
ZONING ADJUSTMENTS ADOPTED NEGATIVE DECLARATION NO. 75-26 BY
THE FOLLOWING VOTE:
AYES: COPE, CROSBY, GERARDEN
NOES: NONE
ABSENT: NONE
ON MOTION BY GERARDEN AND SECOND BY CROSBY, USE PERMIT NO. 75-11
WAS APPROVED WITH THE FOLLOWING CONDITIONS AND FINDINGS, BY THE
FOLLOWING VOTE:
A. TO BE COMPLETED PRIOR TO ISSUANCE OF BUILDING PERMITS:
1. The revised conceptual plot plan received May 12, 1975
shall be the approved layout, subject to the modifica-
tion described herein:
Deletion of the parking spaces abutting the
south property line.
A plan delineating said modification shall be sub-
mitted to the Secretary of the Board. If such
plan complies with the modification outlined by
the Board, said plan shall be approved and made
a permanent part of the administrative file.
In its approval action, the Board of Zoning Adjustments
considered the following issues relating to the conceptual
' plan:
Traffic circulation and drives;
Parking layout; -
Lot area;
Lot width and lot depth;
Type of use and its relation to property and improvements
in.the immediate vicinity;
Past administrative action regarding this property.
BZA 5-14-75 Page 7
Minutes: Huntington Beach Board of Zoning Adjustments
May 14, 1975
Page 8-
Use Permit No. 75-11
A. 2. The following plans shall be submitted to the Secretary
of the Board.
a. Landscape and irrigation plan complying with Article
979 of the Huntington Beach Ordinance Code and
landscaping specifications on file in the Department
of Public Works.
b. Rooftop mechanical equipment sCreening__plan... _ Said
plan shall indicate screening of all rooftop mecha-
nical equipment and shall delineate the type of
material proposed to screen said equipment.
C. Elevations for the proposed commercial buildings. Said
plan shall be subject to approval by the Board.
3. Soil and compaction reports shall be submitted by a certified
soils engineer. Said reports shall be submitted to the
Department of Building and Community Development and shall be
subject to approval by that Department.
4. Fire protection systems, including automatic sprinkler
systems, standpipe systems, fire hydrants, fire alarm
systems, and any other required fire protection and
detection devices or systems shall comply with the
specifications of the Huntington Beach Fire Code.
Plans for such systems and devices shall be submitted
to the Fire Department and shall be subject to approval
by the Departments of Fire and Public Works.
5. The developer shall participate in the local drainage
assessment district.
6. The developer shall participate in the Orange County
Sanitation District #3 Sewer Annex District.
B. TO BE COMPLETED PRIOR TO FINAL INSPECTION:
Edinger Avenue and Sher Lane shall be improved to the center
line of such right-of-way. Said improvements shall include
curbs, gutters, sidewalks, paving, street trees, street lights,
street signs, street drainage, and sewer and water main exten-
sions, in full compliance with the City of Huntington Beach
street standards and requirements.
C. GENERAL CONDITIONS:
1. The developer shall
Huntington Beach for
maintenance, located
on Edinger Avenue.
details).
dedicate an easement to the City of
traffic signal installation and
within the main alley -type entrance
(Contact Public Works Department for
1
BZA 5-14-75 Page 8
Minutes: Huntington Beach Board of Zoning Adjustments
May 14, 1975
Page 9
Use Permit No. 75-11
2. All building spoils, such as unusable lumber, wire, pipe,
and other surplus or unusable material, shall be disposed
of at an off -site facility equipped to handle them.
3. Natural gas shall be stubbed in at the locations of
cooking facilities, water heaters, and central heating
units.
4. An engineering geologist shall be engaged to submit a
report indicating the ground surface acceleration from
earth movement for the project property.
5. All structures proposed for construction within this
project shall be constructed in compliance with the
g-factors as indicated by the geologist's report.
6. Calculations for footings and structural members to
withstand anticipated g-factors shall be submitted to
the City for review.
7. Where street lighting is to be installed by the applicant,
it is recommended that consideration be given to the ins-
tallation of energy -saving, high pressure sodium lighting
systems. (Applicant may propose other systems as, or more,
efficient).
FINDINGS OF THE BOARD:
1. The establishment, maintenance, and operation of the use will
not be detrimental to:
a. The general welfare of persons residing or working in the
vicinity.
b. Property and improvements in the vicinity of such use or
building.
2. The granting of a Use Permit will not adversely affect the
Master Plan of the City of Huntington Beach.
3. The proposal is consistent with the City's General Plan of
Land Use.
