REGULAR AGENDA ITEMS:
ITEM 1• LOT LINE ADJUSTMENT NO, 89-5
Applicant: RMG/The Keith Companies
Mr. Joseph Hartge
17961 Cowan
Irvine, CA 92714
Request: To adjust the property line between Lot 43 of Tract
4880 and Lot 1 of Tract 11881 southward approximately
25 feet.
Location: 17141 Edgewater Lane, 4241 Warner Ave.
Herb Fauland, Staff Planner, reported that the request is to adjust
the property line southward approximately 25 feet. The property
line is located between a single family zoned (R1-CZ) lot and the
Huntington Harbour Bay Club (Huntington Harbour Bay Club Specific
Plan) zoned property. Staff advised that an application has been
filed with the Planning Division for a general plan amendment/zone
change on the Bay Club property. To rectify discrepencies in the
zoning on the newly created portion of the single family lot, staff
advised the applicant that no new structures may be built on that
portion of the lot which is not zoned R1-CZ. Staff further advised
the applicant that a zone change may be required on the 25 foot wide
portion of the property. This may be required if the general plan
amendment/zone change application for the Bay Club property is not
processed or approved. Staff recommended approval with findings and
conditions of approval.
The applicant was present and questioned staff on the conditions of
approval requiring a record of survey. He stated for the record
that the lot line adjustment did not include water rights, warfage
or pierhead line rights.
Staff advised that the condition in questions is a standard
condition for a lot line adjustment. The record of survey provides
the necessary documentation to accurately locate property lines for
any future development or property line disputes.
Art Folger, Legal Counsel, advised that the record of survey could
be removed at the Zoning Administrator discretion. Staff
recommended to the Zoning Administrator that the conditions of
approval should not be modified or removed.
LOT LINE ADJUSTMENT NO 89-5 WAS APPROVED BY THE ZONING
ADMINISTRATOR WITH FINDINGS AND CONDITIONS OF APPROVAL. HE STATED
THAT ALL ACTIONS TAKEN BY THE ZONING ADMINISTRATOR CAN BE APPEALED
TO THE PLANNING COMMISSION WITHIN TEN CALENDAR (10) DAYS.
FINDINGS FOR APPROVAL:
1. The lot line adjustment will not create a nonconforming parcel.
2. The lot line adjustment will not create a nonconforming yard
requirement.
3. The lot line adjustment will not sever existing structures on
the two lots.
CONDITIONS OF APPROVAL
A. TO BE COMPLETED PRIOR TO USE OR OCCUPANCY OF SAID PARCEL(S) FOR
ANY PURPOSE:
1. The Lot Line Adjustment received by the Department of
Community Development on September 20, 1989, shall be the
approved layout.
2. Monuments for the newly -established property lines shall be
readjusted in compliance with the Subdivision Map Act. A
record of survey shall be completed to verify the location
of the newly placed monuments.
3. Said plat map shall be recorded with the County Recorder
prior to the issuance of a certificate of compliance for
the subject property. A copy of the recorded document
shall be submitted to the Department of Community
Development for the file.
1
�I
ZA Minutes - 2/6/91 -2- (8712d)
1
ITEM 2• COASTAL DEVELOPMENT PERMIT NO, 90-50
Applicant: Paul Mitchell
Orange County Sanitation District
P. 0. Box 8127
Fountain Valley, CA 92728-8127
Request: To permit the replacement of a 48 inch pipeline with a
120 inch sewage pipeline in addition to installing an 18
inch methane pipeline, a 14 inch treated water pipeline,
and a 4 inch communications conduit, all underground
pursuant to Section 989.5.2 of the Huntington Beach
Ordinance Code.
Location: From the O.C.S.D. treatment plant at Brookhurst and
Bushard along the westerly edge of the Santa Ana River
northward to Hamilton Ave.
Mike Connor, Staff Planner, reported that the project runs from
Hamilton Avenue to the treatment plant along the Santa Ana river and
connects their Huntington Beach and Fountain Valley facilities.
