HomeMy WebLinkAbout1991-08-141
Room B-6 - Civic Center
2000 Main Street
Huntington Beach, California
WEDNESDAY, AUGUST 14, 1991 - 1:30 P.M.
ZONING ADMINISTRATOR: Scott Hess
STAFF MEMBERS:
MINUTES:
REGULAR AGENDA ITEMS:
Mike Connor
The Minutes of the June 31, 1991
Zoning Administrator Meeting were
approved.
ITEM 1: COASTAL DEVELOPMENT PERMIT NO, 91-20
Applicant: Bob Abdelnaby
6801 Bridgewater
Huntington Beach, CA 92647
Request: To permit the remodel and second story addition
to an existing single story residence.
Location: 9232 Christine
Mike Connor, Staff Planner, reported that the applicant is
requesting approval to remodel and add a second story to an existing
single family.residence. Staff reported that the proposed second
story addition would consist of a master bedroom and bonus room.
The existing residence is 1,657 square feet. If the remodel and
addition are approved, the total building area of the residence
would be 3,400 square feet.
Mr. Connor stated that the subject residence backs up to a flood
control channel and that the request meets floodplain requirements.
In addition, the existing residence has a second story deck which
would need to be reduced in size in order to accommodate the
requested second -story addition. Staff recommended approval of the
request with findings and conditions of approval.
THE PUBLIC HEARING WAS OPENED.
Robert Abdelhaby, applicant, was present and spoke in support of the
request.
There were no other persons present to speak for or against the
request and the public hearing was closed.
COASTAL DEVELOPMENT WAS APPROVED BY THE ZONING ADMINISTRATOR WITH
THE FOLLOWING FINDINGS AND CONDITIONS OF APPROVAL. HE STATED THAT
ALL ACTIONS TAKEN BY THE ZONING ADMINISTRATOR CAN BE APPEALED,TO THE
PLANNING COMMISSION WITHIN TEN (10) DAYS AND ANOTHER TEN WORKING
(10) DAYS TO THE COASTAL COMMISSION.
FINDINGS FOR APPROVAL:
1. The request to permit the remodel and second story addition to
an existing one-story residence conforms with the plans,
policies, requirements and standards of The Coastal Element of
the General Plan. The proposed development will have no impact
upon public coastal views, coastal access, energy resources or
infrastructure.
2. Coastal Development Permit No. 91-20 is consistent with the CZ
suffix zoning requirements, the R1 Zoning District, as well as
other provisions of the Huntington Beach Ordinance Code
applicable to the property. The proposed project meets all
aspects of code:
3. At the time of occupancy, the proposed remodel and second story
addition to an existing one-story single family residence will
be provided with infrastructure in a manner that is consistent
with the Coastal Element of the General Plan. All necessary
infrastructure is currently in place.
4. The proposed remodel and second story addition to an existing
one story single family residence conforms with the public
access and public recreation policies of Chapter 3 of the
California Coastal Act. The proposed project will have no
impact upon public coastal access or water oriented public
recreation.
SPECIAL CONDITIONS OF APPROVAL:
1. The site plan, floor plans, and elevations received and dated
July 26, 1991 shall be the conceptually approved layout with
the following modification:
a. The proposed second story deck shall be revised to
accommodate the minimum 900 square foot open space.
2. The Zoning Administrator shall be notified in writing if any
changes in building height, floor area, setbacks, building
elevations or open space are proposed as a result of the plan
check process. Building permits shall not be issued until the
Zoning Administrator has reviewed and approved the proposed
changes. The Zoning Administrator reserves the right to require
that an amendment to the original entitlement be processed if
the proposed changes are of a substantial nature.
ZA Minutes - 8/14/91 -2- (0605d)
3. All building spoils, such as unusable lumber, wire, pipe, and
other surplus or unusable material, shall be disposed of at an
off -site facility equipped to handle them.
4. Natural gas shall be stubbed in at the locations of cooking
facilities, water heaters, and central heating units.
5. Low -volume heads shall be used on all new spigots and water
faucets.
INFORMATION ON SPECIFIC CODE REQUIREMENTS:
1. The development shall comply with all applicable provisions of
the Ordinance Code, Building Division, and Fire Department.
