HomeMy WebLinkAbout1990-08-081
MINUTES
HUNTINGTON BEACH OFFICE OF ZONING ADMINISTRATOR
Room B-6 - Civic Center
2000 Main Street
Huntington Beach, California
WEDNESDAY, AUGUST 8, 1990 - 1:30 P.M.
ZONING ADMINISTRATOR:
STAFF MEMBER:
MINUTES•
REGULAR AGENDA ITEMS:
Mike Strange
Mike Connor
The Minutes of the August 1, 1990 was
approved by the Zoning Administrator as
submitted.
ITEM 1: COASTAL DEVELOPMENT PERMIT NO. 89-4:
Applicant: Phil Trinh
16732 Coral Cay Lane
Huntington Beach, CA 92646
Request: To permit a one year
story to an existing
Section 989.5.3 (b)
Ordinance Code
Location: 16732 Coral Cay Lane
Coastal Status: APPEALABLE
extension of time to add a second
single family dwelling pursuant to
(3) of the Huntington Beach
Mike Connor, Staff Planner, reported that Coastal Development Permit
No. 89-4 was approved on March 1, 1989. The applicant submitted
plans to the property owners association and received their approval
on July 11, 1990. Staff recommended approval of the one year
extension of time.
COASTAL DEVELOPMENT PERMIT NO. 89-4 (ONE YEAR EXTENSION OF TIME)
WAS APPROVED BY THE ZONING ADMINISTRATOR WITH THE FOLLOWING FINDINGS
AND CONDITIONS OF APPROVAL. HE STATED THAT ALL ACTIONS TAKEN BY THE
ZONING ADMINISTRATOR CAN BE APPEALED TO THE PLANNING COMMISSION
WITHIN TEN CALENDAR (10) DAYS.
FINDINGS FOR APPROVAL/COASTAL DEVELOPMENT PERMIT NO. 89-4:
1. The request to permit the remodel and addition to an existing
two-story single family residence conforms with the plans,
policies, requirements and standards of The Coastal Element of
the General Plan.
2. Coastal Development Permit No. 89-4 is consistent with the CZ
suffix zoning requirements, the R1 Zoning District, as well as
other provisions of the Huntington Beach Ordinance Code
applicable to the property.
3. At the time of occupancy, the proposed remodel and addition to
an existing two-story single family residence will be provided
with infrastructure in a manner that is consistent with the
Coastal Element of the General Plan.
4. The proposed remodel and addition to an existing two story
single family residence conforms with the public access and
public recreation policies of Chapter 3 of the California
Coastal Act.
SPECIAL CONDITIONS OF APPROVAL:
1. All Conditions of Approval from the Notice of Action letter
dated March 1, 1990.
2. The Fire Department requirements are:
a. Automatic sprinkler systems shall be installed throughout
to.comply with Huntington Beach Fire Department and Uniform
Building Code standards if the gross floor area exceeds
5,000 square feet.
3. This permit shall expire March 1, 1991.
INFORMATION ON SPECIFIC CODE REQUIREMENTS:
1. The development shall comply with all applicable provisions of
the Ordinance Code, Building Division, and Fire Department.
2. The applicant shall meet all applicable local, State, and
Federal Fire Codes, Ordinances, and standards.
3. The Zoning Administrator reserves the right to revoke Coastal
Development Permit No. 90-10 if any violation of these
conditions or the Huntington Beach Ordinance Code occurs.
ITEM 2: TENTATIVE PARCEL MAP NO. 90-264
Applicant: Jamil Gammoh
327 llth Street
Huntington Beach, CA 92648
Request: To consolidate two lots into one pursuant to Section
9921 of the Huntington Beach Ordinance Code.
Location: 327 llth Street (South West Corner of llth Street and
Orange Avenue).
ZA Minutes - 8/8/90 -2- (6854d)
1
1-1
Mike Connor, Staff Planner, reported that the request is the result
of a fire that occurred on the property to a single family residence
on the back of the lot. He stated that the Department of Public
Works is requesting that the applicant improve and dedicate a 2 1/2
foot alley dedication to city standards. A tentative parcel map is
required to eliminate the lot line and permit reconstruction. Staff
recommended approval with findings and conditions.
THE PUBLIC HEARING WAS OPENED.
James Gammoh, the applicant, concurred with the conditions of
approval.
There were no other persons present to speak for or against the
request and the public hearing was closed.
TENTATIVE PARCEL MAP NO. 90-264 WAS APPROVED BY THE ZONING
ADMINISTRATOR WITH THE FOLLOWING FINDINGS AND CONDITIONS OF
APPROVAL. HE STATED THAT ALL ACTIONS TAKEN BY THE ZONING
ADMINISTRATOR CAN BE APPEALED TO THE PLANNING COMMISSION WITHIN TEN
CALENDAR (10) DAYS.
