HomeMy WebLinkAbout1990-03-21APPROVED 3/28/90
1
MINUTES
HUNTINGTON BEACH OFFICE OF ZONING ADMINISTRATOR
Room B-6 - Civic Center
2000 Main Street
Huntington Beach, California
WEDNESDAY, MARCH 21, 1990 - 1:30 P.M.
ZONING ADMINISTRATOR: Michael Strange
STAFF MEMBER:
MINUTES•
REGULAR AGENDA ITEMS:
Herb Fauland
The Minutes of the March 14, 1990 Zoning
Administrator Meeting were approved as
submitted.
ITEM 1: COASTAL DEVELOPMENT PERMIT NO 90-5/ENVIRONMENTAL
ASSESSMENT NO. 90-8
Applicant: City of Huntington Beach
Public Works Department
2000 Main Street
Huntington Beach, California 92648
Request: Construction of storm drains, catch basins, sewer
pipes and the relocation of man holes.
Location: 6th Street - Pacific Coast Highway to Walnut
Avenue; Walnut Avenue - 6th Street to 3rd Street.
Herb Fauland reported that this is a request for public works
improvements in the coastal zone and therefore requires
discretionary approval. Staff stated that a negative declaration
has been prepared and the mitigation measures are included in the
conditions of approval. Staff recommended approval with findings
and conditions of approval.
THE PUBLIC HEARING WAS OPENED.
Randall Wampler, property owner, asked to review the proposed plans.
There were no other persons present to speak for or against the
request and the public hearing was closed.
Steve Kriger, representing Public Works Department, was available to
answer questions.
DRAFT NEGATIVE DECLARATION NO. 90-8 AND COASTAL DEVELOPMENT PERMIT
NO. 90-5 WERE APPROVED BY THE ZONING ADMINISTRATOR WITH THE
FOLLOWING FINDINGS AND CONDITIONS OF APPROVAL. HE STATED THAT ALL
ACTIONS TAKEN BY THE ZONING ADMINISTRATOR CAN BE APPEALED TO THE
PLANNING COMMISSION WITHIN TEN (10) DAYS AND WITHIN ANOTHER TEN (10)
DAYS TO THE COASTAL COMMISSION.
FINDINGS FOR APPROVAL:
1: The proposed construction of storm drains, catch basins, sewer
pipes and the relocation of manholes conform with the plans,
policies, requirements and standards of the C-LUP.
2. The proposed construction of storm drains, catch basins, sewer
pipes and the relocation of manholes are consistent with the CZ
suffix and the base zoning district as well as qther provisions
of the Huntington Beach Ordinance Code applicable to the
property.
3. The proposed construction of storm drains, catch basins, sewer
pipes and the relocation of manholes will provide -
infrastructure in a manner that is consistent with C-LUP.
4. The proposed construction of storm drains, catch basins, sewer
pipes and the relocation of manholes will conform with the
public access and public recreation policies of Chapter 3 of
the California Coastal Act. Adequate access to the beach from
Pacific Coast Highway is provided.
5. Any negative impact from the displacement of parking spaces
by
the construction of storm drains, catch basins, sewer pipes
and
the relocation of manholes is being mitigated by replacing
the
parking spaces at a one to one ratio as the need warrants.
SPECIAL CONDITIONS OF APPROVAL:
1. The site plan received and dated January 25, 1990 shall be
the
conceptually approved layout.
2. All building spoils, such as unusable lumber, wire, pipe, and
other surplus or unusable material, shall be disposed of at
an
off -site facility equipped to handle them.
3. During cleaning, grading, earth moving or excavation, the
applicant shall:
a. Control fugitive dust by regular watering, paving
construction roads, or other dust preventive measures.
b. Maintain equipment engines in proper tune.
4. During construction, the applicant shall:
a. Use water trucks or sprinkler systems to keep all areas
where vehicles move damp enough to prevent dust raised
when leaving the site.
b. Wet down area in the late morning and after work is
completed for the day.
