CONDITIONAL EXCEPTION NO. 80-6
Applicant: Bank Planning Associates, Inc.
To permit a reduction in driveway width from the required 20 feet
to 10 ft. 2 inches located on the east side of Brookhurst Street,
approximately 350 feet south of Hamilton Avenue.
IN CONJUNCTION WITH:
USE PERMIT NO. 80-5
Applicant: Bank Planning Associates, Inc.
To permit the construction of a financial institution building located
on the east side of Brookhurst, approximately 350 feet south of Hamilton
Avenue.
This request is covered by Negative Declaration No. 80-7.
ON MOTION BY TINDALL AND SECOND BY SPENCER THE BOARD, HAVING FOUND THAT
THE PROPOSED PROJECT WILL NOT HAVE A SIGNIFICANT ADVERSE EFFECT ON THE
PHYSICAL ENVIRONMENT, ADOPTED NEGATIVE DECLARATION NO. 80-7 WITH THE
MITIGATING MEASURES CONTAINED IN USE PERMIT NO. 80-5 GENERAL CONDITIONS
B-3 THROUGH B-7 IMPOSED ON THE USE PERMIT APPLICATION, BY THE FOLLOWING
VOTE:
AYES: Spencer, Kelly, Tindall
NOES: None
ABSENT: None
Minutes: H.B. Board of Zoning Adjustments
Wednesday, February 27, 1980
Page 2
Mr. Newlove was present to represent the application.
Secretary Spencer noted that the application had been continued
to allow the applicant an opportunity to revise the plot plan
for resubmittal to the Board for approval. The public hearing was
opened.
Discussion followed regarding joint driveway access with the adjacent
property, location of drive -up teller windows, clearly defined lot striping
and signage and aisle markings.
Conditions of Approval were discussed. The public hearing was closed.
ON MOTION BY TINDALL AND SECOND BY SPENCER CONDITIONAL EXCEPTION NO.
80-6 WAS APPROVED WITH THE FOLLOWING FINDINGS AND CONDITIONS BY THE
FOLLOWING VOTE:
FINDINGS:
1) The granting of this application would not constitute a grant of
special privilege.
2) Because of special circumstances applicable to the property,
strict application of code requirements is found to have
deprived the property of privileges enjoyed by other properties
in the vicinity.
3) The approval of this application will not be detrimental to
public welfare and is found not to adversely affect the General
Plan.
REASON FOR APPROVAL:
1) Board felt that since base district requirements allow a Zero side yard setback
and that the fact that the twenty (20) feet driveway requirement
adjacent to the buildings was primarily intended for two (2) way
traffic into parking compound, that proponents design of clearly
marking proposed ten (101) foot driveway as one way for "drive -up"
customers and a second means of ingress and egress for indoor customers
was being provided.
CONDITIONS OF APPROVAL:
A) TO BE COMPLETED PRIOR TO ISSUANCE OF BUILDING PERMITS:
1) The revised conceptual plot plan and elevations received
February 27, 1980 shall be the approved layout, subject to
the modification described herein:
a) The one-way driveway shall be clearly delineated with
striping, one way arrows and signage.
Minutes: H.B. Board of Zoning Adjustments
February 27, 1980
Page 3
A plan delineating said modification shall be submitted to
the Secretary of the Board. If such plan complies with the
modification outlined by the Board, said plan shall be approved
and made a permanent part of the administrative file.
In its approval action, the Board of Zoning Adjustments considered
the following issues relating to the conceptual plan:
- Traffic circulation and drives;
- Parking layout;
- Lot area;
- Lot width and lot depth;
- Type of use and its relation to property and improvements in the
immediate vicinity;
- Past administrative action regarding this property.
2) The following plans shall be submitted to the Secretary of
the Board:
Landscape and irrigation plan complying with Article 979
of the Huntington Beach Ordinance Code and landscaping
specifications on file in the Department of Public Works.
Rooftop mechanical equipment screening plan. Said plan
shall indicate -screening of all rooftop mechanical equip-
ment and shall delineate the type of material proposed to
screen said equipment.
