HomeMy WebLinkAbout1978-05-17MINUTES
HUNTINGTON BEACH BOARD OF ZONING ADJUSTMENTS
Room B-8 - Civic Center
2000 Main Street
Huntington Beach, California
WEDNESDAY, MAY 17, 1978 - 1:15 PM
BOARD MEMBERS PRESENT: SPENCER, EADIE, CROSBY
CITY STAFF PRESENT: MEL OTT, FIRE DEPARTMENT
AGENDA ITEMS TO BE CONTINUED, WITHDRAWN, OR REFERRED:
TENTATIVE PARCEL MAP NO. 78-19
Applicant: Emerald Engineering
To permit establishment of a legal parcel of land located on the
south side of Glencoe Avenue approximately 600 feet west of
Beach Boulevard in an R2, Two Family Residential District.
Secretary Spencer reported that a conditional exception has been
filed to the Planning Commission to permit reduction in lot size.
A negative declaration will be filed on the project prior to the
Commission hearing.
ON MOTION BY EADIE AND SECOND BY SPENCER TENTATIVE PARCEL 14AP NO.
78-19 WAS REFERRED TO THE PLANNING COMMISSION TO BE HEARD IN CON-
JUNCTION WITH CONDITIONAL EXCEPTION NO. 78-07 AND A NEGATIVE
DECLARATION REQUEST, BY THE FOLLOWING VOTE:
AYES: SPENCER, EADIE, CROSBY
NOES: NONE
ABSENT: NONE
REGULAR AGENDA ITEMS:
USE PERMIT NO. 78-27
Applicant: Dollar Rent-A-Car
To permit addition of a restroom facility to an existing office
located on the east side of Beach Boulevard approximately 35 feet
north of Blaylock Place in a C4, Highway Commercial District.
This request is a Categorical Exemption, Class l(e), California
Environmental Quality Act, 1970.
Chairman Eadie opened the public hearing. Steve Boyer and
Arthur Hoffpower were present at the meeting. There being no
Minutes, H.B. Board of Zoning Adjustments
May 17, 1978
Page 2
persons to speak for or against the proposal, the public hearing
was closed.
Board discussion included consideration of setbacks, circulation,
and parking on the site.
ON MOTION BY CROSBY AND SECOND BY SPFNCER USE PERMIT NO. 78-27
WAS APPROVED WITH THE FOLLOWING FINDINGS AND CONDITIONS, BY THE
FOLLOWING VOTE:
FINDINGS OF THE BOARD:
1. The establishment, maintenance, and operation of the use will
not be detrimental to the general welfare of persons residing
or working in the vicinity or injurious to property and im-
provements in the general area.
2. Granting of the use permit will not adversely affect the Gen-
eral Plan of the City of Huntington Beach.
3. The proposal is consistent with the City's General Plan of
Land Use.
CONDITIONS OF APPROVAL:
A. TO BE COMPLETED PRIOR TO ISSUANCE OF BUILDING PERMITS:
1. The conceptual plot plan received and dated April 27,
1978, shall be the approved layout.
In its approval action, the Board of Zoning Adjustments considered
the following issues in relation to the conceptual plan:
. Lot area;
. Lot width and lot depth;
• Type of use and its relation to property and improvements in the
immediate vicinity;
. Past administrative action regarding this property.
AYES: SPENCER, EADIE, CROSBY
NOES: NONE
ABSENT: NONE
ADMINISTRATIVE REVIEW NO. 78-43
Applicant: D.J. Roofing
To permit establishment of a roofing material storage yard located
south of the intersection of Manufacture Larie and System Drive in
an Ml-A, Restricted Manufacturing District.
This project is covered by EIR 73-16, adopted by the City Council
on March 18, 1974.
BZA 5-17-78 Page 2
Minutes, H.B. Board of Zoning Adjustments
May 17, 1978
Page 3
James Dickens and Michael Daley were present at the meeting.
Secretary Spencer outlined the following issues of concern on
the proposal: 1) question of whether or not the proposed use is
a permissible and appropriate use in the Ml-A zoning district,
and 2) question of whether or not the present configuration of
the land was permitted by the Board only in conjunction with the
specific site plan approved at the same time that the lot front-
age reduction was allowed.
The applicants addressed the Board to explain how their proposed
use would operate, discussing height and type of storage on the
site and screening of the outside storage from view. They noted
that walls and existing or planned buildings will screen the
site from all sides, with the only view into the property through
its own access strip, which will have a slatted gate across it.
They discussed uses on adjacent properties and expressed the view
that their use would be compatible with surrounding uses.
After further extensive discussion, it was the consensus of the
Board to continue the application to allow staff research on the
use itself and review of the prior actions on the property.
ON MOTION BY EADIE AND SECOND BY SPENCER ADMINISTRATIVE REVIEW
NO. 78-43 WAS CONTINUED WITH THE CONCURRENCE OF THE APPLICANTS TO
THE MEETING OF MAY 24, 1978, BY THE FOLLOWING VOTE:
AYES: SPENCER, EADIE, CROSBY
NOES: NONE
ABSENT: NONE
ADMINISTRATIVE REVIEW NO. 78-44
Applicant: Tom Quintin/Gerald Jackson
To permit construction of an 11,580 square foot industrial build-
ing located on the east side of Connector Lane approximately 600
yards from Engineer Drive.
