HomeMy WebLinkAbout1975-08-271
MINUTES
HUNTINGTON BEACH BOARD OF ZONING ADJUSTMENTS
CIVIC CENTER
2000 Main Street
Basement, Room B-8
Huntington Beach, Calif.
WEDNESDAY, August 27, 1975, 1:15 P.M.
BOARD MEMBERS:
James W. Palin
Bruce Crosby
Walter Lipps
CITY STAFF Captain Andy Vanderlaan
PRESENT: Fire Department
MINUTES: ON MOTION BY LIPPS AND SECOND BY PALIN, MINUTES OF THE
AUGUST 6, 1975 MEETING WERE APPROVED AS TRANSCRIBED
BY THE FOLLOWING VOTE:
AYES: Palin, Crosby, Lipps
NOES: None
ABSENT: None
REGULAR AGENDA ITEMS:
USE PERMIT NO. 75-8
Applicant: Lanny E. Ludwick
To permit the construction of a six -unit apartment building,
pursuant to Section 9162.3.1 of the Huntington Beach Ordinance
Code, on property located on the west side of Ash Street,
approximately 385 feet south of Cypress Avenue, in an R2,
Medium Density Residential District.
The Chairman informed the Board that this application was granted
Negative Declaration No. 75-15 by the Environmental Review Board
on July 22, 1975.
The Chairman opened the public hearing.
The Board discussed the recommendation of the Planning Department
concerning the first condition of approval which involves the
revised conceptual plan received August 12, 1975.
There being no one present to speak on this matter, the Chairman
closed the public hearing.
ON MOTION BY PALIN AND SECOND BY CROSBY* USE PERMIT NO. 75-8 WAS
APPROVED WITH THE FOLLOWING CONDITION, BY THE FOLLOWING VOTE:
-1- BZA 8/27/75
Minutes: H.B. Board of Zoning Adjustments
Wednesday, August 27, 1975
Page 2
CONDITIONS OF APPROVAL:
A. TO BE COMPLETED PRIOR TO ISSUANCE OF BUILDING PERMITS:
The revised conceptual plot plan, received August 12, 1975,
shall be the approved layout if the Huntington Beach Ordinance
Code is amended to reduce the amount of open space required,
or if the applicant is successful in having a conditional
exception application granted; or, the plot plan received
August 1, 1975 shall be the revised approved layout should
the Huntington Beach Ordinance Code not be amended to reduce
the amount of required open space and the applicant not be
successful in pursuing the August 12, 1975 plot plan approval.
All prior conditions of approval are to remain in effect.
AYES: Palin, Crosby, Lipps
NOES: None
ABSENT: None
USE PERMIT NO. 75-43
Applicant: Pacific Southwest Realty Company
To permit the construction of four (4) drive -up teller windows,
pursuant to Section 9472 of the Huntington Beach Ordinance Code,
on property located on the west side of Brookhurst Street,
approximately 150 feet south of Adams Avenue, in a C4, Highway
Commercial District.
The Chairman noted that this application is a categorical
exemption, Class I, California Environmental Quality Act, 1970.
The Chairman opened the Public Hearing at approximately 1:25 P.M.
Since there were no parties present to spe-: i-_r- or against the
proposed construction, the Chairman tabled this item.
About 3:00 P.M. Mr. R. Wayne Smith, the applicant's representative,
and Mr. David Robinson, reLresenting the owner of the shopping
center, arrived at which time this item was reopened.
The lease is in the process of being reviewed by the landlord
and negotiations are underway. The possibility of the applicant
buying, rather than leasing, the subject property was discussed
and the applicant was informed by the Board that application
would have to be made to the Board again in such event.
There being no one who wished to speak for or against the proposal,
the Chairman closed the public hearing.
The Board noted that this plan would require a reduction in parking.
However, the property had originally been planned to have a super -market,
which has not been constructed at this time. A review of the intended
1
-2- BZA 8/27/75
Minutes: H.B. Board of Zoning Adjustments
Wednesday, August 27, 1975
Page 3
uses for the center was made. An additional landscaped area was
discussed.