Staff indicated that a two part enviromental impact report for the
system wide improvements was prepared by O.C.S.D. who is the lead
agency. Staff reviewed the mitigation measures and included a
condition that alternate bike trails be provided whenever possible
if construction might require it to be closed. The entire project
will be underground. Staff recommended approval with findings and
conditions of approval.
THE PUBLIC HEARING WAS OPENED.
Paul Mitchell, representing O.C.S.D., advised that construction is
scheduled to begin in June with completion in the fall.
There were no other persons present to speak for or against the
request and the public hearing was closed.
COASTAL DEVELOPMENT PERMIT NO. 90-50 WAS CONDITIONALLY APPROVED BY
THE ZONING ADMINISTRATOR WITH FINDINGS AND CONDITIONS OF APPROVAL.
HE STATED THAT ALL ACTIONS TAKEN BY THE ZONING ADMINISTRATOR CAN BE
APPEALED TO THE PLANNING COMMISSION WITHIN TEN CALENDAR (10) DAYS
AND ANOTHER TEN WORKING (10) DAYS TO THE COASTAL COMMISSION.
FINDINGS FOR APPROVAL/COASTAL DEVELOPMENT PERMIT NO, 90-50:
1. The request to permit the installation of new underground
pipelines conforms with the plans, policies, requirements and
standards of The Coastal Element of the General Plan.
2. Coastal Development Permit N
suffix zoning requirements,
Districts, as well as other
Ordinance Code applicable to
o. 90-50 is consistent with
the C4, R3, and M1 Zoning
provisions of the Huntington
the property.
the CZ
Beach
ZA Minutes - 2/6/91
-3-
(8712d)
3. The proposed pipelines will provide the city with
infrastructure in a manner that.is consistent with the Coastal
Element of the General Plan.
4. The proposed pipelines conform with the public access and
public recreation policies of Chapter 3 of the California
Coastal Act. The project's affects upon coastal access and
recreation will be mitigated through Condition Number Three
(3). The proposed project will have no long term effects upon
coastal access or water oriented recreation.
SPECIAL CONDITIONS OF APPROVAL:
1. The site plan, floor plans, and elevations received and dated
December 11, 1990 shall be the approved layout.
2. All building spoils, such as unusable lumber, wire, pipe, and
other surplus or unusable material, shall be disposed of at an
off -site facility equipped to handle them.
3. The existing bike path shall remain open whenever possible.
In those instances where bikeway closures are necessary, signs
will be posted in advance of construction to inform users of
anticipated closure dates. In addition, when feasible,
bikeways shall be rerouted during project construction
activities.
INFORMATION
ON SPECIFIC CODE
REQUIREMENTS:
1. The
development shall
comply with all applicable provisions of
the
Ordinance Code,
Building Division, and Fire Department.
2. The
applicant shall
meet all applicable local, State, and
Federal Fire Codes,
Ordinances, and standards.
3. The Zoning Administrator reserves the right to revoke Coastal
Development Permit No. 90-50 if any violation of these
conditions or the Huntington Beach Ordinance Code occurs.
ITEM 3: USE PERMIT NO, 90-78
Applicant: China King Food, Inc.
12112 Beach Blvd.
Stanton, CA 90680
Request: To permit the remodel and addition to an existing
restaurant with drive thru facilities pursuant to
Section 9220.1(C)R of the Huntington Beach Ordinance
Code.
ZA Minutes - 2/6/91 -4- (8712d)
1.1
11
Mike Connor, Staff Planner, reported the the request is to remodel
and add drive thru facilities for a building that was originaly
constructed -to be a Pizza Hut restaurant. He advised that an
easement exists along the southern portion of the site to the rear
for vehicular access. Also, a north/south easement for vehicular
access between the various restaurants exists. The applicant's
request is to revitalize the structure and add 120 feet to the rear
of the building. Staff recommended approval of the addition and to
re-establish the use and recommended denial of the drive thru due to
concerns that vehicles queing behind the menu board would block the
reciprocal access drives and could potentially impact Brookhurst
Street.