2. The applicant shall meet all applicable local, State, and
Federal Fire Codes, Ordinances, and standards.
3. The Zoning Administrator reserves the right to revoke Coastal
Development Permit No. 91-20 if any violation of these
conditions or the Huntington Beach Ordinance Code occurs.
ITEM 2• COASTAL DEVELOPMENT PERMIT NO, 91-17
Applicant: MVD Architects
2915-A Redhill, Suite 206
Costa Mesa, CA 92626
Request: To permit the demolition and reconstruction of an
existing two story residence.
Location: 3501 Sagamore
Staff reported that the applicant is requesting to demolish an
existing two story residence and reconstruct another single family
residence on the site which is located within the Huntington Harbor
area (Trinidad Island). Staff stated that the residence backs up to
a public waterway and meets all floodplain requirements.
Staff stated that the Fire Department and Department of Public Works
had submitted conditions of approval for the request. The Fire
Department will require that the entire structure be sprinklered and
the Department of Public Works will require that the new residence
have a new curb, gutter and sidewalk.
Staff reported that the new residence's cuppola will exceed the
standard maximum building height but is permitted in the
miscellaneous provisions as a cuppola or architectural tower.
Staff stated that the request meets code and setback requirements and
recommended approval with findings and conditions of approval.
THE PUBLIC HEARING WAS OPENED.
ZA Minutes - 8/14/91 -3- (0605d)
Michael Yolk, representing MVD Architects, was present and spoke in
support of the request.
There were no other persons present to speak for or against the
request and the public hearing was closed.
The Zoning Administrator reported that the request conforms with code
requirements and meets the intent of Coastal Development requirements.
COASTAL DEVELOPMENT PERMIT NO. 91-17 WAS APPROVED BY THE ZONING
ADMINISTRATOR WITH THE FOLLOWING FINDINGS AND CONDITIONS OF
APPROVAL. HE STATED THAT ALL ACTIONS TAKEN BY THE ZONING
ADMINISTRATOR CAN BE APPEALED TO THE PLANNING COMMISSION WITHIN TEN
(10) DAYS AND ANOTHER TEN WORKING (10) DAYS TO THE COASTAL
COMMISSION.
FINDINGS FOR APPROVAL:
1. The request to permit the demolition and reconstruction of an
existing two-story single family residence conforms with the
plans, policies, requirements and standards of The Coastal
Element of the General Plan. The proposed project will have no
impact upon coastal views, access or energy production.
2. Coastal Development Permit No. 91-17 is consistent with the CZ
suffix zoning requirements, the Rl Zoning District, as well as
other provisions of the Huntington Beach Ordinance Code
applicable to the property. The proposed project meets all
aspects of code.
3. At the time of occupancy, the proposed demolition and
reconstruction of an existing two-story single family residence
will be provided with infrastructure in a manner that is
consistent with the Coastal Element of the General Plan. All
necessary infrastructure is currently in place.
4. The proposed demolition and reconstruction of an existing two
story single family residence conforms with the public access
and public recreation policies of Chapter 3 of the California
Coastal Act. The proposed project will have no impact upon
public coastal access or water oriented recreation.
SPECIAL CONDITIONS OF APPROVAL:
1. The site plan, floor plans, and elevations received and dated
July 26, 1990 shall be the conceptually approved layout.
2. The Zoning Administrator shall be notified in writing if any
changes in building height, floor area, setbacks, building
elevations or open space are proposed as a result of the plan
check process. Building permits shall not be issued until the
Zoning Administrator has reviewed and approved the proposed
changes. The Zoning Administrator reserves the right to require
that an amendment to the original entitlement be processed if
the proposed changes are of a substantial nature.
ZA Minutes - 8/14/91 -4- (0605d)
3. All proposed dock and ramp improvements shall require separate
permits for the improvements located within the public waterways.
4. All proposed cantilevered deck improvements require separate
permits for the improvements.
5. All building spoils, such as unusable lumber, wire, pipe, and
other surplus or unusable material, shall be disposed of at an
off -site facility equipped to handle them.
6. Natural gas shall be stubbed in at the locations of cooking
facilities, water heaters, and central heating units.