ON MOTION BY PALIN AND SECOND BY CROSBY, USE PERMIT NO. 75-43
WAS APPROVED WITH THE FOLLOWING CONDITIONS AND FINDINGS BY THE
FOLLOWING VOTE:
CONDITIONS OF APPROVAL:
A. TO BE COMPLETED PRIOR TO ISSUANCE OF BUILDING PERMITS:
1. The conceptual plot plan and elevations received August 6,
1975 shall be the approved layout.
In its approval action, the Board of Zoning Adjustments considered
the following issues relating to the conceptual plan:
Traffic circulation and drives;
Parking layout;
Lot area;
Lot width and lot depth;
Type of use and its relation to property and improvements in
the immediate vicinity;
Past administrative action regarding this property.
2. The following plan shall be submitted to the Secretary of
the Board:
Landscape and irrigation plan complying with Article 979
of the Huntington Beach Ordinance Code and landscaping
specifications on file in the Department of Public Works
for that area north of the proposed facility as shown
on the approved plan.
B. GENERAL CONDITIONS:
1. A copy of the executed lease shall be filed with the
City prior to issuance of building permit.
FINDINGS:
1. The establishment, maintenance, and operation of the use
will not be detrimental to:
a. The general welfare of persons residing or working in the
vicinity.
b. Property and improvements in the vicinity of such use or
building.
2. The granting of a Use Permit will not adversely affect the
Master Plan of the City of Huntington Beach.
-3- BZA 8/27/75
Minutes: H.B. Board of Zoning Adjustments
Wednesday, August 27, 1975
Page 4
3. The proposal is consistent with the City's General Plan of Land
Use.
AYES: Palin, Crosby, Lipps
NOES: None
ABSENT: None
USE PERMIT NO. 75-44
Applicant: Chamonex Sports, Inc.
To permit a 600 square foot addition to an existing shopping center;
pursuant to Section 9472 of the Huntington Beach Ordinance Code, on
property located at the southwest corner of Goldenwest Street and
Warner Avenue, in a C4,,Highway Commercial District.
The Chairman remarked that this application is a categorical ex-
emption, Class III, California Environmental Quality Act, 1970.
The public hearing was opened by the Chairman.
Mr. James Albright was present on behalf of the applicant. He
stated that the sporting goods store is in need of additional
store space and that is the reason for the planned addition which
is to be constructed on the rear of the present building.
There being no parties present to speak for or against the
proposed addition, the Chairman closed the public hearing.
The Board reviewed the plan and discussed the proposed Conditions
of Approval.
ON MOTION BY LIPPS AND SECOND BY PALIN, USE PERMIT NO. 75-44 WAS AP-
PROVED WITH THE FOLLOWING CONDITIONS, BY TH" TCI-LOWING VOTE:
A. TO BE COMPLETED PRIOR TO ISSUANCE OF BUILDING PERMITS:
1. The conceptual plct plan and elevations, received August 7,
1975, shall be the approved layout.
In its approval action, the Board of Zoning Adjustments considered
the following issues relating to the conceptual plan:
Traffic circulation and drives;
Parking layout;
Parking area;
Lot width and lot depth;
Type of use and its relation to property and improvements in the
immediate vicinity;
Past administrative action regarding this property.
-4- BZA 8/27/75
I
FJ
Minutes: H.B. Board of Zoning Adjustments
Wednesday, August 27, 1975
Page 5
2. The following plan shall be submitted to the Secretary of
the Board:
Rooftop mechanical equipment screening plan. Said plan shall
indicate screening of all rooftop mechanical equipment and
shall delineate the type of material proposed to screen said
equipment.
AYES: Palin, Crosby, Lipps
NOES: None
ABSENT: None
CONDITIONAL EXCEPTION NO. 75-33
Applicant: Gene Engel
To permit a 3-1/2 foot encroachment into the required 5-foot
side yard in lieu of Section 9103.2.1 of the Huntington Beach
Ordinance Code, on property located at the southwest corner
of Meander Lane and Rath Circle, in an R1, Low Density Residential
District.
The Chairman commented that this application is a categorical
exemption, Class V, California Environmental Quality Act, 1970.
There was no one present in connection with this application.
After discussion by the Board, the following motion was made:
ON MOTION BY PALIN AND SECOND BY LIPPS, CONDITIONAL EXCEPTION NO.