THE PUBLIC HEARING WAS OPENED.
Henry Chow, architect, urged the Zoning Administrator's approval.
He said they had worked with staff for a solution in an attempt to
receive a favorable recommendation.
Bob Smith, Real Estate Broker, urged the Zoning Administrator's
approval. He said most people purchasing fast foods will not wait
if several cars are stacked but seek another fast food establishment.
Mike Connor, Staff Planner, reported that a letter had been received
from a lawyer representing the owner of the property requesting
approval of the request.
There were no other persons present to speak for or against the
request and the public hearing was closed.
USE PERMIT NO 90-78 WAS APPROVED BY THE ZONING ADMINISTRATOR WITH
FINDINGS AND CONDITIONS OF APPROVAL WITH THE DELETION OF THE DRIVE
THRU. HE STATED THAT ALL ACTIONS TAKEN BY THE ZONING ADMINISTRATOR
CAN BE APPEALED TO THE PLANNING COMMISSION WITHIN TEN CALENDAR (10)
DAYS.
FINDINGS FOR APPROVAL:
1. The establishment, maintenance and operation of Use Permit
No. 90-78 will not be detrimental to:
a. The general welfare of persons residing or working in the
vicinity provided no drive thru is permitted;
b. Property and improvements in the vicinity of such use or
building provided no drive thru is permitted.
2. The granting of Use Permit No. 90-78 will not adversely
affect the General Plan of the City of Huntington Beach. The
proposed restaurant would help to encourage the
diversification of the economic base of the city.
ZA Minutes - 2/6/91
-5-
(8712d)
3. The proposal is consistent with the goals and objectives of
the City's General Plan and Land Use Map. The proposed
restaurant meets the criteria for General Commercial land use
as designated by the general plan.
4. The location, site layout, and design of the proposed use
properly adapts the proposed structures to streets,
driveways, and other adjacent structures and uses in a
harmonious manner.
5. The combination and relationship of one proposed use to
another on site are properly integrated.
6. The access to and parking for the proposed use does not
create an undue traffic problem.
Findings for Denial of Drive Thru:
1. The establishment, maintenance, and operation of the proposed
drive thru would be detrimental to:
a. The general welfare of persons residing or working in the
vicinity.
b. Property and improvements in the vicinity of such use or
building. The proposed circulation for the drive-thru
would obstruct the circulation of traffic both on and off
site due to stacking behind the menu board thereby
creating a potential safety hazard and obstructing access
to area businesses.
2. The granting of the drive-thru would adversely affect the
general plan because the potential to obstruct access
easements and traffic on Brookhurst would not provide for the
safe and efficient movement of people and goods.
SPECIAL CONDITIONS OF APPROVAL:
1. The site plan, floor plans, and elevations received and dated
December 12, 1991, shall be the conceptually approved layout.
2. A revised site plan shall be submitted depicting the
modifications described herein:
a. The gas meter, if relocataed, shall be placed at the rear
of the building or shall be completely screened from view
of Brookhurst Street.
b. No drive-thru shall be permitted.
1
ZA Minutes - 2/6/91 -6- (8712d)
1
3 The Zoning Administrator shall be notified in writing if any
changes in building height, floor area, setbacks, building
elevations or open space are proposed as a result of the plan
check process. Building permits shall not be issued until
the Zoning Administrator has reviewed and approved the
proposed changes. The Zoning Administrator reserves the
right to require that an amendment to the original
entitlement be processed if the proposed changes are of a
substantial nature.
4. Prior to issuance of building permits, the following plans
and items shall be submitted and/or completed by the
applicant:
a. Four (4) sets of landscape and irrigation plans to the
Department of Community Development and Public Works for
review and approval.
b. Rooftop Mechanical Equipment Plan. Said plan shall
indicate screening of all rooftop mechanical equipment
and shall delineate the type of material proposed to
screen said equipment.
c. A Landscape Construction Set shall be submitted to the
Departments of Community Development and Public Works.
