HomeMy WebLinkAbout1977-01-12MINUTES
HUNTINGTON BEACH BOARD OF ZONING ADJUSTMENTS
Room B-3 - Civic Center
2000 Main Street
Huntington Beach, California
WEDNESDAY, JANUARY 12, 1977 - 1:15 PM
BOARD MEMBERS PRESENT: PALIN, CROSBY, SPENCER
CITY STAFF PRESENT: MEL OTT, FIRE DEPARTMENT; SERGIO MARTINEZ
MINUTES: ON MOTION BY SPENCER AND SECOND BY CROSBY THE MINUTES
OF THE _REGULAR MEETINGS OF DECEMBER 15, DECEMBER 22, AND DECEMBER
29, 1976, WERE APPROVED AS TRANSCRIBED, BY THE FOLLOWING VOTE:
AYES: PALIN, CROSBY, SPENCER
NOES: NONE
ABSENT: NONE
REGULAR AGENDA ITEMS:
USE PERMIT NO. 76-31
Applicant: Ni-Mar Enterprises
To permit the construction of a triplex abutting an arterial street
pursuant to Section 9201.4 of the Huntington Beach Ordinance Code,
located on the northwest corner of Warner Avenue and'Green Street
in an R3, Medium -High Density Residential District.
Chairman Spencer informed the -Board that this request is a Categ-
orical Exemption, Class III, California Environmental Quality
Act, 1970.
Secretary Palin reported that the applicant has contacted the
Planning Department in regard to redrawing the plan and possibly
filing a variance on the project, and has requested a continuance.
ON MOTION BY SPENCER AND SECOND BY PALIN USE PERMIT NO. 76-31 WAS
CONTINUED, AT THE REQUEST OF THE APPLICANT, TO THE REGULAR MEETING
OF FEBRUARY 2, 1977, BY THE FOLLOWING VOTE:
AYES: PALIN, CROSBY, SPENCER
NOES: NONE
ABSENT: NONE
Minutes, H.B. Board of Zoning Adjustments
January 12, 1977
Page 2
PLOT PLAN AMENDMENT NO. 76-11
Applicant: Norm Haynie
To permit a minor plot plan amendment to a previously approved'
Planned Residential Development pursuant to Section 9811.4 of
the Huntington Beach Ordinance Code. Minor amendments include
but are not limited to a reduction of three (3) units, rearrange-
ment of the units, and provision of a bicycle and foot paths.
Said property is generally located on the east side of Pacific
Coast Highway and north of Anderson Street in an R4, High Density
Residential District.
Chairman Spencer informed the Board that this request is covered
by EIR 74-14, prepared for Tentative Tract 5813.
The Chairman opened the public hearing. No one was present to
represent the application or to address the Board, and the
public hearing was closed.
Secretary Palin reported that the tract map for this project
is scheduled for review by the Subdivision Committee and the plot
plan amendment should be reviewed by the Planning Commission.
ON MOTION BY PALIN AND SECOND BY CROSBY, PLOT PLAN AMENDMENT
NO. 76-11 WAS REFERRED TO THE FEBRUARY 1, 1977, PLANNING CO.MMIS-
SION MEETING BY THE FOLLOWING VOTE:
AYES: PALIN, CROSBY, SPENCER
NOES: NONE
ABSENT: NONE
PLOT PLAN AMENDMENT NO. 76-12
Applicant.: Rodney Miller
To permit a minor plot plan amendment to a previously approved
racquetball club pursuant to Section 9811.4 of the Huntington
Beach Ordinance Code, to increase the front yard setback from
20 feet to 30 feet. Subject property is located on the east
side of Bolsa Chica Street approximately 300 feet north of
Argosy Drive in an M1-A, Restricted Manufacturing District.
Chairman Spencer informed the Board that this request is covered
by Negative Declaration No. 76-60, adopted on approval of
C.U.P. 76-19.
The Chairman opened the public hearing. No one was present to
represent the application or to address the Board in regard to
the project, and the public hearing was closed.