AYES: Spencer, Tindall, Kelly
NOES: None
ABSENT: None
-ON MOTION BY TINDALL AND SECOND BY SPENCER USE PEP11IT NO 0 �
---- --- ------
WAS APPROVED WITH THE FOLLOWING FINDINGS AND CONDITIONS:
FINDINGS:
1) The establishement, maintenance, and operation of the use will not
be detrimental to:
a) The general welfare of persons residing or working in the
vicinity.
b) Property and improvements in the vicinity of such uses or
building.
3) The proposal is consistent with the City's General Plan of
Land Use.
Minutes: H.B. Board of Zoning Adjustments
February 27, 1980
Page 4
CONDITIONS OF APPROVAL:
A) TO BE COMPLETED PRIOR TO ISSUANCE OF BUILDING PERMITS:
1) The revised conceptual plot plan and elevations received
February 27, 1980, shall be the approved layout, subject
to the modification described herein:
a) On -site striping, aisle marking and signage shall
be clearly delineated.
A plan delineating said modification shall be submitted to -the
Secretary of the Board. If such plan complies with the modification
outlined by the Board, said plan shall be approved and made a
permanent part of the administrative file.
In its approval action, the Board of Zoning Adjustments considered the
following issues relating to the conceptual plan:
- Traffic circulation and drives;
- Parking layout;
- Lot area;
- Lot width and lot depth;
- Type of use and its relation to the property and improvements
in the immediate vicinity;
- Past administrative action regarding this property.
2) The following plans shall be submitted to the Secretary of
the Board:
a) Landscaping and irrigation plan complying with Article 979
of the Huntington Beach Ordinance Code and landscaping
specifications on file in the Department -of Public W(?rks.
b) Rooftop mechanical equipment screening plan. Said plan shall
indicate screening of all rooftop mechanical equipment and
shall delineate the type of material proposed to screen said
equipment.
B) GENERAL CONDITIONS:
1) The proposed signing shall conform to Article 979 of the
Huntington Beach Ordinance Code.
2) Applicant shall attempt to work with adjacent property ,to
the north, a program to restripe parking stalls between
joint driveway and the applicant's north property line.
3) Natural gas shall be stubbed in at the locations of cooking
facilities, water heaters, and central heating units.
�J
Minutes: H.B. BOARD OF ZONING ADJUSTMENTS
February 27, 1980
Page 5
4) Low volume heads shall be used on all indoor spigots.
5) All building spoils, such as unusable lumber, wire, pipe, and
other surplus or unusable material, shall be disposed of at
an offsite facility equipped to handle them.
6) If lighting is included in the parking lot, energy efficient
lamps shall be used (e.g. high pressure sodium vapor, metal
halide). All outside lighting shall be directed to prevent
"spillage" onto adjacent properties.
7) A detailed soils analysis shall be prepared by a registered
soils engineer. This analysis shall include on -site soil
sampling and laboratory testing of materials to provide
detailed recommendations regarding grading, chemical and
fill properties, foundations, retaining walls, streets and
utilities.
AYES: Spencer, Kelly, Tindall
NOES: None
ABSENT: None
CONDITIONAL EXPECTION NO. 80-8
Applicant: Carlos Sanches
To permit the display and storage of rental equipment
and to allow relief from certain screening provisions
west side of Beach Boulevard, approximately 210 feet
IN CONJUNCTION WITH:
ADMINISTRATIVE REVIEW NO. 80-4
Applicant: Carlos Sanches
within setback
located on the
south of Cypress.
To permit the outside display and/or storage of rental equipment
located on the west side of Beach Boulevard, approximately 210 feet
south of Cypress.
This request is a categorical exemption, Class 1, California Environmental
Quality Act, 1970
Secretary Spencer introduced the applications to the Board. He stated
.that there were several violations regarding on -site and off -site
improvements per the Huntington Beach Ordinance Code. The public hearing
was opened.
Mr. Carlos Sanches, the applicant was present. He stated that at the
time be bought the business it had been in operation approximately ten
(10) years. He further explained that he had no prior knowledge that
improvements both on -site and off -site were required. Mr. Sanches
requested the Board allow him reasonable time to comply with the Ordinance
Code requirements for improvements.