The landscape construction set shall include a landscape
plan prepared and signed by a State Licensed Landscape
Architect which includes all proposed/existing plant
materials (location, type, size, quantity), irrigation
plan, grading plan and approved site plan, and copy of
conditions of approval. The landscape plan shall be in
conformance with Section 9608 and 9220.9 of the
Huntington Beach Ordinance Code . The set must be
complete and approved by both departments prior to
issuance of building permits.
7. Installation of required landscaping and irrigation systems
shall be completed prior to final inspection/within twelve
(12) months.
8. Service roads and fire lanes, as determined by the Fire
Department, shall be posted and marked.
9. Fire access lanes shall be maintained. If fire lane
violations occur and the services of the Fire Department are
required, the applicant will be liable for expenses incurred.
10. All building spoils, such as unusable lumber, wire, pipe, and
other surplus or unusable material, shall be disposed of at
an off -site facility equipped to handle them.
11. Natural gas shall be stubbed in at the locations of cooking
facilities, water heaters, and central heating units.
ZA Minutes - 2/6/91
-7-
(8712d)
12. Low -volume heads shall be used on all spigots and water
faucets.
13. If lighting is included in the parking lot, high-pressure
sodium vapor lamps shall be used for energy savings. All
outside lighting shall be directed to prevent "spillage" onto
adjacent properties.
14. All applicable Public Works fees shall be paid prior to
issuance of building permits.
15. Conditions of approval shall be printed verbatim on all
working drawings submitted for plancheck.
INFORMATION ON SPECIFIC CODE REQUIREMENTS:
1. The development shall comply with all applicable provisions
of the Ordinance Code, Building Division, and Fire Department.
2. The applicant shall meet all applicable local, State, and
Federal Fire Codes, Ordinances, and standards.
3. The applicant shall obtain the necessary permits from the
South Coast Air Quality Management District.
4. All signs shall be brought into compliance with the
Huntington Beach Ordinance Code prior to issuance of a
certificate of occupancy.
5. Landscaping shall comply with Section 9608 of the Huntington
Beach Ordinance Code.
6. Prior to Issuance of a Certificate of Occupancy the applicant
shall restripe the parking lot so that it conforms to
provisions of Article 960 of the Huntington Beach Ordinance
Code.
7. The Zoning Administrator reserves the right to revoke this
Use Permit No. 90-78 if any violation of these conditions of
the Huntington Beach Ordinance Code occurs.
ITEM 4• COASTAL DEVELOPMENT PERMIT NO. 90-53/CONDITIONAL EXCEPTION
NO. 91-2:
Applicant: Subbaro and Sarah Myla
16183 Caribou Street
Fountain Valley, CA 92708
Request: Coastal Development Permit No. 90-53 - To permit a
second story addition to an existing one story
dwelling pursuant to Section 989.5.2 of the Huntington
Beach Ordinance Code.
ZA Minutes - 2/6/91 -8- (8712d)
Conditional Exception No. 91-2 - To permit 3,221
square feet (64 percent) of site coverage in lieu of
the 2,750 square feet (55 percent) maximum permitted
by Section 9110.5 of the Code.
Location: 16941 Bolero Lane
Coastal Status: APPEALABLE
Mike Connor, Staff Planner, reported that the Coastal Development
Permit is a request to add a second story to an existing single
family residence and the Conditional Exception is to permit the
structure to exceed the maximum allowable site coverage. Staff
reported that there is a two story residence on each side of the
proposed request and recommended approval of the addition. Staff
recommended denial of the variance request because no exceptional
circumstances existed. Staff also recommended denial of the canvas
cover over the wind screen which was requested by the applicant.
Staff also reported that three letters had been recived from area
residents opposing the enclosed patio area, second story deck and
roof above due to view constraints and current CC&R's within the
Harbour.
THE PUBLIC HEARING WAS OPENED.
John Cowles, representing the applicant, urged the Zoning
Administrator's approval. He said the enclosed patio was permitted
in 1982 and was not considered into the site coverage. He further
advised that they are proposing a motorized sun screen that would be
rolled back 50% of the time.