Secretary Palin reported that the plan submitted is to comply
with the conditions of approval imposed by the Planning Commis-
sion on TT 8688x and CC&Rs of the Kaiser -Aetna tract for the
30 foot setback.
BZA 1-12-77 Page 2
Minutes, H.B. Board of Zoning Adjustments
January 12, 1977
Page 3
Board review included discussion of the lot configuration as
compared to the approved "Y" map and location of the reciprocal
drives. Mel Ott noted that the Fire Department will require
one onsite fire hydrant on subject property.
ON MOTION BY PALIN AND SECOND BY SPENCER, PLOT PLAN AMENDMENT
NO. 76-12 WAS APPROVED WITH THE FOLLOWING FINDINGS AND CONDITIONS,
BY THE FOLLOWING VOTE:
FINDINGS OF THE BOARD:
1. The amendment does not constitute a substantial change.
2. The proposed use of the property remains the same.
3. The adjustment results in an improved plan.
CONDITIONS. OF APPROVAL:
A. TO BE COMPLETED PRIOR TO ISSUANCE OF BUILDING PERMITS:
1. The plot plan received and dated December 28, 1976, shall
be the approved layout.
In its approval action, the Board of Zoninq Adjustments considered
the following issues relating to the conceptual plan:
• Traffic circulation and drives;
• Parking layout;
• Lot area;
• Lot width and lot depth;
• Type of use and its relation to property and improvements in the
immediate vicinity;
. Past administrative action regarding this property.
2. The revised layout shall he subject to all applicable
conditions of approval imposed upon Conditional Use Permit
No. 76-19 and TT 8688x.
3. The approved parcel shall be the parcel delineated upon the
plot plan as Parcel 14.
4. Prior to issuance of building permits a parcel map shall be
submitted to the City for acceptance and recordation.
5. The adjustment of this parcel shall be such that there will
be only one additional legal building site between the
j southerly property line and Argosy Drive.
i
AYES: PALIN, CROSBY, SPENCER
I NOES: NONE
ABSENT: NONE
BZA 1-12-77 Page 3
Minutes, H.B. Board of Zoning Adjustments
January 12, 1977
Page 4
ADMINISTRATIVE REVIEW NO. 76-196
Applicant: Bruce R. Spohr
To permit a 1000 square foot addition to an existing single-
family dwelling pursuant to Section 9354.16 of the Huntington
Beach Ordinance Code, located on the west side of 12th Street
approximately 150 feet south of Orange Avenue in the Townlot
Specific Plan Area One, Section B.
Chairman Spencer informed the Board that this request is a
Categorical Exemption, Class I(e).
Bruce Spohr was present at the meeting.
Board review noted the following deficiencies in the plan:
1) inadequate turning radius; 2) space dimensions for required
onsite parking are not in compliance with code; 3) open space
is deficient; 4) the building is 64 feet long and does not pro-
vide the two -foot offset as required by the specific plan; 5)
no trash area is provided; 6) the drive is too narrow; 7) alley
dedication of two and one-half (2-1/2) feet will be required
and may affect size and layout of the unit; and 8) space dimen-
sions of the garage are inadequate.
The Board also noted that the plans as submitted are not clear
enough to permit a determination on whether the proposed addi-
tion will constitute a complete separate unit from the main
dwelling, and requested that revised plans be submitted to
include a floor layout of the present dwelling as well as how
circulation to the addition is to be provided. Review also took
into consideration the lot coverage, and the applicant was
cautioned that after dedication his lot will be 115.5 feet in
depth and that he should dimension his plan to the centerline of
the 20-foot alley and the street.
After further extensive discussion applicant indicated that he
will need to completely redraw his plot plan and agreed to a
continuance.
ON MOTION PALIN AND SECOND BY CROSBY ADMINISTRATIVE REVIEW NO.