This request is covered by EIR 73-16, adopted by the City Council
on March 18, 1974.
Mr. Quintin and Mr. Jackson were present at the meeting.
Board review found the plan to be substantially in compliance
with code requirements.
ON MOTION BY SPENCER AND SECOND BY EADIE ADMINISTRATIVE REVIEW
NO. 78-44 WAS APPROVED WITH THE FOLLOWING CONDITIONS, BY THE
FOLLOWING VOTE:
BZA 5-17-78 Page 3
Minutes, H.B. Board of Zoning Adjustments
May 17, 1978
Page 4
CONDITIONS OF APPROVAL:
A. TO BE COMPLETED PRIOR TO ISSUANCE OF BUILDING PERMITS:
1. The conceptual plot plan received and dated May 1, 1978,
shall be the approved layout.
In its approval action, the Board of Zoning Adjustments considered
the following issues in relation to the conceptual plan:
• Traffic circulation and drives;
. Parking layout;
. Lot area;
. Lot width and lot depth;
. Type of use and its relation to property and improvements in
the immediate vicinity;
. Past administrative action regarding this property.
2. The following plans shall be submitted to the Secretary
of the Board:
a. Landscape and irrigation plan complying with Article
979 of the Huntington Beach Ordinance Code and land-
scaping specifications on file in the Department of
Public Works.
b. Rooftop mechanical equipment screening plan. Said plan
shall indicate screening of all rooftop mechanical
equipment and shall delineate the type of material pro-
posed to screen said equipment.
AYES: SPENCER, EADIE, CROSBY
NOES: NONE
ABSENT: NONE
ADMINISTRATIVE REVIEW NO. 78-45
Applicant: C. Gary Hargrove
To permit construction of an 11,580 square foot industrial build-
ing located on the east side of Connector Lane approximately 450
feet south of Engineer Drive in an M1-A, Restricted Manufacturing
District.
This project is covered by EIR 73-16, adopted by the City Council
on March 18, 1974.
Gary Hargrove was present at the meeting.
Board review found the proposal to be substantially in compliance
with code requirements.
ON MOTION BY EADIE AND SECOND BY SPENCER ADMINISTRATIVE REVIEW
NO. 78-45 WAS APPROVED WITH THE FOLLOWING CONDITIONS, BY THE FOL-
LOWING VOTE:
BZA 5-17-78 Page 4
Minutes, H.B. Board of Zoning Adjustments
May 17, 1978
Page 5
CONDITIONS OF APPROVAL:
A. TO BE COMPLETED PRIOR TO ISSUANCE OF BUILDING PERMITS:
1. The conceptual plot plan received and dated May 1, 1978,
shall be the approved layout.
In its approval action, the Board of Zoning Adjustments considered
the following issues in relation to the conceptual plan:
• Traffic circulation and drives;
. Parking layout;
• Lot area;
. Lot width and lot depth;
. Type of use and its relation to property and improvements in the
immediate vicinity;
• Past administrative action regarding this property.
2. The following plans shall be submitted to the Secretary
of the Board:
a. Landscape and irrigation plan complying with Article
979 of the Huntington Beach Ordinance Code and land-
scaping specifications on file in the Department of
Public Works.
b. Rooftop mechanical equipment screening plan. Said plan
shall indicate screening of all rooftop mechanical
equipment and shall delineate the type of material pro-
posed to screen said equipment.
AYES: SPENCER, EADIE, CROSBY
NOES: NONE
ABSENT: NONE
MISCELLANEOUS AGENDA ITEMS:
ADMINISTRATIVE REVIEW NO. 78-28
Applicant: Cub Scout Pack 558
Request for a change of date for a previously approved Cubmobile
Derby from April 15, 1978, to May 21, 1978. Said project is to
be held in the Ellis Street right-of-way between Edwards and
Goldenwest Streets.
ON MOTION BY SPENCER AND SECOND BY EADIE THE CHANGE OF DATE AS
NOTED ABOVE WAS APPROVED, BY THE FOLLOWING VOTE:
AYES: SPENCER, EADIE, CROSBY
NOES: NONE
ABSENT: NONE
BZA 5-17-78 Page 5
Minutes, H.B. Board of Zoning Adjustments
May 17, 1978
Page 6
TENTATIVE PARCEL MAP NO. 76-67
Applicant: Huntington Beach Company
Request for an extension of time for a previously approved five -
lot division of land located at the northeast corner of Main
Street and Yorktown Avenue in an R5-0-CD, Office -Professional,
Oil, Civic District. Said extension is for a one-year period of
time to expire June 29, 1979.
The Board reviewed the request.
ON MOTION BY CROSBY AND SECOND BY SPENCER TENTATIVE PARCEL MAP
NO. 76-67 WAS GRANTED AN EXTENSION OF TIME TO EXPIRE JUNE 29, 1979,
BY THE FOLLOWING VOTE:
AYES: SPENCER, EADIE, CROSBY
NOES: NONE
ABSENT: NONE
THERE BEING NO FURTHER BUSINESS, THE MEETING WAS ADJOURNED.
arles P. Spencer' ecretary
:df
1
BZA 5-17-78 Page 6