75-33 WAS CONTINUED TO SEPTEMBER 3, 1975 IN ORDER FOR THE
APPLICANT TO BE PRESENT, BY THE FOLLOWING VOTE:
AYES: Palin, Crosby, Lipps
NOES: None
ABSENT: None
CONDITIONAL EXCEPTION NO. 75-34
Applicant: David E. Monlon
To permit an 8-foot encroachment into the required 25-foot corner
cut-off in lieu of Section 9103.4.1 of the Huntington Beach
Ordinance Code, on property located at the southwest corner
of Aladdin Drive and Wetherly Lane, in an Rl, Low Density
Residential District.
The Chairman reported that this application is a categorical
exemption, class III, California Environmental Quality Act, 1970.
The public hearing was opened by the Chairman.
-5- BZA 8/27/75
Minutes: H.B. Board of Zoning Adjustments
Wednesday, August 27, 1975
Page 6
The applicant was present. Also present was Rosemary Smith of
4085 Aladdin Drive, spokesman for the Wetherly Bay Property Owners
Association.
The Chairman announced and read a letter in opposition to the
application from Arthur W. Knox.
Mr. Monlon explained that he had previously submitted his plans to
the Wetherly Bay Property Owners Association and acquiesced to their
recommended changes before submitting this application. Mrs. Smith
explained the actions of the Association in connection with Mr.
Monlon's proposed change and the fact that the Association's Board
of Directors, as well as the members, found no fault with the pro-
posed plan. They felt it was unnecessary for a resident, who does
not live in the'area governed by the Association, to comment on
their actions. Mr. Monlon vehemently expressed his feeling that
a board should have some flexibility in applying the code.
There were no other parties present who wished to speak on this
subject, so the Chairman closed the public hearing.
The Board discussed other individual cases in this area who had made
similar changes and who were able to meet'the requirements of the code.
ON MOTION BY PALIN AND SECOND BY CROSBY', CONDITIONAL EXCEPTION NO.
75-34 WAS CONTINUED UNTIL SEPTEMBER 10, 1975 WITH THE CONCURRENCE
OF THE APPLICANT, BY THE FOLLOWING VOTE:
AYES: Palin, Crosby,'Lipps
NOES: None
ABSENT: None
TENTATIVE PARCEL MAP NO. 75-10
Applicant: Wilfred Schryer
To permit a two -lot subdivision, pursuant to Section 9930.1 of the
Huntington Beach Ordinance Code, on property located at the north-
west corner of Springfield Street and Pine Street, in an Rl, Low
Density Residential District.
The Chairman apprised the Board that this application was granted
Negative Declaration No. 75-65 by the Environmental Review Board on
August 26, 1975.
Ron Winterbtrn was present on behalf of the applicant.
The Board discussed proposed conditions of approval with Mr.
Winterburn.
ON MOTION BY PALIN AND SECOND BY LIPPS, TENTATIVE PARCEL MAP NO.
75-10 WAS APPROVED WITH THE FOLLOWING CONDITIONS, BY THE FOLLOWING
VOTE:
-6- BZA 8/27/75
Minutes: H.B. Board of Zoning Adjustments
Wednesday, August 27, 197*5
Page 7
CONDITIONS OF APPROVAL:
A. TO BE COMPLETED PRIOR TO USE OR OCCUPANCY OF SAID PARCEL
FOR ANY PRUPOSE:
1. The tentative parcel map received by the Planning Depart-
ment on August 12, 1975 shall be the approved layout.
2. A parcel map shall be filed with, and approved by, the
Department of Public Works, and recorded with the Orange
County Recorder.
3. Compliance with all applicable City ordinances is required.
4. A copy of the recorded parcel map shall be filed with the
Planning Department.
AYES: Palin, Crosby, Lipps
NOES: None
ABSENT: None
TENTATIVE PARCEL MAP NO. 75-7
Applicant: George R. Michelle
To permit a four (4) lot subdivision, pursuant to Section 9930.1
of the Huntington Beach Ordinance Code, on property located at
the southeast corner of Modale Drive and Lister Lane, in an R1,
Low Density Residential District.
The Chairman noted that this application was granted Negative
Declaration No. 75-64 by the Environmental Review Board on
August 26, 1975.