7. Low -volume heads shall be used on all spigots and water faucets.
8. The Public Works Department requirements are:
a. Repair and replace curb and gutter, driveway and sidewalk as
needed.
b. Water service shall be upgraded to a 2 inch service pursuant
to Public Works standards.
c. The applicant shall pay all applicable Public Works fees.
9. The Fire Department requirements are:
a. Automatic sprinkler systems will be installed throughout to
comply with Huntington Beach Fire Department and Uniform
Building Code standards.
INFORMATION ON SPECIFIC CODE REQUIREMENTS:
1. The development shall comply with all applicable provisions of
the Ordinance Code, Building Division, and Fire Department.
2. The applicant shall meet all applicable local, State, and
Federal Fire Codes, Ordinances, and standards.
3. The Zoning Administrator reserves the right to revoke Coastal
Development Permit No. 91-17 if any violation of these
conditions or the Huntington Beach Ordinance Code occurs.
ITEM 3: USE PERMIT NO. 91-38:
Applicant: City of Huntington Beach
P. O. Boa 190
Huntington Beach, CA 92648
Property Owner: United States of America
2120 South Richey Street
Santa Ana, CA 92705-5195
ZA Minutes - 8/14/91 -5- (0605d)
Request: To permit an eight (8) foot block wall/wrought
iron fence along the exterior side, alley and rear
property lines pursuant to Section 9771(1) of the
Huntington Beach Ordinance Code.
Location: 316 Olive .(Post Office)
Mike Connor, staff planner, reported that the City is requesting to
build an eight (8) foot block wall/wrought iron fence around the
perimeter of the downtown post office. The wall/fence will consist
of a three foot (3') high block (with stucco face) wall with a five
foot (5') high wrought -iron extension.
Staff reported that the request was reviewed by the Design Review
Board at their meeting of August 8, 1991. The Board recommended
approval of the request to the Zoning Administrator with the
following conditions of approval:
1. THE WALL SHALL BE CONSTRUCTED AS PROPOSED WITH A THREE (3')
FOOT BLOCK (STUCCO FACE) AND A FIVE (5') FOOT WROUGHT -IRON
EXTENSION.
2. THE WALL SHALL BE CONSTRUCTED AND TREATED ACCORDING TO CITY
REQUIREMENTS.
3. THE WALL SHALL BE PAINTED WITH A "HUNTER GREEN" HUE. IF THE
SELECTED COLOR IS NOT AVAILABLE, A "BLACK" HUE SHALL BE USED.
Staff recommended approval of the request with findings and
conditions of approval.
THE PUBLIC HEARING WAS OPENED.
Eric Charlone, representing the City's Public Works Department, was
present. Mr. Charlone spoke about the request and answered inquiries
from the Zoning Administrator.
Mr. Charlone reported that the City had originally planned to
construct a six (6) foot wall but that the Federal Government
notified the City that an eight foot (8') wall would be required by
law for the post office site.
There were no other persons present to speak for or against the
request and the public hearing was closed.
The Zoning Administrator reported that the request complies with
Downtown Specific Plan and Downtown Design Guidelines.
USE PERMIT NO. 91-38 WAS APPROVED BY THE ZONING ADMINISTRATOR WITH
THE FOLLOWING FINDINGS AND CONDITIONS OF APPROVAL. HE STATED THAT
ALL ACTIONS TAKEN BY THE ZONING ADMINISTRATOR CAN BE APPEALED TO THE
PLANNING COMMISSION WITHIN TEN CALENDAR (10) DAYS.
ZA Minutes - 8/14/91 -6- (0605d)
FINDINGS FOR APPROVAL:
1. The establishment, maintenance and operation of the eight (8)
foot high wall/fence will not be detrimental to:
a. The general welfare of persons residing or working in the
vicinity; The proposed fence/wall will have no impact upon
persons working or residing in the vicinity.
b. Property and improvements in the vicinity of such use or
building. The proposed wall/fence will have no impact upon
property or improvements in the area.
2. The proposal is consistent with the goals and objectives of the
City's General Plan and Land Use Map. The proposed wall/fence
will provide security for the existing post office which is
consistent with the mixed use - office residential land use
designation of the General Plan.