FINDINGS FOR APPROVAL:
1. The proposed lot consolidation for purposes of commercial and
residential use in compliance with the size and shape of
property necessary for that type of development.
2. The General Plan has set forth provisions for this type of land
use as well as setting forth objectives for implementation of
this type of use.
3. The property was previously studied for this intensity of land
use at the time the land use designation for community business
district allowing commercial buildings was placed on the subject
property.
4. The size, depth, frontage, street width and other design and
improvement features of the proposed subdivision are proposed to
be constructed in compliance with standards plans and
specifications on file with the City as well as in compliance
with the State Map Act and supplemental City Subdivision
Ordinance.
5. The proposed consolidation complies with the requirements as to
area, improvement and design, flood and water drainage control,
appropriate and approved public roads, sewer and water
facilities, environmental protection, and other requirements of
Article 992 of the Subdivision Section of the Ordinance Code.
ZA Minutes - 8/8/90 -3- (6854d)
SPECIAL CONDITIONS OF APPROVAL:
A. TO BE COMPLETED PRIOR TO USE OR OCCUPANCY OF SAID PARCEL(S) FOR
ANY PURPOSE:
1. The Tentative Parcel Map received by the Department of
Community Development on July 12, 1990 shall be the
approved layout.
2. A parcel map shall be filed with and approved by the
Department of Public Works and recorded with the Orange
County Recorder.
3. A two and one half (2.5) foot alley dedication shall be
dedicated to City standards.
4. Water supply shall be through the City of. Huntington
Beach's water system at the time said parcel(s) is/are
developed (if such systems exist within 200 feet of said
parcel(s)).
5. Sewage disposal shall be through the City of Huntington
Beach's sewage system at the time said parcel(s) is/are
developed.
6. All utilities shall be installed underground at the time
said parcel(s) is/are developed.
7. The applicant shall comply with all applicable City
Ordinances.
8. Street improvements shall be constructed to Public Works
standards.
9. Upon completion of the above conditions, the applicant may
submit a request for the waiver of the final parcel map in
conjunction with an eight and one-half (8 1/2) inches by an
eleven (11) inch plat map. Upon the granting of the final
map waiver by the Zoning Administrator, the applicant shall
record a "Covenant To Hold Properties As One Parcel" and
the approved plat map with the Orange County Recorder's
Office. A copy of the recorded covenant shall be filed
with the Department of Community Development prior to final
inspection issuance of building permits.
ITEM 3• USE PERMIT NO. 90-43
Applicant: Denise DeVines
1
ZA Minutes - 8/8/90 -4- (6854d)
Request: To permit a One Day Temporary Outdoor Event August
18, 1990, pursuant to Section 9730.64 of the
Huntington Beach Ordinance Code
Location: 16400 Pacific Coast Highway
Mike Connor, Staff Planner, reported that the temporary outdoor
event is to be held on August 18, 1990 between the hours of 11:00 AM
and 5:00 PM and will take place in the southern portion of the
parking lot. The event is a fund raiser for the Huntington Beach
Pier and is sponsored by the Red Onion Restaurant. Staff noted that
the Police Department was notified of the event and no comments had
been received. Staff recommended approval with findings and
conditions.
THE PUBLIC HEARING WAS OPENED.
Chip Harvey, representing the applicant, was present and concurred
with the conditions of approval.
There were no other persons to speak for or against the request and
the public hearing was closed.
USE PERMIT NO. 90-43 WAS APPROVED BY THE ZONING ADMINISTRATOR WITH
THE FOLLOWING FINDINGS AND CONDITIONS OF APPROVAL. HE STATED THAT
ALL ACTIONS TAKEN BY THE ZONING ADMINISTRATOR CAN BE APPEALED TO THE
PLANNING COMMISSION WITHIN TWO CALENDAR (2) DAYS.
FINDINGS FOR APPROVAL:
1. The temporary outdoor event will not be detrimental to:
a. The general welfare of persons residing or working in the
vicinity.
b. Property and improvements -in the vicinity of such use or
building.
2. The granting of Use Permit No. 90-43 will not adversely affect
the General Plan of the City of Huntington Beach.
SPECIAL CONDITIONS OF APPROVAL:
1. The site plan received and dated July 20, 1990 shall be the
conceptually approved layout.
2. Fire access lanes shall be maintained. If fire lane violations
occur and the services of the Fire Department are required, the
applicant will be liable for expenses incurred.