Mr. Ron Winter burn was at the meeting to represent the applicant.
The Board reviewed the plan and discussed the conditions of
approval being prclosed.
ON MOTION BY CROSBY AND SECOND BY LIPPS, NEGATIVE DECLARATION
NO. 75-64 WAS ADOPTED, AND TENTATIVE PARCEL MAP NO. 75-7 WAS
APPROVED WITH THE FOLLOWING CONDITIONS, BY THE FOLLOWING VOTE:
A. TO BE COMPLETED PRIOR TO USE OR OCCUPANCY OF SAID PARCEL
FOR ANY PURPOSE:
1. The tentative parcel map received by the Planning
Department on August 8, 1975 shall be the approved layout.
2. A parcel map shall be filed with, and approved by, the
Department of Public Works, and recorded with the Orange
County Recorder.
-7- BZA 8/27/75
Minutes: H.B. Board of Zoning Adjustments
Wednesday, August 27, 1975
Page 8
3. Lister Lane and Modale Drive shall be dedicated to City
standards at the time said parcels are developed.
4. Water supply shall be through the City of Huntington
Beach's water system at the time said parcels are
developed.
5. Sewage disposal shall be through the City of Huntington
Beach's sewage system at the time said parcels are developed.
6. All utilities shall be installed underground at the time
said parcels are developed.
7. Compliance with all applicable City ordinances.
8. The property shall participate in the local drainage as-
sessment district at the time'said parcels are developed.
9. A copy of the recorded parcel map shall be filed with the
Planning Department.
B. GENERAL CONDITIONS:
1. If the developer proposes to provide air conditioning, the
insulation in ceilings and exterior walls shall be a mini-
mum of R-19 and R-11, respectively. If no air conditioning
is to be provided, the insulation in ceilings and exterior
walls shall be a minimum of'R-13 and R-7, respectively.
2. All building spoils, such as unusable lumber, wirf, pipe,
and other surplus or unusable material, shall be disposed
of at an offsite facility equipped to handle them.
3. Natural gas and 220V electrical shall be stubbed in at the
location of clothes dryers, and na.t`,al gas shall be stubbed
in at the locations of cooking facilities, water heaters, and
central heating units.
4. An engineering geologist shall be engaged to submit a report
indicating the ground surface acceleration from earth move-
ment for the project property.
5. All structures proposed for construction within this sub-
division shall be constructed in compliance with the g-
factors as indicated by the geologist's report.
6. Calculations for footings and structural members to with-
stand anticipated g-factors shall be submitted to the City
for review.
AYES: Palin, Crosby, Lipps
NOES: None
ABSENT: None
-8- BZA 8/27/75
1
Minutes: H.B. Board of Zoning Adjustments
Wednesday, August 27, 1975
Page 9
ADMINISTRATIVE REVIEW NO. 75-122
Applicant: Simon and Harriet Goban
To permit an addition to an existing dwelling, pursuant to
Section 9231.6 of the Huntington Beach Ordinance Code, located
at the southeast corner of 13th Street and Olive Avenue, in
an R4, High Density Residential District.
The Chairman mentioned that this application is a categorical
exemption, Class III, California Environmental Quality Act, 1970.
Ms. Harriet Goban was present at this meeting.
The Board reviewed the plan and noted that, rather than a 500
square foot addition, it is only a 260 square foot addition.
ON MOTION BY PALIN AND SECOND BY CROSBY, ADMINISTRATIVE REVIEW
NO. 75-122 WAS APPROVED WITH THE FOLLOWING CONDITIONS, BY
THE FOLLOWING VOTE:
A. TO BE COMPLETED PRIOR TO ISSUANCE OF BUILDING PERMITS:
1. The conceptual plot plan, received August 14, 1975, with
the modifications thereon, shall be the approved layout.
In its approval action, the Board of Zoning Adjustments considered
the following issues relating to the conceptual plan:
Traffic circulation and drives;
Parking layout;
Lot area;
Lot width and lot depth;
Type of use and its relation to n-cpprty and improvements
in the immediate vicinity;
Past administrative action regarding this property.
2. All applicable fees shall be paid prior to issuance of
building permits.
3. The proposed addition shall conform to all applicable
City ordinances in effect at the time of the construction
of the addition.