Minutes: H.B. Board of Zoning Adjustments
February 27, 1980
Page 6
The Board discussed the Conditions of Approval: There being no other
parties present, Chairman Tindall closed the public hearing.
ON MOTION BY SPENCER AND SECOND BY TINDALL CONDITIONAL EXCEPTION NO.
80-8 WAS APPROVED WITH THE FOLLOWING'FINDINGS, REASONS AND CONDITIONS
OF APPROVAL, BY THE FOLLOWING VOTE:
FINDINGS:
1) The granting of this application is found not to constitute a grant
of special privileges.
2) Granting of this application will not be detrimental to the public
welfare nor will it adversely affect the City's General Plan.
REASONS FOR APPROVAL:
1) Applicant's use has been in operation for a period exceeding ten
years both on .a conforming and non -conforming basis. And that
outside display or rental equipment has been within the -required
setback for same period of time.
2) Numerous other displays (boats, -trailers, garden equipment) are
allowed within the setbacks along Beach Boulevard with certain
screening provisions being required.
CONDITIONS OF APPROVAL:
A) TO BE COMPLETED PRIOR TO ISSUANCE OF BUILDING PERMITS:
1) The conceptual plot plan and elevations received February 4,
1980 shall be the approved layout. -
in its approval action, the Board of Zoning Adjustments considered
the following issues relating to the conceptual plan:
- Traffic circulation and drives;
- Parking layout;
- Lot area;
- Lot width and lot depth;
Type of use and its relation to property and improvements in the
immediate vicinity;
Past administrative action regarding this property.
C
Minutes: H.B. Board of Zoning Adjustments
February 27, 1980
Page 7
2) The following plan shall be submitted to the Secretary of the
Board:
a) Landscape and irrigation plan complying with Article 979 of
the Huntington Beach Ordinance Code and landscaping specifi-
cations on file in the Department of Public Works.
B) GENERAL CONDITIONS:
1) A ten (101) foot minimum landscape area be provided along
frontage adjacent to property line.
2) A minimum of a 32" inch high garden wall be located within said
landscape area.
3) If security fencing is proposed, that all such fencing within
fifty (50') feet setback be of a decorative material subject
to the approval of the Secretary of the Board of Zoning Adjustments.
4) That the driveway approaches from Beach Blvd. be limited
to one/size and location to be approved by the Department of
Public Works.
f,GVpa
5) Surfacing of the outside display shall be of a paved
surface approved by the Department of Pebl-tc— Vorks-.
6) That if a gate is proposed, that said gate set back a
minimum of twenty (20') feet from back of sidewalk.
7) All on -site parking shall comply with Article 979 of the
Huntington Beach Ordinance Code.
8) That Beach Blvd. be fully improved to both State Division
of Highways and Department of Public Works Standards.
9) All existing non -conforming signs be removed and all new
signing comply with Article 976 of the Huntington Beach
Ordinance Code.
10) All the above Conditions be complied with within one (1)
year or this entitlement will become null and void.
AYES: Spencer, Tindall, Kelly
NOES: None
ABSENT: None
Minutes: H.B. BOARD OF ZONING ADJUSTMENTS
February 27, 1980
Page 8
ON MOTION BY SPENCER AND SECOND BY KELLY ADMINISTRATIVE REVIEW
NO. 80-4 WAS APPROVED WITH THE FOLLOWING CONDITIONS, BY THE
FOLLOWING VOTE:
CONDITIONS OF APPROVAL:
A) TO BE COMPLETED PRIOR TO ISSUANCE OF BUILDING PERMITS:
1) The revised conceptual plot plan and elevations received
February 4, 1980 shall be the approved layout, subject
to the modification described herein:
a) Revised site plan (minimum scale 111= 401) incorporating
General Conditions 1 through---7.
A plan delineating said modification shall be submitted to
the Secretary of the Board. If such plan complies with
the modifications outlined by the Board, said plan shall be
approved and made a permanent part of the administrative file.