SPECIAL CONDITIONS OF APPROVAL:
1. The site plan, floor plans, and elevations received and dated
July 24, 1991 shall be the conceptually approved layout.
2. Recommendations from the Design Review Board shall be
incorporated including:
a. The wrought iron shall be painted Hunter Green if
available. If not, the wrought iron shall be painted Black.
b. The stucco color shall match the building.
3 The Zoning Administrator shall be notified in writing if any
changes in height, setbacks, or elevations are proposed as a
result of the plan check process. Building permits shall not
be issued until the Zoning Administrator has reviewed and
approved the proposed changes. The Zoning Administrator
reserves the right to require that an amendment to the original
entitlement be processed if the proposed changes are of a
substantial nature.
4. All building spoils, such as unusable lumber, wire, pipe, and
other surplus or unusable material, shall be disposed of at an
off -site facility equipped to handle them.
5. Proposed structures shall be architecturally compatible with
existing structures.
6. Conditions of approval shall be printed verbatim on all working
drawings submitted for plancheck.
INFORMATION ON SPECIFIC CODE REQUIREMENTS:
1. The development shall comply with all applicable provisions of
the Ordinance Code, Building Division, and Fire Department.
ZA Minutes - 8/14/91 -7- (0605d)
2. The applicant shall meet all applicable local, State, and
Federal Fire Codes, Ordinances, and standards.
3. The Zoning Administrator reserves the right to revoke this Use
Permit 91-38 if any violation of these conditions or the
Huntington Beach Ordinance Code occurs.
ITEM 4: USE PERMIT NO, 91-22.
Applicant: Chris Alicki
Sunrise Auto Sales
15451 Beach Blvd,
Westminster, CA 92683
Property Owner: W. G. Susman
3035 Country Club Drive
Costa Mesa, CA 92626
Request: To permit an automobile sales lot pursuant to Section
9220.1(c)A of the Huntington Beach Ordinance Code.
Location: 17281 Beach Blvd.
Mike Connor, staff planner, reported that the applicant is requesting
to operate a automobile sales lot located on the west side of Beach
Boulevard between Warner Street and Slater Avenue. The lot has two
existing structures; one of which the applicant will use as a sales
office. The rear structure will not be used as a part of the
proposal.
Staff stated that the applicant is planning to upgrade the existing
landscaping and construct an awning along the structure. Photographs
of the site and a colored rendering of the proposal were presented to
the Zoning Administrator.
Staff stated that the rear portion of the property is currently
unpaved and recommended that a block wall be constructed to enclose
the unpaved area. Staff reported that the applicant does not wish to
construct a wall or pave the area at this time, but has indicated
that they intend to demolish the secondary structure within a year.
Staff stated that the applicant is requesting that the Zoning
Administrator allow landscaping to be used in the interim.
Staff reported that the Design Review Board had reviewed this item at
their meeting of August 8, 1991. The Board recommended approval of
the request to the Zoning Administrator with the following conditions
of approval:
1. THE MATERIALS AND COLORS USED SHALL BE AS PROPOSED.
2. THE REAR PROPERTY SHALL BE GRADED AND HYDROMULSHED WITH A GRASS
MATERIAL DESIGNED FOR LOW-WATER USAGE.
3. A TEMPORARY IRRIGATION SYSTEM SHALL BE USED.
ZA Minutes - 8/14/91 -8- (0605d)
1
Fj
Staff reported that the Design Review Board did not take action to
require construction of a block wall at the rear of the property.
Staff stated that the project's proposed parking is for the first
structure only. Customer parking is proposed to be located in the
rear of the lot.
Staff recommended approval of the request with findings and and
following added condition of approval:
1. Fire lane shall be painted.
THE PUBLIC HEARING WAS OPENED.
Chris Alicki, applicant, was present and spoke in support of the
request. Mr. Alicki spoke about his reasons for placing the parking
spaces in the rear of the lot to allow for the display of vehicles in
the front of the site.
There were no other persons present to speak for or against the
request and the public hearing was closed.
The Zoning Administrator stated that it was critical to make customer
parking available in the front of the proposed business. Discussion
ensued between the applicant and the Zoning Administrator.