ZA Minutes - 3/21/90 -2- (5244d)
C. Use low sulfur fuel (.04k% by weight) for construction
equipment.
d. Phase and schedule construction activities to avoid high
ozone days (first stage smog alerts).
e. Discontinue construction during second stage smog alerts.
5. Construction shall be limited to Monday - Saturday 7:00 a.m. to
8:00 p.m. Construction shall be prohibited Sundays and Federal
holidays.
6. Prior to initiation of construction, police and fire
departments shall be notified and the departments shall be kept
informed about duration and extent of construction throughout
the process.
7. Public Works Department shall provide alternate routes for
traffic during the construction phase, if necessary. Adequate
signage shall be provided to warn motor vehicles, bicyclists
and pedestrians of construction.
8. Should parking spaces be displaced by the improvement plan,
parking shall be replaced at a one to one ratio as the
improvements are implemented and the replacement of parking
spaces is warranted.
FORMATION ON SPECIFIC CODE REQUIREMENTS:
1. The development shall comply with all applicable provisions of
the Ordinance Code, Building Division, and Fire Department.
2. The applicant shall meet all applicable local, State, and
Federal Fire Codes, Ordinances, and standards.
ITEM 2: COASTAL DEVELOPMENT PERMIT NO, 90-9:
Applicant: Frank Jao
3322 Devon Circle
Huntington Beach, California 92649
Request: To permit the remodel and addition to an existing
2,228 square foot single story single family
residence. The remodel consist of 696 square feet
to the first floor and the addition consists of a
new 2,512 square foot second story.
Location: 3322 Devon Circle (Admiralty Island, Huntington
Harbour).
Herb Fauland reported that the request is for an addition and
remodel to an existing single family home. Staff stated that the
request is within the height limit and meets the zoning code
requirements for the R1 and CZ development standards. Staff
recommended approval with findings and conditions of approval.
ZA Minutes - 3/21/90 -3- (5244d)
The Zoning Administrator reviewed the plans.
THE PUBLIC HEARING WAS OPENED.
John Cowles, representing the applicant, agreed to the conditions of
approval.
There were no other persons to speak for or against the request and
the public hearing was closed.
COASTAL DEVELOPMENT PERMIT NO. 90-9 WAS APPROVED BY THE ZONING
ADMINISTRATOR WITH THE FOLLOWING FINDINGS AND CONDITIONS OF
APPROVAL. HE STATED THAT ALL ACTIONS TAKEN BY THE ZONING
ADMINISTRATOR CAN BE APPEALED TO THE PLANNING COMMISSION WITHIN TEN
(10) DAYS AND WITHIN ANOTHER TEN (10) DAYS TO THE COASTAL
COMMISSION.
FINDINGS FOR APPROVAL/COASTAL DEVELOPMENT PERMIT NO, 90-3:
1. The remodel and addition to an existing 2,228 square foot two
story single family residence conforms with the plans,
policies, requirements and standards of The Coastal Element of
the General Plan.
2. Coastal Development Permit No. 90-9 is consistent with the CZ
suffix zoning requirements, the R1 Zoning District, as well as
other provisions of the Huntington Beach Ordinance Code
applicable to the property.
3. At the time of occupancy, the remodel and addition to an
existing 2,228 square foot two story single family residence
will be provided with infrastructure in a manner that is
consistent with the Coastal Element of the General Plan.
4. The proposed remodel and addition to an existing 2,228 square
foot two story single family residence conforms with the public
access and public recreation policies of Chapter 3 of the
California Coastal Act.
SPECIAL CONDITIONS OF APPROVAL:
1. The site plan, floor plans, and elevations received and dated
February 20, 1990 shall be the conceptually approved layout.
2. All proposed docks and ramp improvements shall require separate
permits for the improvements located within the public
waterways.
3. All proposed cantilevered deck improvements require separate
permits for the improvements.
4. All building spoils, such as unusable lumber, wire, pipe, and
other surplus or unusable material, shall be disposed of at an
off -site facility equipped to handle them.