AYES: Palin, Crosby, Lipps
NOES: None
ABSENT: None
-9- BZA 8/27/75
Minutes: H.B. Board of Zoning Adjustments
Wednesday, August 27, 1975
Page 10
USE PERMIT NO. 75-45
Applicant: Mark C. Bloome
To permit the construction of approximately 9,500 sq. ft. of
retail shopping center, pursuant to Section 9472 of the Huntington
Beach Ordinance Code, on property located on -the west side of Beach
Boulevard, approximately 110 feet north of Ellis Avenue, in a C4,
Highway Commercial District, at 18455 Beach Boulevard.
IN CONJUNCTION WITH:
TENTATIVE PARCEL MAP NO. 75-04
Applicant: Valley Consultants, Inc.
To permit a tentative parcel map to create a two -parcel subdivision,
pursuant to Section 9920 of:the Huntington Beach Ordinance Code, on
property located on the west side of Beach Boulevard, approximately
150 feet north of Main Street; in a C4, Highway Commercial Business
District.
The Chairman noted that both of these applications are covered by
Negative Declaration No. 75-51 which was granted by the ERB on August
19, 1975.
The Chairman opened the public hearing.
Mr. Jerry Jeeves, the Manager of the Denny's restaurant at Main
Street and Ellis Avenue; Mr. James Turner, who is an adjacent
property owner; and Mr. Ron Winterburn representing the applicant,
were present.
The Board discussed the easement for the storm drain going over the
property. It was noted that there will be only one driveway on Beach
for this site. Denny's Restaurant has abou- narking spaces in
the right-of-way to the front of their building, reported Mr. Jeeves.
lie said that he hoped further discussions with Mr. Mark C. Bloome
could be held regarding a possible reciprocal parking agreement. Mr.
Winterb urn reported that"a retaining wall will be constructed along
the northerly and westerly sides of the site, but not on the southerly
side.
The public hearing was closed.
The Board indicated that the storm drain should be reflected on the
plan, as well as the 20 feet to be used for reciprocal ingress and
egress.
ON MOTION BY CROSBY AND SECOND BY PALIN, NEGATIVE DECLARATION NO.
75-51 WAS ADOPTED BY THE FOLLOWING VOTE:
AYES: Palin, Crosby, Lipps
NOES: None
ABSENT: None
-10- BZA 8/27/75
1
Minutes: H.B. Board of Zoning Adjustments
Wednesday, August 27, 1975
Page 11
ON MOTION BY CROSBY AND SECOND BY LIPPS, USE PERMIT NO. 75-45
AND TENTATIVE PARCEL MAP NO. 75-04 WERE APPROVED WITH THE
FOLLOWING CONDITIONS, BY THE FOLLOWING VOTE:
A. TO BE COMPLETED PRIOR TO ISSUANCE OF BUILDING PERMITS:
1. The conceptual plot plan and elevations received June 27,
1975 shall be the approved layout, subject to the
modifications described herein:
a. Storm drain and easement shall be indicated.
A plan delineating said modifications shall be submitted
to the Secretary of the Board. If such plan complies
with the modifications outlined by the Board, said plan_
shall be approved and made a permanent part of the
administrative file.
In its approval action, the Board of Zoning Adjustments considered
the following issues relating to the conceptual plan:
Traffic circulation and drives;
Parking layout;
Lot area, lot width and lot depth;,
Type of use and its relation to property and improvements
in the immediate vicinity;
Past administrative action regarding this property.
2. The following plans shall be submitted to the Secretary
of the Board:
a. Landscape and irrigation plan complying with Article
979 of the Huntington Beach Ordinance Code and
landscaping specifications on file in the Department
of Public Works.
b. Rooftop mechanical equipment screening plan. Said
plan shall indicate screening of all rooftop
mechanical equipment and shall delineate the type
of material proposed to screen said equipment.
3. Soil and compaction reports shall be submitted by a
certified soils engineer. Said reports shall be sub-
mitted to the Department of Building and Community
Development and shall be subject to approval by that
Department.
4. Fire protection systems, including automatic sprinkler
systems, standpipe systems, fire hydrants, fire alarm
systems, and any other required fire protection and de-
tection devices or systems shall comply with the specifi-
cations of the Huntington Beach Fire Code. Plans for such
systems and devices shall be submitted to the Fire Depart-
ment and shall be subject to approval by the Departments
of Fire and Public Works.