Mr. Rosen, representing the Huntington Harbour Property Owners
Association, agreed with staff's recommendation for denial of the
variance. He stated oposition to granting any kind of patio cover
as it can become a permanent room.
Lois Hohly, 16931 Bolero Lane, stated opposition to the porch along
the harbor side of the property. She said she was not opposed to
the wind screen if it did not go to the second floor.
Dennis Groat, Fire Department, advised that the Fire Code considers
a fully enclosed patio a room.
There were no other persons present to speak for or against the
request and the public hearing was closed.
ZA Minutes - 2/6/91 -9- (8712d)
COASTAL DEVELOPMENT PERMIT NO. 90-53/ CONDITIONAL EXCEPTION NO.
90-21 WAS CONDITIONALLY APPROVED BY THE ZONING ADMINISTRATOR WITH
FINDINGS AND CONDITIONS OF APPROVAL, AND WITH THE FOLLOWING
CHANGES: (NO ROOF SHALL BE PERMITTED OVER THE PATIO IN CONJUNCTION
WITH THE WINDSCREEN AND THE SECOND STORY DECK AND ROOF ABOVE SHALL
BE REDUCED SO THAT THE STRUCTURE DOES NOT EXCEED 57% OR 2,850 SQUARE
FEET SITE COVERAGE.) HE STATED THAT ALL ACTIONS TAKEN BY THE ZONING
ADMINISTRATOR CAN BE APPEALED TO THE PLANNING COMMISSION WITHIN TEN
CALENDAR (10) DAYS AND ANOTHER TEN WORKING (10) DAYS TO THE COASTAL
COMMISSION.
FINDINGS FOR APPROVAL/COASTAL DEVELOPMENT PERMIT NO 90-53:
1. The request to permit the remodel and second story addition to
an existing one-story single family residence conforms with the
plans, policies, requirements and standards of The Coastal
Element of the General Plan. The proposed project will not
obstruct ocean views or access.
2. Coastal Development Permit No. 90-53 is consistent with the CZ
suffix zoning requirements, the R1 Zoning District, as well as
other provisions of the Huntington Beach Ordinance Code
applicable to the property. The property meets all applicable
provisions of the Huntington Beach Ordinance Code.
3. At the time of occupancy, the proposed remodel and addition to
an existing two-story single family residence will be provided
with infrastructure in a manner that is consistent with the
Coastal Element of the General Plan. All required
infrastructure is currently in place.
4. The proposed remodel and addition to an existing two story
single family residence conforms with the public access and
public recreation policies of Chapter 3 of the California
Coastal Act. The proposed project will have no impact upon
public, water oriented recreation or access.
FINDINGS FOR APPROVAL/CONDITIONAL EXCEPTION N0, 91-02:
1. Because of special circumstances applicable to the subject
property, including size, shape, topography, location or
surroundings, the strict application of the Zoning Ordinance is
found to deprive the subject property of privileges enjoyed by
other properties in the vicinity and under identical zone
classifications.
2. The granting of Conditional Exception No. 91-02 is necessary in
order to preserve the enjoyment of one or more substantial
property rights.
3. The granting of Conditional Exception No. 91-02 will not be
materially detrimental to the public welfare, or injurious to
property in the same zone classifications.
ZA Minutes - 2/6/91 -10- (8712d)
1
1
L
4. The granting of Conditional Exception No. 91-02 will not
adversely affect the General Plan of the City of Huntington
Beach.
5. The applicant is willing and able to carry out the purposes for
which Conditional Exception No. 91-02 is sought and he will
proceed to do so without unnecessary. delay.
SPECIAL CONDITIONS OF APPROVAL:
1. The site plan, floor plans, and elevations received and dated
January 29, 1991 shall be the conceptually approved layout with
the following modification:
a. The second story extension for the master bath shall be
changed to show a tue bay window which does not extent to
the first floor double plate.
b. No cover shall be allowed for the windscreen.
c. The second story deck off of the master bedroom shall be
reduced so that the entire structure does not exceed 2850
square feet of site coverage. The roof above the deck shall
be reduced accordingly.