3. Fire access lanes shall be a minimum with of (20) twenty feet.
4. A detailed site plan shall be submitted to the Huntington Beach
Fire Department for approval (show table locations, tents,
barriers, etc.).
ZA Minutes - 8/8/90 -5- - (6854d)
5. The applicant shall obtain all necessary Fire Department
permits and comply with all provisions of Article 32 of the
Uniform Fire Code.
6. The applicant's request shall include necessary permits for
balloons and temporary signs.
7. The applicant shall obtain clearance from the Public Liability
Claims Coordinator, Administrative Services Department, and/or
shall provide a Certificate of Insurance and Hold Harmless
Agreement to be executed at least five (5) days prior to the
event.
8. All proposed tents shall be of fire retardant material. Proof
of Certification shall be submitted to the Fire Department for
approval prior to the tent's installation on the site.
9. The proposed tent shall be secured against collapsing to the
satisfaction of the Fire Department.
10. Fire extinguishers shall be provided in number and locations
specified by the Fire Department.
11. A minimum of two (2) exits shall be provided and maintained.
INFORMATION OF SPECIFIC CODE REQUIREMENTS:
1. The event shall comply with all applicable provisions of the
Ordinance Codes, Building Division and Fire Department.
2. The applicant shall meet all applicable local, State and
Federal Fire Codes, Ordinances and standards.
3. The Zoning Administrator reserves the right to revoke Use
Permit No. 90-43 if any violations of these conditions or the
Huntington Beach Ordinance Code occurs.
ITEM 4• USE PERMIT NO. 90-44
Applicant: Peter's Landing Marina
Request: Temporary Outdoor Event, August 19, 1990 pursuant to
Section 9730.64 of the Huntington Beach Ordinance
Code
Location: 16400 Pacific Coast Highway
Mike Connor, Staff Planner, reported that the temporary outdoor
event is a meeting for the managers and tenants in the marina and is
not open to the public. The meeting will take place on August 19,
1990 between the hours of 12:00 noon and 3:00 PM. Staff recommended
approval with findings and conditions.
ZA Minutes - 8/8/90 -6- (6854d)
1
THE PUBLIC HEARING WAS OPENED.
Linda Rouan, representing the applicant, concurred with the
conditions of approval.
There were no other persons to speak for or against the request and
the public hearing was closed.
USE PERMIT NO. 90-44 WAS APPROVED BY THE ZONING ADMINISTRATOR WITH
THE FOLLOWING FINDINGS AND CONDITIONS OF APPROVAL. HE STATED THAT
ALL ACTIONS TAKEN BY THE ZONING ADMINISTRATOR CAN BE APPEALED TO THE
PLANNING COMMISSION WITHIN TWO CALENDAR (2) DAYS.
FINDINGS FOR APPROVAL:
1. The temporary outdoor event will not be detrimental to:
a. The general welfare of persons residing or working in the
vicinity.
b. Property and improvements in the vicinity of such use or
building.
2. The granting of Use Permit No. 90-44 will not adversely affect
the General Plan of the City of Huntington Beach.
SPECIAL CONDITIONS OF APPROVAL:
1. The site plan received and dated July 20, 1990 shall be the
conceptually approved layout.
2. Fire access lanes shall be maintained. If fire lane violations
occur and the services of the Fire Department are required, the
applicant will be liable for expenses incurred.
3. Fire access lanes shall be a minimum with of (20) twenty feet.
4. A detailed site plan shall be submitted to the Huntington Beach
Fire Department for approval (show table locations, tents,
barriers, etc.).
5. The applicant shall obtain all necessary Fire Department
permits and comply with all provisions of Article 32 of the
Uniform Fire Code.
6. The applicant's request shall include necessary permits for
balloons and temporary signs.
7. The applicant shall obtain clearance from the Public Liability
Claims Coordinator, Administrative Services Department, and/or
shall provide a Certificate of Insurance and Hold Harmless
Agreement to be executed at least five (5) days prior to the
event.
ZA Minutes - 8/8/90
-7- (6854d)
8. The proposed tent shall be of fire retardant material. Proof
of Certification shall be submitted to the Fire Department for
approval prior to the tent's installation on the site.
9. The proposed tent shall be secured against collapsing to the
satisfaction of the Fire Department.
10. Fire extinguishers shall be provided in number and locations
specified by the Fire Department.
11. A minimum of two (2) exits shall be provided and maintained.
INFORMATION OF SPECIFIC CODE REQUIREMENTS:
1. The event shall comply with all applicable provisions of the
Ordinance Codes, Building Division and Fire Department.