76-196 WAS CONTINUED TO THE REGULAR MEETING OF JANUARY 26, 1977,
1-7ITH THE CONCURRENCT OF THE APPLICANT, BY .THE tFOLLOWING VOTE:
AYES: PALIN, CROSBY, SPENCER
NOES: NONE
ABSENT: NONE
BZA 1-12-77 Page 4
1
Minutes, H.B. Board of Zoning Adjustments
January 12, 1977
Page 5
ADMINISTRATIVE REVIEW NO. 76-197
Applicant: Richard Salmonson
To permit the construction of a four (4) unit apartment build-
ing pursuant to Section 9231.6 of the Huntington Beach Ordin-
ance Code, located on the east side of 16th Street approximately
100 feet south of Walnut Avenue in an R4, High Density
Residential District.
Chairman Spencer informed the Board that this request is a
Categorical Exemption, Class III, California Environmental Quality
Act, 1970.
The Board reviewed the proposed plan, finding that is it not in
compliance with code requirements for setbacks from side property
lines or architectural features.
ON MOTION BY PALIN AND SECOND BY SPENCER ADMINISTRATIVE REVIEW
NO. 76-197 WAS DENIED BY THE FOLLOWING VOTE, FOR THE FOLLOWING
REAS 014 :
REASON FOR DENIAL:
Request is in non-compliance with the, provisions of the Huntington
Beach Ordinance Code.
AYES: PALIN, CROSBY, SPENCER
NOES: NONE
ABSENT: NONE
ADMINISTRATIVE REVIEW NO. 76-198
Applicant: Richard Salmonson
To permit the construction of a four (4) unit apartment building
pursuant to Section 9231.6 of the Huntington Beach Ordinance Code,
located on the east side of 16th Street approximately 50 feet
south of Walnut Avenue in an R4, High Density Residential District.
Chairman Spencer informed the Board that this request is a Categ-
orical Exemption, Class III, California Environmental Quality
Act, 1970.
Board review found the plan to conform to or exceed requirements of
the ordinance code. Reciprocal easements for access were discussed.
ON MOTION BY PALIN AND SECOND BY SPENCER AD.MINISTRA'.T'IVE REVIEW
NO. 76-198 WAS APPROVED WITH THE FOLLOWING CONDITIONS, BY THE FOL-
LOWING VOTE:
BZA 1-12-77 Page 5
Minutes, H.B. Board of. Zoning Adjustments
January 12, 1977
Page 6
CONDITIONS OF APPROVAL:
A. TO BE COMPLETED PRIOR TO ISSUA?ICE OF BUILDING PERMITS:
1. The conceptual plot plan received and dated December 30,
1976, shall be the approved layout, subject to the modifi-
cation described herein:
The plan shall be reversed on the lot to provide the oppor-
tunity for use of a reciprocal driveway along the common
property line between subject site and adjoining site for
ingress -egress.
A plan delineating said modification shall be submitted to the
Department of Building and Community Development upon applica-
tion for building.permits.
In its approval action, the Board of Zoning Adjustments considered
the following issues relating to the conceptual plan:
• Traffic circulation and drives;
. Parking layout;
• Lot area;
. Lot width and lot depth;
. Type of use and its relation to property and improvements in the
immediate vicinity;
. Past administrative action regarding this property.
2. A landscaping and irrigation plan complying with Article
979 of the Huntington Beach Ordinance Code and landscaping
specifications on file in the Department of Public Works
shall he submitted to the Department of Building and
Community Development.
3. In accordance with the City's standards and requirements,
an additional two and one-half (2-1/2) feet of right-of-way
on the alley shall be dedicated.
4. Soil and compaction reports shall be submitted by a certi-
fied soils engineer. Said reports shall be submitted to
the Department of Building and Community Development and
shall be subject to approval by that Department.
5. Fird protection systems, including automatic sprinkler sys-
tems, standpipe systems, fire hydrants, fire alarm systems,
and any other required fire protection and detection device
shall comply with the specifications of the Huntington
Beach Fire Code. Plans for such systems and devices shall
be submitted to the Fire Department and shall be subject to
approval by.the Departments of Fire and Public Works.
BZA 1-12-77 Page 6
Minutes, H.B. Board of Zoning Adjustments
January 12., 1977
Page 7
6. The developer shall participate in the local drainage assess-
ment district.
7. All applicable fees shall be paid prior to issuance of
building permits.