-11- BZA 8/27/75
Minutes: H.B. Board of Zoning Adjustments
Wednesday, August 27, 1975
Page 12
5. The developer shall participate in the local drainage
assessment district.
6. The developer shall participate in the Orange County
Sanitation District #3 Sewer Annex District.
7. All applicable fees shall be paid prior to issuance of
building permits.
B. GENERAL CONDITIONS:
1. Storm drain easement is to be recorded prior to the issuance
of building permit.
CONDITIONS OF APPROVAL
TENTATIVE PARCEL MAP NO. 75-04
A. TO BE COMPLETED PRIOR TO USE OR OCCUPANCY OF SAID PARCELS FOR
ANY PURPOSE:
1. The tentative parcel map received by the Planning Department
on June 27, 1975 shall be the approved layout with the
amendments as noted thereon.
2. A parcel map'shall be filed with, and approved by, the Depart-
ment of Public Works, and recorded with the Orange County
Recorder.
3. Beach Boulevard shall be dedicated to City standards at the
time said parcels are developed.
4. Water supply shall be through the City of Huntington Beach's
water system at the time said parcels are developed.
5. Sewage disposal shall be through the City of Huntington Beach's
sewage system at the time said parcels are developed.
6. All utilities sh-ll be installed underground at the time said
parcels are developed.
7. Compliance with,all applicable City ordinances.
8. The property shall participate in the local drainage as-
sessment district at the time said parcels are developed.
(Contact the Department of Public Works for additional
information.)
9. A copy of the recorded parcel map shall be filed with the
Planning Department.
-12- BZA 8/27/75
I
Minutes: H.B. Board of Zoning Adjustments
Wednesday, August 27, 1975
Page 13
B. GENERAL CONDITIONS:
1. If the developer proposes to provide air conditioning,
the insulation in ceilings and exterior walls shall be
a minimum of R-19 and R-11, respectively. If no air
conditioning is to be provided, the insulation in
ceilings and exterior walls shall be a minimum of R-13
and R-7,respectively.
2. All building spoils, such as unusable lumber, wire, pipe,
and other surplus or unusable material, shall be disposed
of at an offsite facility equipped to handle them.
3. An engineering geologist shall be engaged to submit a
report indicating the ground surface acceleration from
earth movement for the project property.
4. All structures proposed for construction within this
subdivision shall be constructed in compliance with the
g-factors as indicated by the geologist's report.
5. Calculations for footings and structural members to with-
stand anticipated g-factors shall be submitted to the
City for review.
AYES: Palin, Crosby, Lipps
NOES: None
ABSENT: None
ADMINISTRATIVE REVIEW NO. 75-12
Applicant: Leonard 0. Lindborg
To permit the construction of a duri.-A dwelling unit, pursuant to
Section 9161.2 of the Huntington Beach Ordinance Code, on property
located on the east side of 18th Street, approximately 50 feet
north of Pecan Avenue, in an R2, Medium Density Residential District.
The Chairman noted that this is a categorical Exemption, class III,
California Environmental Quality Act, 1970. He further noted
it was continued from March 19, 1975.
The Board reviewed the proposed plan and discussed the required
improvements, as well as the dedications for right-of-way.
ON MOTION BY LIPPS AND SECOND BY PALIN, ADMINISTRATIVE REVIEW
NO. 75-12 WAS APPROVED WITH THE FOLLOWING CONDITIONS, BY THE
FOLLOWING VOTE:
-13- BZA 8/27/75
Minutes: H.B. Board of Zoning Adjustments
Wednesday, August 27, 1975
Page 14
A. TO BE COMPLETED PRIOR TO ISSUANCE OF BUILDING PERMITS:
1. The revised plot plan received August 21, 1975 and the
elevations received August 26, 1975 shall be the approved
layout.
In its approval action, the Board of Zoning Adjustments considered
the following issues relating to the conceptual plan:
Traffic circulation and drives;
Parking layout;
Lot area;
Lot width and lot depth;
Type of use and its relation to property and improvements
in the immediate vicinity
Past administrative action regarding this property.