In its approval action, the Board of Zoning Adjustments considered
the following issues relating to the conceptual plan:
- Traffic circulation and drives;
- Parking layout;
- Lot area;
- Lot width and lot depth;
- Type of use and its relation to the property and improvements
in the immediate vicinity;
- Past administrative action regarding this property.
2) The following plan shall be submitted to the Secretary of the
Board;
Landscape and irrigation plan complying with Article 979
of the Huntington Beach Ordinance Code and landscaping
specifications on file in -the Department of Public Works
B) GENERAL CONDITIONS:
1) A ten (101) foot minimum landscape area be provided along
frontage adjacent to property line.
2) A minimum of a.32" inch garden wall bed within said land-
scape area.
3), If security fencing is proposed, that all such fencing within
the fifty (50') foot setback be of a decorative material
subject to the approval of the Secretary of the Board of
Zoning Adjustments.
4) That the driveway approaches from Beach Blvd. be limited
to one. Size and location to be approved by the Department
of Public Works.
1
Minutes: H.B. BOARD OF ZONING ADJUSTMENTS
February 27, 1980
Page 9
5) Surfacing of the outside display area shall be of a paved surface
approved by the Department of Development Services.
6) All on -site parking shall comply with Article 979 of the
Huntington Beach Ordinance Code.
7) That Beach Boulevard be fully improved to both State
Division of Highways and Department of Public Works standards.
8) All existing non -conforming signs be removed and all new
signage comply with Article 976 of the Huntington Beach
Ordinance Code.
9) All the above Conditions be complied with within one (1)
year or this entitlement will become null and void.
AYES: Spencer, Tindall, Kelly
NOES: None
ABSENT: None
TENTATIVE PARCEL MAP NO. 80-552
Applicant: King You Chai
To permit the consolidation of two (2) parcels into one (1) located
on the north side of Pacific Coast Highway, approximately 730 feet
east of Mariner Drive.
This request is covered by Negative Declaration No. 79-1, approved by the
Board of Zoning Adjustments on February 7, 1979.
Mr. King You Chai was present to represent the application.
Secretary Spencer outlined the application to the Board. The Board
found the application to be within Ordinance Code conformance.
Findings and Conditions of Approval were discussed.
ON MOTION BY SPENCER AND SECOND BY TINDALL TENTATIVE PARCEL MAP NO.
80-552 WAS APPROVED WITH THE FOLLOWING FINDINGS AND CONDITIONS OF
APPROVAL BY THE FOLLOWING VOTE:
FINDINGS:
0
1) The proposed consolidation -of two (2) lots into one (1)
lot for purposes of commercial development is in compliance
with the size and shape of property necessary for that type
of development.
2) The General Plan has set forth provisions for this type of
land use as well as setting forth objectives for implementation
of this type of use.
3) The property was previously studied for this intensity of land
use at the time the land use designation for commercial. develop-
ment which allows commercial buildings, was placed on subject
property.
Minutes: H.B. BOARD OF ZONING ADJUSTMENTS
February 27, 1980
Page 10
4) The size, depth, frontage, street width, and other design and
improvement features of the proposed subdivision are proposed
to be constructed in compliance with standard plans and speci-
fications on file with the City as well as in compliance with
the State Map Act and supplemental City Subdivision Ordinance.
CONDITIONS OF APPROVAL:
A) TO BE COMPLETED PRIOR TO USE OR OCCUPANCY OF SAID PARCELS
FOR ANY PURPOSE:
1) The tentative parcel map received by the Department of
Development Services on February 8, 1980 shall be the
approved layout (with the amendments as noted thereon). '
2) A parcel map shall be filed with, and approved by the
Department of Public Works, and recorded with the Orange
County Recorder prior to issuance of Occupancy Permits.
B) GENERAL CONDITIONS:
1)' A 7' foot dedication shall be dedicated to.City standards
at the time said parcels are developed.
2) A copy of the recorded parcel map shall be filed with the
Department of Development Services.
AYES: Spencer, Tindall, Kelly
NOES; -None
ABSENT: None
USE PERMIT NO. 80--1
Applicant: Econo Lube N' Tune
To permit an Econo Lube N' Tune store and retail tire store located on
the northeast corner of Warner and "A" Streets.