B. TO�BE COMPLETED PRIOR TO FINAL INSPECTION:
1. Sixteenth Street and the alley shall be improved to the
centerlines of such rights -of -way. Said improvement shall
include curbs, gutters, sidewalks, paving, street trees,
street lights, street signs, street drainage, and sewer and
water main extensions, in full compliance with the City of
Huntington Beach street standards and requirements.
C. GENERAL CONDITIONS:
1. A document agreeing to the provision of reciprocal drive-
way easement over and across the rear twenty-five (25) feet
of Lot 11o.16 shall be filed with the City.
AYRS: PALIN, CROSBY, SPENCER
NOES: NONE
ABSENT: NONE
MISCELLANEOUS AGENDA ITEMS:
TENTATIVE TRACT 9286 (Revisions to Landscaping Plan)
Applicant: Foxx Development
Revisions to landscaping plan as required by conditions of approval
imposed on an 8-lot subdivision located at the northwest corner
of Yorktown Avenue and Florida Street.
Pat Spencer explained that the original plan had indicated a dec-
orative masonry wall along'Yorktown. Applicants now propose to
stagger the wall back to the patio areas and provide a green belt
between property line and wall. The sound attenuation capabilities
of the proposed wooden portions of the wall were reviewed as they
would compare to the capability of a masonry wall. It was noted
that the original map had been conditioned for no parking along
Yorktown Avenue, precluding the possibility that the wall setback
might encourage persons to park on the street.
ON MOTION BY PALIN AND SECOND BY SPENCER THE REVISED LANDSCAPING
LAYOUT FOR TT 9286 WAS APPROVED WITH THE FOLLOWING STIPULATION,
BY THE FOLLOWING VOTE:
STIPULATION: Plan is approved with the stipulation that the
acoustical analysis of the wall shall be adjusted to take into
consideration the wood construction vs. masonrv.
AYES: PALIN, CROSBY, SPENCER
NOES: NONE
ABSENT: NONE BZA 1-12-77 Page 7
Minutes, H.E. Board of Zoning Adjustments
January 12, 1977
Page 8
PROPOSED PROJECT ON ARGOSY DRIVE
Applicant: Charles Giles
The Board reviewed informally a tentative proposal for four
industrial buildings at a location on Argosy Drive. Secretary
Palin reported that the proponent is proposing creating a common
wall construction through the middle of the rear building with
openings in the wall for an interim period of indefinite time.
Proponent is also desirous of constructing one wall only between
these buildings, instead of two walls at zero setback. It was
the consensus of the Board that this type construction could not
be permitted.
Mel Ott recommended that two onsite fire hydrants will be required
or, if the buildings are sprinklered, one at a location in the middle
of the site should be adequate.
Circulation was discussed, and it was noted that in order to
provide adequate space for circulation it was possible that some
of the parking would have to be deleted from either side of the
buildings.
SIGN REQUESTS:
Sign Request
Applicant: Film Ad Corporation
Proposal for banners to advertise a grand opening sale at a market
located at the southeast corner of Brookhurst Street and Adams
Avenue.
The Board reviewed the requested banner signs.
ON MOTION BY SPENCER AND SECOND BY PALIN THE SIGN REQUEST 14AS
APPROVED WITH THE FOLLOWING CONDITIONS, BY THE FOLLOWING VOTE:
CONDITIONS OF APPROVAL:
1. The sign plan received and dated January 7, 1977, shall be the
approved layout.
2. The applicant shall comply with all requirements of Article
976 of the Huntington Beach Ordinance Code.
3. The proposed signs are approved for a period extending from
January 24, 1977, to February 23, 1977.
AYES: PALIN, CROSBY, SPENCER
NOES: NONE
ABSENT: NONE
BZA 1-12-77 Page 8
Minutes, H.B. Board of Zoning Adjustments
January 12, 1977
Page 9
THERE BEING NO FURTHER BUSINESS, THE MEETING WAS ADJOURNED.
O
James W. Palin, Secretary
Board of Zoning Adjustments
:df
1
BZA 1-12-77 Page 9