2. The Zoning Administrator shall be notified in writing if any
changes in building height, floor area, setbacks, building
elevations or open space are proposed as a result of the plan
check process. Building permits shall not be issued until the
Zoning Administrator has reviewed and approved the proposed
changes. The Zoning Administrator reserves the right to require
that an amendment to the original entitlement be processed if
the proposed changes are of a substantial nature.
3. All proposed dock and ramp improvements shall require separate
permits for the improvements located within the public waterways.
4. All proposed cantilevered deck improvements including the
revised windscreen require separate permits for the
improvements. The windscreen shall be at least eighty percent
(80%) open oon one side. The plans submitted show less than
fifty percent (50%).
5. All building spoils, such as unusable lumber, wire, pipe, and
other surplus or unusable material, shall be disposed of at an
off -site facility equipped to handle them.
6. Proposed structures shall be architecturally compatible with
existing structures.
7. Natural gas shall be stubbed in at the locations of cooking
facilities, water heaters, and central heating units.
ZA Minutes - 2/6/91
-11-
(8712d)
8. Low -volume heads shall be used on all spigots and water -faucets.
.9. The Fire Department requirements are:
a. Automatic sprinkler systems will be installed throughout to
comply with Huntington Beach Fire Department and Uniform
Building Code standards if the building exceeds 5,000 gross
square feet.
INFORMATION ON SPECIFIC CODE REQUIREMENTS:
1. The development shall comply with all applicable provisions of
the Ordinance Code, Building Division, and Fire Department.
2. The applicant shall meet all applicable local, State, and
Federal Fire Codes, Ordinances, and standards.
3. The Zoning Administrator reserves the right to revoke Coastal
Development Permit No. 90-53 and Conditional Exception No. 91-2
if any violation of these conditions or the Huntington Beach
Ordinance Code occurs.
ITEM 5: SITE PLAN AMENDMENT N0, 91-2/CONDITIONAL EXCEPTION NO,
91-4
Applicant: City of Huntington Beach
2000 Main Street
Huntington Beach, CA 92648
Attn: Don Noble
Request: Site Plan Amendment No. 91-2 - To permit a revision to
the original site plan approved for Administrative
Review No. 90-13.
Conditional Exception No. 91-4 - To permit an eight (8)
foot exterior side yard setback in lieu of ten (10)
feet required by Section 9120.7(b) of the Huntington
Beach Ordinance Code.
Location: 1706 Orange - Rodger's Senior Center
Mike Connor, Staff Planner, reported the project was originally
approved by the Zoning Administrator under Administrative Review No.
90-13. The Fire Department during the plan check process required a
15 foot separation between buildings. The applicant is proposing to
move the structure over 2 feet resulting the the side yard setback
variance. Staff recommended approval with findings and conditions.
THE PUBLIC HEARING WAS OPENED.
Jim Engle, Community Services, was present and agreed to the
conditions of approval.
ZA Minutes - 2/6/91 -12- (8712d)
LJ
r�
There were no other persons present to speak for or against the
request and the public hearing was closed.
SITE PLAN AMENDMENT NO 91-2/CONDITIONAL EXCEPTION NO. 91-4 WAS
APPROVED BY THE ZONING ADMINISTRATOR WITH FINDINGS AND CONDITIONS OF
APPROVAL. HE STATED THAT ALL ACTIONS TAKEN BY THE ZONING
ADMINISTRATOR CAN BE APPEALED TO THE PLANNING COMMISSION WITHIN TEN
CALENDAR (10) DAYS.
FINDINGS FOR APPROVAL:
1. The establishment, maintenance and operation of the use will
not be detrimental to:
a. The general welfare of persons residing or working in the
vicinity; There are no residences directly adjacent to the
proposed structure.
b. Property and improvements in the vicinity of such use or
building. There are no residences directly adjacent to the
proposed structure.
2. The granting of Site Plan Amendment No 91-2 and Conditional
Exception No. 91-4 will not adversely affect the General Plan
of the City of Huntington Beach.