The Zoning Administrator expressed concern with the proposed
architecture modifications to the structures.
The Zoning Administrator reported that he would approve the request
with the following added conditions:
1. Freestanding sign shall be removed prior to issuance of a
building permit.
2. A minimum of two (2) parking spaces shall be provided at the
front of the business.
3. A irrevocable access agreement shall be obtained.
4. The rear area of -the site shall be graded and hydroseeded.
5. The architecture design of the structures shall be revised for
compatability with surrounding uses and reviewed by the Zoning
Administrator.
USE PERMIT NO. 91-22 WAS APPROVED BY THE ZONING ADMINISTRATOR WITH
THE FOLLOWING FINDINGS AND REVISED CONDITIONS OF APPROVAL. HE STATED
THAT ALL ACTIONS TAKEN BY THE ZONING ADMINISTRATOR CAN BE APPEALED TO
THE PLANNING COMMISSION WITHIN TEN CALENDAR (10) DAYS.
ZA Minutes - 8/14/91 -9- (0605d)
FINDINGS FOR APPROVAL:
1. The establishment, maintenance and operation of the used
automobile sales lot will not be detrimental to:
a. The general welfare of persons residing or working in the
vicinity; The proposed use will have no impact upon
persons working or residing in the area.
b. Property and improvements in the vicinity of such use or
building. The proposed use will have no impact upon
property or improvements in the area.
2. The proposal is consistent with the goals and objectives of the
City's General Plan and Land Use Map. The proposed automobile
sales lot meets the requirements of the General Commercial Land
Use Designation of the General Plan.
1. The site plan, floor plans, and elevations received and dated
July 31, 1991 shall be the conceptually approved layout with
the following modifications:
a. The awning shall not be permitted. The applicant shall
work with the Zoning Administrator to redesign the
elevations to be more compatible with the area.
b. A minimum of two customer parking spaces shall be provided
along the thirteen (13) foot landscape planter.
c. A 24 foot wide drive aisle shall be painted through the
display area and shall be kept clear as a fire lane.
d. The rear portion of the lot shall be rototilled and
hydroseed landscaped. A temporary irrigation system shall
be provided.
3 The Zoning Administrator shall be notified in writing if any
changes in building height, floor area, setbacks, building
elevations or open space are proposed as a result of the plan
check process. Building permits shall not be issued until the
Zoning Administrator has reviewed and approved the proposed
changes. The Zoning Administrator reserves the right to
require that an amendment to the original entitlement be
processed if the proposed changes are of a substantial nature.
4. Prior to issuance of building permits, the following plans and
items shall be submitted and/or completed by the applicant:
a. Four (4) sets of landscape and irrigation plans to the
Department of Community Development and Public Works for
review and approval.
ZA Minutes - 8/14/91 -10- (0605d)
b. Rooftop Mechanical Equipment Plan. Said plan shall
indicate screening of all rooftop mechanical equipment and
shall delineate the type of material proposed to screen
said equipment.
d. A Landscape Construction Set submitted to the Departments
of Community Development and Public Works. The landscape
construction set shall include a landscape plan prepared
and signed by a State Licensed Landscape Architect which
includes all proposed/existing plant materials (location,
type, size, quantity), irrigation plan, grading plan and
approved site plan, and copy of conditions of approval.
The landscape plan shall be in conformance with Section
9608 of the Huntington Beach Ordinance Code . The set must
be complete and approved by both departments prior to
issuance of building permits.
5.
Installation of required landscaping and irrigation systems
shall be completed prior to issuance of a Certificate of
Occupancy.
6.
Service roads and fire lanes, as determined by the Fire
Department, shall be posted and marked.
7.
Fire access lanes shall be maintained. If fire lane violations
occur and the services of the Fire Department are required, the
applicant will be liable for expenses incurred.
8.
Applicant shall pursue CalTrans approval of radius type
driveways on Beach Boulevard.
9.
Driveway on Beach Boulevard shall have a minimum width of
thirty feet (30').
10.
There shall be no outside storage of inoperable vehicles,
vehicle parts, equipment or trailers.
11.