ZA Minutes - 3/21/90 -4- (5244d)
5. Proposed structures shall be architecturally compatible with
existing structures.
6. Natural gas shall be stubbed in at the locations of cooking
facilities, water heaters, and central heating units.
7. Low -volume heads shall be used on all spigots and water faucets.
8. The Public Works Department requirements are:
a. Water service shall be upgraded pursuant to Public Works
standards.
b. The applicant shall pay all applicable Public Works fees.
9. The Fire Department requirements are as follows:
a. Automative sprinkler systems will be installed throughout
to comply with Huntington Beach Fire Department and
Uniform Building Codes Standards. Minimum 2 inch domestic
fire service required.
INFORMATION ON SPECIFIC CODE REQUIREMENTS:
1. The development shall comply with all applicable provisions of
the Ordinance Code, Building Division, and Fire Department.
2. The applicant shall meet all applicable local, State, and
Federal Fire Codes, Ordinances, and standards.
3. The Zoning Administrator reserves the right to revoke Coastal
Development Permit No. 90-3 if any violation of these
conditions or the Huntington Beach Ordinance Code occurs.
ITEM 3: LOT LINE ADJUSTMENT NO. 90-1A
Applicant: Walden and Associates
Paul E. Reichardt
18012 Cowan, Suite 210
Irvine, California 92714
Request: To adjust the property lines between (Assessor Parcel
No. 023-181-33 & 34) Lot 22, 23 and A of Tract 13821.
Location: 6471, 6481 Morningside Drive
Herb Fauland reported that Lot A located between lots 22 and 23 is
for the purpose of access to an oil island for maintenances purposes
and future access to a golf course. Staff noted that lot A is no
longer needed for the access to the oil island and the plans for the
golf course access are no longer required. The request was reviewed
â– by the City Engineer. Staff recommended approval with findings and
conditions of approval.
Paul Reichardt, the applicant, was present to answer questions.
ZA Minutes - 3/21/90 -5- (5244d)
LOT LINE ADJUSTMENT NO. 90-1A WAS APPROVED BY THE ZONING
ADMINISTRATOR WITH THE FOLLOWING FINDINGS AND CONDITIONS OF
APPROVAL. HE STATED THAT ALL ACTIONS TAKEN BY THE ZONING
ADMINISTRATOR CAN BE APPEALED TO THE PLANNING COMMISSION WITHIN TEN
(10) DAYS.
FINDINGS FOR APPROVAL:
1. The lot line adjustment will not create a nonconforming parcel.
2. The lot line adjustment will not create a nonconforming yard
requirement.
3. The lot line adjustment will not sever existing structures on
the two lots.
CONDITIONS OF APPROVAL
A. TO BE COMPLETED PRIOR TO USE OR OCCUPANCY OF SAID PARCEL(S) FOR
ANY PURPOSE:
1.
The Lot Line Adjustment received by the Department of
Community Development on March 5, 1990 shall be the
approved layout.
2.
Monuments for the newly -established property lines shall
be readjusted in compliance with the Subdivision Map Act.
A record of survey shall be completed to verify the
location of the newly placed monuments.
3.
Said plat map shall be recorded with the County recorder
prior to the issuance of a certificate of compliance for
the structure and/or structures upon subject properties.
A copy of the recorded document shall be submitted to the
Department of Community Development for the file.
4.
All previous conditions of approval for Tract Map No.
13821, Zone Change No. 88-9 and Conditional Use Permit No.
88-18 shall remain in effect.
5.
The applicant shall remove drive approach and replace with
curb, gutter and sidewalk.
THE MEETING WAS ADJOURNED BY THE ZONING ADMINISTRATOR TO THE NEXT
REGULARLY SCHEDULED MEETING OF THE ZONING ADMINISTRATOR ON MARCH 28,
1990 AT 1:30 PM.
Michael S range
Zoning Administrator
:jr
ZA Minutes - 3/21/90 -6- (5244d)