3. The proposal is consistent with the goals and objectives of the
City's General Plan and Land Use Map. Community facilities are
permitted within all land use designations.
4. Because of special circumstances applicable to the subject
property, including size, shape, topography, location or
existing buildings, the strict application of the Zoning
Ordinance is found to deprive the subject property of
privileges enjoyed by other properties in the vicinity and
under identical zone classifications. The subject property is
zoned CF-R. The placement of the existing building and the
required fire separation prohibits the building from being
placed within the required setbacks.
5. The granting of Conditional Exception No. 91-4 is necessary in
order to preserve the enjoyment of one or more substantial
property rights. The placement of the existing building and
the required fire separation prohibit the building from being
placed within the required setbacks.
6. The granting of Conditional Exception No. 91-4 will not be
materially detrimental to the public welfare, or injurious to
property in the same zone classifications. There are no
residences directly adjacent to the proposed structure.
ZA Minutes - 2/6/91 -13- (8712d)
7. The granting of Conditional Exception No. 91-4 will not
adversely affect the General Plan of the City of Huntington
Beach. Community facilities ar permitted within all land use
designations.
8. The applicant is willing and able to carry out the purposes for
which Conditional Exception No. 91-4 is sought and he will
proceed to do so without unnecessary delay.
9. The location, site layout, and design of the proposed use
properly adapts the proposed structures to streets, driveways,
and other adjacent structures and uses in a harmonious manner.
10. The combination and relationship of one proposed use to another
on site are properly integrated.
11. The access to and parking for the proposed use does not create
an undue traffic problem.
SPECIAL CONDITIONS OF APPROVAL:
1. The site plan, floor plans, and elevations received and dated
January 25, 1991 shall be the conceptually approved layout.
2 The Zoning Administrator shall be notified in writing if any
changes in building height, floor area, setbacks, building
elevations or open space are proposed as a result of the plan
check process. Building permits shall not be issued until the
Zoning Administrator has reviewed and approved the proposed
changes. The Zoning Administrator reserves the right to
require that an amendment to the original entitlement be
processed if the proposed changes are of a substantial nature.
3. Service roads and fire lanes, as determined by the Fire
Department, shall be posted and marked.
4. All building spoils, such as unusable lumber, wire, pipe, and
other surplus or unusable material, shall be disposed of at an
off -site facility equipped to handle them.
5. Proposed structures shall be architecturally compatible with
existing structures.
6. Natural gas shall be stubbed in at the locations of cooking
facilities, water heaters, and central heating units.
7. Low -volume heads shall be used on all spigots and water faucets.
8. If lighting is included in the parking lot, high-pressure
sodium vapor lamps shall be used for energy savings. All
outside lighting shall be directed to prevent "spillage" onto
adjacent properties.
1
ZA Minutes - 2/6/91 -14- (8712d)
4
9. All Conditions of Approval from Administrative Review No. 90-13
shall still apply.
10. Conditions of approval shall be printed verbatim on all working
drawings submitted for plancheck.
INFORMATION ON SPECIFIC CODE REQUIREMENTS:
1. The development shall comply with all applicable provisions of
the Ordinance Code, Building Division, and Fire Department.
2. The applicant shall meet all applicable local, State, and
Federal Fire Codes, Ordinances, and standards.
3. Landscaping shall comply with Section 9608 of the Huntington
Beach Ordinance Code.
THE MEETING WAS ADJOURNED AT 2:40 PM BY THE ZONING ADMINISTRATOR TO
A STUDY SESSION ON MONDAY, FEBRUARY 11, 1991 AT 4:30 PM AND THEN TO
THE NEXT REGULARLY SCHEDULED MEETING OF THE ZONING ADMINISTRATOR ON
WEDNESDAY, FEBRUARY 13, 1991, AT 1:30 PM.
I "I-, t --j' j �':=-
Y6,, �1
Michael Strange
Zoning Administrator
:jr
ZA Minutes - 2/6/91 -15- (8712d)