AYES: COPE, CROSBY, GERARDEN
NOES: NONE
ABSENT: NONE
BZA 5-14-75 Page 9
Minutes: Huntington Beach Board of Zoning Adjustments
May 14, 1975
Page 10
ADMINISTRATIVE REVIEW NO. 75-52
Applicant: Foxx Development Corporation
To permit the construction of a three unit apartment building,
pursuant to Section 9201.2 of the Huntington Beach Ordinance
Code; located on the west side of 18th Street, approximately
50 feet north of Olive Street, in an R3, Medium High Density
Residential District.
The Chairman informed the Board that this application is a
Categorical Exemption, Class III, California Environmental
Quality Act, 1970.
Mr. Bob Jarrard represented the applicant.
The Board reviewed the proposal and discussed Conditions of
Approval with Mr. Jarrard.
ON MOTION BY CROSBY AND SECOND BY COPE, ADMINISTRATIVE REVIEW
NO. 75-52 WAS APPROVED WITH THE FOLLOWING CONDITIONS, BY THE
FOLLOWING VOTE:
A. TO BE COMPLETED PRIOR TO ISSUANCE OF BUILDING PERMITS:
1. The conceptual plot plan, received May 2, 1975,
shall be the approved layout, subject to the modifica
tions described herein:
a. A 25' turning radius shall be provided for all
parking entered directly from the alley.
b. A landscape plan shall be submitted to the
Planning Department and the Department of
Public Works for review and approval.
C. Building elevations shall -be submitted to the
Board for review and approval.
A plan delineating said modifications shall be
submitted to the Secretary of the Board. If such
plan complies with the modifications outlined by
the Board, said plan shall be approved and made a
permanent part of the administrative file.
In its approval action, the Board of Zoning Adjustments
considered the following issues relating to the conceptual
plan:
BZA 5-14-75 Page 10
1
Minutes: Huntington Beach Board of Zoning Adjustments
May 14, 1975
Page 11
Traffic circulation and drives;
Parking layout;
Lot area;
Lot width and lot depth;
Type of use and its relation to property and improvements
in the immediate vicinity;
Past administrative action regarding this property.
2. In accordance with the City's Master Plan of Streets
and Highways, an additional 2 1/2 feet of right-of-
way on the alley shall be dedicated.
B. TO BE COMPLETED PRIOR TO FINAL INSPECTION:
The alley shall be improved to the center line of such
right-of-way. Said improvements shall be as required by
the Department of Public Works.
AYES: COPE, CROSBY, GERARDEN
NOES: NONE
ABSENT: NONE
ADMINISTRATIVE REVIEW NO. 75-53
Applicant: Foxx Development Corporation
To permit the construction of a three unit apartment building,
pursuant to Section 9201.2 of the Huntington Beach Ordinance
Code; located on the southeast corner of 18th Street and Olive
Avenue, in an R4, High Density Residential District.
The Chairman informed the Board that this application is a
Categorical Exemption, Class III, California Environmental
Quality Act, 1970.
Mr. Bob Jarrard represented the applicant.
The Board reviewed the proposal and discussed Conditions of
Approval with Mr. Jarrard.
ON MOTION BY CROSBY AND SECOND BY COPE, ADMINISTRATIVE REVIEW
NO. 75-53 WAS APPROVED WITH THE FOLLOWING CONDITIONS, BY THE
FOLLOWING VOTE:
BZA 5-14-75 Page 11
Minutes: Huntington Beach Board of Zoning Adjustments
May 14, 1975
Page 12
Administrative Review No. 75-53
A. TO BE COMPLETED PRIOR TO ISSUANCE OF BUILDING PERMITS:
1. The conceptual plot plan received May 2, 1975 shall
be the approved layout, subject to the modifications
described herein:
a. A 25' turning radius shall be provided for all
parking entered directly from the alley.
b. A landscape plan shall be submitted to the Planning
Department and Department of Public Works for
review and approval.
c. Building elevations shall be submitted to the Board
. for review and approval.
A plan delineating said modifications shall be submitted
to the Secretary of the Board. If such plan complies
with the modifications outlined by the Board, said plan
shall be approved and made a permanent part of the
administrative file.
In its approval action, the Board of Zoning Adjustments
considered the following issues relating to the conceptual
plan:
Traffic circulation and drives;
Parking layout;
Lot ares, lot width, and lot depth;
Type of use and its relation to property and improvements
in the immediate vicinity;
Past administrative action regarding this property.
2. In accordance with the City's Master Plan of Streets
and Highways, an additional 2 1/2 feet of right-of-way
on the alley shall be dedicated.