2. The applicant shall meet all applicable local, State and
Federal Fire Codes, Ordinances and standards.,
3. The Zoning Administrator reserves the right to revoke Use
Permit No. 90-44 if any violations of these conditions or the
Huntington Beach Ordinance Code occurs.
ITEM 5• COASTAL DEVELOPMENT PERMIT NO. 90-26:
Applicant: Maurice White
16174 Bimini Lane
Huntington Beach, CA 92649
Request: To permit the remodel and addition of 224 square feet
to an existing 1942 square foot townhouse, pursuant to
Section 989.5.3.(b)(1) of the Huntington Beach
Ordinance Code. The additions consist of a 132 square
foot room addition to the second floor and a 92 square
foot -addition to the first floor which was recently
permitted.
Location: 16174 Bimini Lane
Coastal Status: APPEALABLE
Mike Connor, Staff Planner, reported that the request is for an 224
square foot addition to the first and second story of an existing
single family townhouse. The homeowners association reviewed the
proposed plans and recommended approval. Staff recommended approval
with findings and conditions.
Dennis Groat, Fire Department, advised that if the overall townhouse
structure exceeds 5,000 square feet, a new ordinance requires the
enmtire structure to be sprinklered.
1
ZA Minutes - 8/8/90 -8- (6854d)
1
THE PUBLIC HEARING WAS OPENED.
Maurice White concurred with the conditions of approval except for
the condition requiring the entire building to be sprinklered. The
sprinklering would be a hardship because there are eight units and
the other seven owners would not want to participate.
Mike Strange advised that the Zoning Administrator does not have
authority to amend conditions required by the Fire Department.
Dennis Groat suggested that the applicant meet with the Fire
Marshall to request an exception of this condition.
There were no other persons present to speak for or against the
request and the public hearing was closed.
COASTAL DEVELOPMENT PERMIT NO. 90-26 WAS APPROVED BY THE ZONING
ADMINISTRATOR WITH THE FOLLOWING FINDINGS AND CONDITIONS OF
APPROVAL. HE STATED THAT ALL ACTIONS TAKEN BY THE ZONING
ADMINISTRATOR CAN BE APPEALED TO THE PLANNING COMMISSION WITHIN TEN
CALENDAR (10) DAYS AND ANOTHER TEN WORKING (10) DAYS TO THE COASTAL
COMMISSION.
FINDINGS FOR APPROVAL/COASTAL DEVELOPMENT PERMIT NO, 90-26:
1. The request to permit the remodel and addition to an existing
two-story single family residence conforms with the plans,
policies, requirements and standards of The Coastal Element of
the General Plan.
2. Coastal Development Permit No. 90-26 is consistent with the CZ
suffix zoning requirements, the R1 Zoning District, as well as
other provisions of the Huntington Beach Ordinance Code
applicable to the property.
3. At the time of occupancy, the proposed remodel and addition to
an existing two-story single family residence will be provided
with infrastructure in a manner that is consistent with the
Coastal Element of the General Plan.
4. The proposed remodel and addition to an existing two story
single family residence conforms with the public access and
public recreation policies of Chapter 3 of the California
Coastal Act.
SPECIAL CONDITIONS OF APPROVAL:
1. The site plan,
July 20, 1990
the following
floor plans, and elevations received and dated
shall be the conceptually approved layout with
modification:
ZA Minutes - 8/8/90
-9-
(6854d)
a. The site plan shall be revised to show a 5.26 foot front
yard setback (existing).
2. All building spoils, such as unusable lumber, wire, pipe, and
other surplus or unusable material, shall be disposed of at an
off -site facility equipped to handle them.
3. Proposed structures shall be architecturally compatible with
existing structures.
4. The Fire Department requirements are:
a. Automatic sprinkler systems will be installed throughout
the structure to comply with Huntington Beach Fire
Department and Uniform Building Code standards.
INFORMATION ON SPECIFIC CODE REQUIREMENTS:
1. The development shall comply with all applicable provisions of
the Ordinance Code, Building Division, and Fire Department.
2. The applicant shall meet all applicable local, State, and
Federal Fire Codes, Ordinances, and standards.
3. The Zoning Administrator reserves the right to revoke Coastal
Development Permit No. 90-26 if any violation of these
conditions or the Huntington Beach Ordinance Code occurs.
THE MEETING 4AS ADJOURNED AT 1:58 PM BY THE ZONING ADMINISTRATOR TO
THE NEXT REGbLARLY SCHEDULED MEETING OF THE ZONING ADMINISTRATOR ON
AUGUST 15, 1090.
i hael Strange
Zoning Administrator
:jr
1
ZA Minutes - 8/8/90 -10- (6854d)