No repair work shall be permitted on site.
12.
If lighting is included in the parking lot, high-pressure
sodium vapor lamps shall be used for energy savings. All
outside lighting shall be directed to prevent "spillage" onto
adjacent properties.
13.
Prior to issuance of building permits, the subject property
shall provide an irrevocable offer to provide reciprocal
driveway and parking easements between the subject site and
adjacent properties. A copy of the legal instrument shall be
approved by the City Attorney as to form and content and, when
approved, shall be recorded in the Office of the County
Recorder. A copy shall be filed with the Department of
Community Development prior to occupancy.
ZA Minutes - 8/14/91 -11- (0605d)
14. Conditions of approval shall be printed verbatim on all working
drawings submitted for plancheck.
INFORMATION ON SPECIFIC CODE REQUIREMENTS:
1. The development shall comply with all applicable provisions of
the Ordinance Code, Building Division, and Fire Department.
2. The applicant shall meet all applicable local, State, and
Federal Fire Codes, Ordinances, and standards.
3. All signs shall be brought into compliance with the Huntington
Beach Ordinance Code prior to issuance of building permits.
4. The major identification sign shall be removed or altered to
comply with Article 961 within ninety (90) days of the approval
date.
5. The Zoning Administrator reserves the right to revoke this Use
Permit No. 91-11 if any violation of these conditions of the
Huntington Beach Ordinance Code occurs.
ITEM 5: COASTAL DEVELOPMENT PERMIT NO, 91-22:
Applicant: State of California
Department of Transportation
Property Owner: State of California
Dept. of Transportation
2501 Pullman Street
Santa Ana, CA 92705
Request: To permit the widening of Pacific Coast Highway
from Brookhurst Street to Beach Boulevard. A dune
restoration project on the inland side of the
highway for environmental mitigation from
Brookhurst Street to the Southern California Edison
Plant will be reviewed in concept only for
recommendation to the Coastal Commission.
Location: Pacific Coast Highway from Brookhurst Street to
Beach Boulevard
Mike Connor, staff planner, reported that the State Department of
Transportation (CalTrans) is requesting to widen Pacific Coast
Highway from Brookhurst Street to Beach Boulevard. Staff further
stated that a dune restoration project on the inland side of the
highway is required for environmental mitigation from Brookhurst
Street to the Southern California Edison Plant. The City is
reviewing the dune restoration request "in concept" only for
recommendation to the Coastal Commission.
ZA Minutes - 8/14/91 -12- (0605d)
�I
Staff displayed renderings of the proposal and presented a detailed
analysis of the request. Staff reported that an environmental
impact report had been completed for the project and that the dune
restoration is called out as environmental mitigation in the report.
Staff stated that a swail area will be required to be constructed to
prevent fresh water from entering the salt water portions of the
project area.
Staff reported that a letter had been submitted to the City from
Pacific Enviro Design. In the letter, Mr. Bob Nastase, Managing
General Partner, voiced his opposition to the request. Mr. Nastase
stated in his letter that the State Department of Transportation is
threatening emminent domain and that they do not own all of the
surrounding properties to proceed with the request.
Staff recommended approval of the request with findings and
conditions of approval.
Discussion between the Zoning Administrator and staff ensued. The
Zoning Administrator inquired as to whether or not the right-of-way
line was consistent with the White Hole area. Staff responded that
the -edge of the right-of-way is the border between the certified
coastal area and the whitehole (uncertified) area.
Prior to opening the public hearing, the Zoning Administrator asked
a representative from the City Attorney's Office, Art Folger,
whether the City had reviewed the legal aspect of reviewing a
project wherein the applicant does not own all the property. Mr.
Folger reported that it is legal to process the permit portion of
the application and therefore complete ownership of project
properties is not required at this time.
THE PUBLIC HEARING WAS OPENED.
Charles Larwood, representing CalTrans, was present and spoke in
support of the request.
Robert Nastase, representing Pacific Enviro Design, was present and
spoke in opposition to the request citing the following concerns:
1. Issues of ownership title are unresolved.
2. An environmental impact report has not been conducted on the
sand dune restoration project.
3. No analysis has been conducted by CalTrans concerning access
issues.