2. In accordance with the City's Master Plan of Streets and
Highways, an additional two and one-half feet of right-of-
way on the alley shall be dedicated.
3. Soil and compaction reports shall be submitted by a certified
soils engineer. Said reports shall be'submitted to the
Department of Building and Community Development and shall
be subject to approval by that Department.
4. Fire protection systems, including automatic sprinkler systems,
standpipe systems, fire hydrants, fire alarm systems, and any
other required fire protection and detection devices or systems
shall comply with the specifications of the Huntington Beach
Fire Code. Plans for such systems and devices shall be
submitted to the Fire Department and shall be subject to
approval by the Departments of Fir_ -r.Fuhlic Works.
5. The developer shall participate in the local drainage assessment
district.
6. The developer shall pay all applicable fees prior to issuance
of building permits.
B. TO BE COMPLETED PRIOR TO FINAL INSPECTION:
1. Eighteenth Street and the alley shall be improved to the
centerline of such right-of-way. Said improvement shall
include curbs, gutters, sidewalks, paving, street trees,
street lights, street signs, street drainage, and sewer
and water main extensions, in full compliance with the
City of Huntington Beach street standards and requirements.
C. GENERAL CONDITIONS:
1. A parcel map shall be recorded prior to final inspection to
consolidate said property into a legal building site.
-14- BZA 8/27/75
Minutes: H.B. Board of Zoning Adjustments
Wednesday, August 27, 1975
Page 15
AYES: Palin, Crosby, Lipps
NOES: None
ABSENT: None
ADMINISTRATIVE REVIEW NO. 75-13
Applicant: Leonard O. Lindborg
To permit the construction of a duplex dwelling unit, pursuant
to S. 9161.2 of the Huntington Beach Ordinance Code, on property
located on the west side of 17th Street, approximately 100 ft.
south of Acacia Avenue, in an R2, Medium Density Residential
District.
The Chairman informed the Board that this is a categorical
exemption, class III,.California Environmental Quality Act,
1970, and that it has been continued from March 19, 1975.
The proposed construction plan was reviewed and the Board
concurred that dedications for right-of-way would have to be
made on the alley and 17th Street.
ON MOTION BY PALIN AND SECOND BY LIPPS, ADMINISTRATIVE REVIEW
N0. 75-13 WAS APPROVED WITH THE FOLLOWING CONDITIONS, BY THE
FOLLOWING VOTE:
A. TO BE COMPLETED PRIOR TO ISSUANCE OF BUILDING PERMITS:
1. The revised plot plan received August 21, 1975 and the
elevations received August 26, 1975 shall be the approved
layout.
In its approval action, the Board of Zoning Adjustments considered
the following issues relating to the conceptual plan:
Traffic circulation and drives;
Parking layout;
Lot area;
Lot width and lot depth;
Type of use and its relation to property and improvements
in the immediate vicinity;
Past administrative action regarding this property.
2. In accordance with the City's Master Plan of Streets and
Highways, an additional two and one-half feet of right-
of-way on the alley shall be dedicated.
3. Soil and compaction reports shall be submitted by a cer-
tified soils engineer. Said reports shall be submitted
to the Department of Building and Community Development
and shall be subject to approval by that Department.
-15- BZA 8/27/75
Minutes: H.B. Board of Zoning Adjustments
Wednesday, August 27, 1975
Page 16
4. Fire protection systems, including automatic sprinkler
systems, standpipe systems, fire hydrants, fire alarm
systems, and any other required fire protection and de-
tection devices or systems shall comply with the specifi-
cations of the Huntington Beach Fire Code. Plans for such
systems and devices shall be submitted to the Fire Depart-
ment and shall be subject to approval by the Departments
of Fire and Public Works.
5. The developer shall participate in the local drainage
assessment district.
6. The developer shall pay all applicable fees prior to the
issuance of building permits.
B. TO BE COMPLETED PRIOR TO FINAL INSPECTION:
1. Seventeenth Street and the alley shall be improved to the
centerline of such right-of-way. Said improvement shall
include curbs, gutters, sidewalks, paving, street trees,
street lights, street signs, street drainage, and sewer
and water main extensions, in full compliance with the City
of Huntington Beach street standards and requirements.