B. TO BE COMPLETED PRIOR TO FINAL INSPECTION:
The alley and corner radius shall be improved to the center
line of such right-of-way. Said improvements shall be as
required by the Department of Public Works.
AYES: COPE, CROSBY, GERARDEN
NOES: NONE
ABSENT: NONE
BZA 5-14-75 Page 12
Minutes: Huntington Beach Board of Zoning Adjustments
May 14, 1975
Page 13
ADMINISTRATIVE REVIEW NO. 75-54
Applicant: Foxx Development Corporation
To permit the construction of a three unit apartment building,
pursuant to Section 9201.2 of the Huntington Beach Ordinance
Code; located on the east side of 21st Street, approximately
100 feet south of Orange Avenue, in an R3, Medium High Density
Residential District.
The Chairman informed the Board that this application is a
Categorical Exemption, Class III, California Environmental
Quality Act, 1970.
Mr. Bob Jarrard represented the applicant.
The Board reviewed the proposal and discussed Conditions of
Approval with Mr. Jarrard.
ON MOTION BY CROSBY AND SECOND BY COPE, ADMINISTRATIVE REVIEW
NO. 75-54 WAS APPROVED WITH THE FOLLOWING CONDITIONS, BY THE
FOLLOWING VOTE:
A. TO BE COMPLETED PRIOR TO ISSUANCE OF BUILDING PERMITS:
1. The conceptual plot plan received May 2, 1975 shall
be the approved layout, subject to the modifications
described herein:
a. A 25' turning radius shall be provided for all
parking entered directly from the alley.
b. A landscape plan shall be submitted to the Planning
Department and Department of Public Works for review
and approval.
C. Building elevations shall be submitted to the Board
for review and approval.
A plan delineating said modifications shall be submitted
to the Secretary of the Board. If such plan complies
with the modifications outlined by the Board, said
plan shall be approved and made a permanent part of
the administrative file.
In its approval action, the Board of Zoning Adjustments
considered the following issues relating to the conceptual
plan:
BZA 5-14-75 Page 13
Minutes: Huntington Beach Board of Zoning Adjustments
May 14, 1975
Page 14
Administrative Review No. 75-54
Traffic circulation and drives;
Parking layout;
Lot area, lot width, and lot depth;
Type of use and its relation to property and improvements
in the immediate vicinity;
Past administrative action regarding this property.
2. In accordance with the City's Master Plan of Streets
and Highways, an additional 2 1/2 feet of right-of-way
on the alley shall be dedicated.
B. TO BE COMPLETED PRIOR TO FINAL INSPECTION:
The alley shall be improved to the center line of such
right-of-way. Said improvements shall be as required by
the Department of Public Works.
AYES: COPE, CROSBY, GERARDEN
NOES: NONE
ABSENT: NONE
ADMINISTRATIVE REVIEW NO. 75-55
Applicant: Blue Ribbon Builders, Inc.
To permit the relocation of an existing overhead electrical service,
pursuant to Section 9730.9 of the -Huntington Beach Ordinance Code;
located on the south side of Frankfort Street, approximately 150
feet east of Alabama Street, in an R3, Medium Density Residential
District.
The Chairman informed the Board that this application is a
Categorical Exemption, Class I, California Environmental Quality
Act, 1970.
Mr. Robert Redalli represented the applicant.
The Board reviewed the proposal and concurred on approval of same.
ON MOTION BY GERARDEN AND SECOND BY CROSBY, ADMINISTRATIVE REVIEW
NO. 75-55 WAS APPROVED WITH THE FOLLOWING CONDITIONS AND FINDINGS,
BY THE FOLLOWING VOTE:
BZA 5-14-75 Page 14
F-J
1
Minutes: Huntington Beach Board of Zoning Adjustments
May 14, 1975
Page 15
Administrative Review No. 75-55
CONDITIONS OF APPROVAL:
1. The plot plan received May 2, 1975% shall be the approved
layout.
2. The applicant shall install a service panel to facilitate
conversion to underground utilities at a future date,
pursuant to S.9730.11 of the Huntington Beach Ordinance
Code.
FINDINGS OF THE BOARD:
The Board has considered all guidelines for approval of overhead
utilities, and all criteria have been satisfied, pursuant to
Section 9730.10 of the Huntington Beach Ordinance Code.
AYES: COPE, CROSBY, GERARDEN
NOES: NONE
ABSENT: NONE
ADMINISTRATIVE REVIEW NO. 75-59
Applicant: Allen F. Miller
To permit the relocation and enlargement of an existing overhead
electrical service, pursuant to Section 9730.9 of the Huntington
Beach Ordinance Code; located on the east side of Saratoga Lane,
approximately 190 feet north of Caliente Drive, in an R1, Low
Density Residential District.