This request is covered by Negative Declaration No. 80-1.
ON MOTION BY TINDALL AND SECOND BY SPENCER THE BOARD, HAVING FOUND THAT
THE PROPOSED PROJECT WILL NOT HAVE A SIGNIFICANT ADVERSE EFFECT ON THE
PHYSICAL ENVIRONMENT, ADOPTED NEGATIVE DECLARATION NO. 80-1 WITH THE
MITIGATING MEASURES CONTAINED IN USE PERMIT NO. 80-1 GENERAL CONDITIONS
B-6 THROUGH B-8 IMPOSED ON THE USE PERMIT APPLICATION, BY THE FOLLOWING
VOTE:
AYES: Tindall, Kelly, Spencer
NOES: None
ABSENT: None
The Board reviewed the application. The public hearing was opened.
Minutes: H.B. BOARD OF ZONING ADJUSTMENTS
February 27, 1980
Page 11
Mr. Steve Park and Mr. Russ Perkins were present to represent the
application.
Board members expressed concern regarding the location of trash sites
in relation to the alley public right-of-way, alley and street improve-
ments, storage of incoperable vehicles, and the on -site well.
After reviewing the revised plot plan the Board found the application
to be in compliance with the Huntington Beach Ordinance Code, subject
to Findings and Conditions which were discussed with the applicant.
Chairman Tindall closed the public hearing as there were no other
parties present to speak.
ON MOTION BY TINDALL AND SECOND BY SPENCER USE PERMIT NO. 80-1 WAS
APPROVED WITH THE FOLLOWING FINDINGS AND CONDITIONS BY THE FOLLOWING
VOTE:
FINDINGS:
1) The establishement, maintenance, and operation of the use will
not be detrimental to:
a) The general welfare of persons residing or working in the
vicinity.
b) Property and improvements in the vicinity of such use or
building.
2) The granting of a Use Permit will not adversely affect the
General Plan of the City of Huntington Beach.
3) The proposal is consistent with the City's General Plan of
Land Use.
CONDITIONS OF APPROVAL:
A) TO BE COMPLETED PRIOR TO ISSUANCE OF BUILDING PERMITS:
1) The revised conceptual plot plan and elevations received
January 29, 1980 shall be the approved layout, subject
to the modifications described herein:
a) Applicant shall submit revised plot plan depicting
relocation of trash enclosures so as not to conflict
with the alley right-of-way.
b) A parcel map for the purpose of lot consolidation shall be
filed and approved prior to issuance of permits.
Minutes: H.B. BOARD OF ZONING ADJUSTMENTS
February 27, 1980
Page 12
A plan delineating said modifications shall be submitted
to the Secretary of the Board. If such plan complies with the
modifications outlined by the Board, said plan shall be approved
and made a permanent part of the administrative file.
In its approval action, the Board of Zoning Adjustments considered the
following issues relating to the conceptual plan:
- Traffic circulation and drives;
- Parking layout;
- Lot area;
- Lot width and lot depth;
- Type of use and its relation to property and improvements in the
immediate vicinity;
- Past administrative action regarding this property.
2) The following plans shall be submitted to the Secretary of the
Board;
a) Landscape and irrigation plan complying with Article 979
of the Huntington Beach Ordinance Code and landscaping
specifications on file in the Department of Public Works.
b) Rooftop mechanical equipment screening plan. Said plan
shall indicate screening of all rooft6p mechanical equipment
and shall delineate the type of material proposed to screen
said equipment.
B. GENERAL CONDITIONS:
1) Applicant shall dedicate additional right-of-way on Warner,
"A" Street and alley and make all improvemetns to Public
Works Department specifications and standards.
2) No outside storage of inoperable vehicles or materials
shall be allowed.
3) Applicant shall comply with all sign standards as described
in Article 976 of the Huntington Beach Ordinance Code.
4) On site water well shall be improved to visual attractivenss
per Huntington Beach Ordinance Code.
S) Parcel map shall be recorded with Orange County Recorder
prior to final building inspection. -
6) Natural gas shall be stubbed in at the locations of cooking
facilities, water heaters, and central heating units.