C. GENERAL CONDITION:
1. A parcel map shall be recorded prior to final inspection
to consolidate said property into a legal building site.
AYES: Palin, Crosby, Lipps
NOES: None
ABSENT: None
ADMINISTRATIVE REVIEW NO. 75-14
Applicant: Leonard O. Lindborg
To permit the construction of a duplex dwelling unit, pursuant to
S. 9161.2 of the Huntingtoi: Beach Ordinance Code, on property located
on the east side of 21st Street, approximately 100 ft. north of
Acacia Avenue, in an R2, Medium Density Residential District.
The Chairman noted that this application has been continued from
March 19, 1975 and that it is a categorical exemption, Class III,
California Environmental Quality Act, 1970.
The Board reviewed the plan and discussed the fact that a parcel
map should be filed. Dedications to the City on 21st Street and
the alley for right-6f-way will be a requirement of the Board's
approval.
ON MOTION BY PALIN AND SECOND BY LIPPS, ADMINISTRATIVE REVIEW NO.
75-14 WAS APPROVED WITH THE FOLLOWING CONDITIONS, BY THE FOLLOWING
VOTE:
1
[l
-16- BZA 8/27/75
Minutes: H.B. Board of Zoning Adjustments
Wednesday, August 27, 1975
Page 17
A. TO BE COMPLETED PRIOR TO ISSUANCE OF BUILDING PERMITS:
1. The revised plot plan received August 26, 1975 together
Avith the elevations shall be the approved layout.
In its approval action, the Board of Zoning Adjustments con-
sidered the following issues relating to the conceptual plan:
Traffic circulation and drives;
Parking layout;
Lot area;
Lot width and lot depth;
Type of use and its relation to property and improvements
in the immediate vicinity;
Past administrative action regarding this property.
2. In accordance with the City's Master Plan of Streets and
Highways, an additional two and one-half feet of right-of-
way on the alley shall be dedicated.
3.
Soil and compaction reports shall be submitted by a
certified soils engineer. Said reports shall be sub-
mitted to the Department of Building and Community
Development and shall be subject to approval by that
Department.
4.
Fire protection systems, including automatic sprinkler
systems, standpipe systems, fire hydrants, fire alarm
systems, and any other required fire protection and
detection devices or systems shall comply with the
specifications of the Huntington Beach Fire Code. Plans
for such systems and devices shall be submitted to the
Fire Department and shall be subject to approval by the
Department of Fire and Public Works.
5.
The developer shall participate in the local drainage
assessment district.
6.
The developer shall pay all applicable fees prior to the
issuance of building permits.
B. TO BE COMPLETED PRIOR TO FINAL INSPECTION:
1. Twenty-first Street and the alley shall be improved to
the centerline of such right-of-way. Said improvement
shall include curbs, gutters, sidewalks, paving, street
trees, street lights, street signs, street drainage,
and sewer and water main extensions, in full compliance
with the City of Huntington Beach street standards and
requirements.
-17- BZA 8/27/75
Minutes: H.B. Board of Zoning Adjustments
Wednesday, August 27, 1975
Page 18
C. GENERAL CONDITION:
1. A parcel map shall be recorded prior to final inspection to
consolidate said property into a legal building site.
AYES: Palin, Crosby;"Lipps
NOES: None
ABSENT: None
SIGNS:
Applicant: Local Neon Co., Inc.
Request: one wall 'sign, '3' x 20' (60''sq. ft. )
Location: Waite's'Pharmacy,'17522 Beach Boulevard
The Board reviewed the layout for'this sign'and concurred on
its approval.
ON MOTION BY LIPPS AND SECOND BY PALIN, THE ABOVE -NOTED REQUEST
WAS APPROVED WITH THE FOLLOWING'CONDITIONS, BY THE FOLLOWING VOTE:
1. The sign plan received August 27, 1975 shall be the approved
layout.
2. The applicant shall comply with all requirements of Article
976 of the Huntington Beach Ordinance Code.
AYES: Palin, Crosby, Lipps
NOES: None
ABSENT: None
THERE BEING NO FURTHER BUSINESS, THE MEETING WAS ADJOURNED.
'At --figgued
James W. Palin, Secretary
Board of Zoning Adjustments
-18- BZA 8/27/75