The Chairman informed the Board that this application is a
Categorical Exemption, Class I, California Environmental Quality
Act, 1970.
Mrs. Jeannette Miller represented the applicant.
The Board reviewed the proposal and concurred on approval of
same.
ON MOTION BY CROSBY AND SECOND BY COPE, ADMINISTRATIVE REVIEW
NO. 75-59 WAS APPROVED WITH THE FOLLOWING CONDITIONS AND FINDINGS,
BY THE FOLLOWING VOTE:
BZA 5-14-75 Page 15
Minutes: Huntington Beach Board of Zoning Adjustments
May 14, 1975
Page 16
Administrative Review No. 75-59
CONDITIONS OF APPROVAL:
1. The plot plan received May 7, 1975 shall be the approved
layout.
2. The applicant shall install a service panel to facilitate
conversion to undergound utilities at a future date, pursuant
to Section 9730.11 of the Huntington Beach Ordinance Code.
FINDINGS OF THE BOARD:
The Board has considered all guidelines for approval of overhead
utilities, and all criteria have been satisfied, pursuant to
Section 9730.10 of the Huntington Beach Ordinance Code.
AYES: COPE, CROSBY, GERARDEN
NOES: NONE
ABSENT: NONE
MISCELLANEOUS:
SPECIAL EVENT NO. 75-10
Applicant: Huntington Harbour Philharmonic Committee
To permit a BOATique, on Wednesday, May 28, 1975, from 10:00
A.M. to 5:00 P.M., at Huntington Harbour.
The applicant was not represented.
The Board reviewed the request and concurred on approval of
same.
ON MOTION BY COPE AND SECOND BY CROSBY, SPECIAL EVENT NO. 75-10
WAS APPROVED BY THE FOLLOWING VOTE:
AYES: COPE, CROSBY, GERARDEN
NOES: NONE
ABSENT: NONE
BZA 5-14-75 Page 16
Minutes: Huntington Beach Board of Zoning Adjustments
May 14, 1975
Page 17
ADMINISTRATIVE REVIEW NO. 73-128
Applicant: Robert Taube
Revision to plot plan to allow a 30' opening in the northerly
parking lot for purposes of access to the alley. Subject pro-
perty is located on the east side of 17th Street, between Pecan
Avenue and Orange Avenue, in a C2, Community Business District.
The Board discussed the proposed revision. Board member Crosby
stated that a letter had been submitted by the owner assuming
responsibility for parking control, and further recommended
approval of the revision.
ON MOTION BY CROSBY AND SECOND BY GERARDEN, THE ABOVE NOTED
REVISION TO ADMINISTRATIVE REVIEW NO. 73-128 WAS APPROVED BY
THE FOLLOWING VOTE:
AYES: COPE, CROSBY, GERARDEN
NOES: NONE
ABSENT: NONE
SIGNS.
Applicant: Horn Oil Company
Request: Monument Sign, 38.5 square feet
Location: 17501 Beach Boulevard
Huntington Beach
Mr. Benton Horn represented the applicant. The Board reviewed
the sign proposal and concurred on approval of same.
ON MOTION BY GERARDEN AND SECOND BY CROSBY, THE ABOVE NOTED
SIGN REQUEST WAS APPROVED WITH THE FOLLOWING CONDITONS, BY
THE FOLLOWING VOTE:
1. The sign plan received May 5, 1975 by the Building
Department shall be the approved layout.
2. The applicant shall comply with all requirements of
Article 976 and Article 948 of the Huntington Beach
Ordinance Code.
3. The sign location is subject to approval by the City's
Traffic Engineer prior to issuance of the permit.
AYES: COPE, CROSBY, GERARDEN
NOES: NONE
ABSENT: NONE
BZA 5-14-75 Page 17
Minutes: Huntington Beach Board of Zoning Adjustments
May 14, 1975
Page 18
COMMENDATION:
Due to the resignation of Marti Nicely, Recording Secretary to
the Board of Zoning Adjustments, Board members extended a commenda-
tion for her service to the Board, as well as an expression of
appreciation and recognition for her excellent help and assistance.
ON MOTION BY COPE AND SECOND BY CROSBY, THE ABOVE NOTED COMMENDATION
WAS APPROVED BY THE FOLLOWING VOTE:
AYES: COPE, CROSBY, GERARDEN
NOES: NONE
ABSENT: NONE
THERE BEING NO FURTHER BUSINESS, THE MEETING WAS ADJOURNED.
9 44'
John M. Cope
Chairman and Secretary
Board of Zoning Adjustments
I
BZA 5-14-75 Page 18