7) All building spoils, such as unusable lumber, wire, pipe,
and other surplus or unusable material, shall be disposed
of at an offsite facility equipped to handle them.
8) If lighting is included in the parking lot, energy efficient
lamps shall be used (e.g. high pressure sodium vapor, metal
halide). All outside lighting shall.be directed to prevent
"spillage" onto adjacent properties.
L
J
L
Minutes: H.B. BOARD OF ZONING ADJUSTMENTS
February 27, 1980
Page 13
AYES: Spencer, Tindall,_Kelly
NOES: None
ABSENT: None
ADMINISTRATIVE REVIEW NO. 80-7
Applicant: David R. Benson
To permit the use of two trailers as subdivision offices located
on the north side of Pacific Coast Highway, approximately 150 feet
west of Anderson Street.
This request is a categorical exemption Class 3, California Environ-
mental Quality Act, 1970.
Dr. Noble, the property owner was present to represent the application.
The Board reviewed the the plot plan regarding the location of the
trailers.
Dr. Noble stated that the trailers were approximately 60 x 12 and
30 x 6. The trailers would be moved prior to the construction of
any building.
Board member Kelly expressed his concern with the fire safety requirements.
The Board found the application to be in conformance with the Huntington
Beach Ordinance Code.
ON A MOTION BY SPENCER AND SECOND BY KELLY ADMINISTRATIVE REVIEW NO. 80-7
WAS APPROVED WITH THE FOLLOWING CONDITIONS, BY THE FOLLOWING VOTE:
CONDITIONS OF APPROVAL:
A) TO BE COMPLETED PRIOR OF BUILDING PERMITS:
1) The conceptual plot plan and elevations received February 2, 1980
shall be the approved layout.
In its approval action, the Board of Zoning Adjustments considered
the following issues relating to the conceputal plan:
- Traffic circulation and drives;
- Parking layout;
- Lot area;
- Lot width and lot depth;
- Type of use and its relation to property and improvements in the
immediate vicinity;
- Past administrative action regarding this property.
Minutes; H.B. BOARD OF ZONING ADJUSTMENTS
February 27, 1980
Page 14
g) GENERAL CONDITIONS:
1) Trailers shall be removed prior to construction of buildings.
2) Vehicle access shall meet all Fire Safety Code requirements.
3) All applicable provisions of Section 9730.18 shall be -complied
with.
AYES: Spencer, Tindall, Kelly
NOES: None
ABSENT: None
ADMINISTRATIVE REVIEW NO. 80-5
Applicant: James Lumber Company
To permit a permanent lumber storage facility located on the west
side of Nichols Street approximately 5,881 feet north of Slater.
This request is a categorical exemption Class 1, California Environ-
mental Quality Act, 1970.
Mr. James Harrington was present to represent the application.
Secretary Spencer briefly described the application to the Board.
Board Member Kelly stated his concerns regarding the lack of cooperation
between the applicant and the Fire Department. He stated that the
applicant had been sited for several violations regarding fire lane
access and stacking. He explained that the applicant had been prosecuted
for Fire Code requirements.
Land Use Technician Douglas Heite was present, and stated that the
applicant was at present in violation of the Huntington Beach Ordinance
Code. He suggested that the application be continued until the
applicant had met all requirements.
Deputy City Attorney Charles Matheis, was present and stated that an
on -going prosecution was in effect, and requested that the application
be denied until all violations had been cleared.
The Board discussed the problems with the applicant and it was
decided to continue this application one month in order to allow the
applicant an opportunity to bring the property up to Huntington Beach
Ordinance Code requirements.
ON MOTION BY SPENCER AND SECOND BY KELLY ADMINISTRATION REVIEW NO.
80-5 WAS CONTINUED TO MARCH 26, 1980 BY THE FOLLOWING VOTE.
Minutes: H.B. BOARD OF ZONING ADJUSTMENTS
February 27, 1980
Page 15
AYES: Spencer, Kelly, Tindall
NOES: None
ABSENT: None
There being no further business, the metting was adjourned.
i
Cfiakles P. Spencer, cretary
Board of Zoning Adjustments
�1