ZA Minutes - 8/14/91 -13- (0605d)
4. Impacts to remaining properties should be analyzed.
5. The State had failed to acquire a Certificate of Public
Necessity prior to going forward with their request.
Bill Curtis was present and spoke in opposition to the request
citing the following issues of concern:
1. CalTrans does not own the properties needed for the proposed
project; Pacific Enviro Design does.
2. A lawsuit is currently pending concerning the subject property.
Ray Guy, representing Action Boat Brokers located at 21622 Pacific
Coast Highway, was present and spoke in opposition to the request
citing that he was just informed that his business would be impacted
by the request. Specifically, he stated that his business would
lose thirty feet (30') to the widening of Pacific Coast Highway.
Robert L. Moore, representing Mills Land & Water Company, was
present and requested information about the request and specifically
about the rendering's depiction of the proposal.
Ralph Neal, Deputy Director for CalTrans, was present and answered
inquires by the Zoning Administrator.
There were no other persons present to speak for or against the
request and the public hearing was closed.
The Zoning Administrator reported that staff had spent a great deal
of time reviewing this request and that the State Clearinghouse had
approved Environnmental Impact Report No. 85-2 had been approved
1985.
The Zoning Administrator stated that he would approve the dune
restoration and widening of Pacific Coast Highway in concept. He
further stated that the Coastal Development Permit would not be in
effect until the Coastal Commission approves the project and
CalTrans provides proof of ownership or right of possession.
The Zoning Administrator complimented staff planner Mike Connor on
his thorough presentation of the project.
COASTAL DEVELOPMENT PERMIT NO. 91-22 WAS APPROVED IN CONCEPT BY THE
ZONING ADMINISTRATOR WITH THE FOLLOWING FINDINGS AND CONDITIONS OF
APPROVAL. HE STATED THAT ALL ACTIONS TAKEN BY THE ZONING
ADMINISTRATOR CAN BE APPEALED TO THE PLANNING COMMISSION WITHIN TEN
(10) DAYS AND ANOTHER TEN WORKING (10) DAYS TO THE COASTAL
COMMISSION.
Ll
ZA Minutes - 8/14/91 -14- (0605d)
FINDINGS FOR APPROVAL:
Highway widening portion only
1. The request to permit the widening of Pacific Coast Highway from
Brookhurst Street to Beach Boulevard conforms with the plans,
policies, requirements and standards of The Coastal Element of
the General Plan. The proposed project will result in improved
coastal access, enhances water and marine resources and will
have no impact upon public coastal views or energy facilities.
2. Coastal Development Permit No. 91-22 is consistent with the CZ
suffix zoning requirements as well as other provisions of the
Huntington Beach Ordinance Code applicable to the property. The
proposed project meets the standards of the City of Huntington
Beach Department of Public Works for a six (6) lane highway.
3. The proposed highway widening will provide infrastructure in a
manner that is consistent with the Coastal Element of the
General Plan.
4. The proposed highway widening and dune restoration conforms with
the public access and public recreation policies of Chapter 3 of
the California Coastal Act. The proposed project will result in
improved coastal access and recreation opportunities.
FINDINGS FOR "APPROVAL IN CONCEPT" FOR DUNE RESTORATION PORTION ONLY:
1. The request to permit a dune restoration project as mitigation
for the highway widening project conforms with the plans,
policies, requirements and standards of the Coastal Element of
the General Plan. The proposed project will have no impact upon
coastal access or energy resources but will improve water and
marine resources.
2. The proposed dune restoration project is consistent with the LUD
zoning by enhancing a bird sanctuary.
3. The proposed dune restoration requires no additional
infrastructure.
4. The proposed dune restoration is consistent with the public
access and public recreation policies of Chapter 3 of the
California Coastal Act. The proposed project will result in
improved coastal access and recreation opportunities.
1. The site plan, received and dated July 23, 1991 shall be the
conceptually approved layout.
ZA Minutes - 8/14/91 - -15- (0605d)
2. The approval of Coastal Development Permit No. 91-22 shall not
become effective until the following conditions are met and
proper documentation has been provided to the Community
Development Department:
A. Approval of a coastal development permit by the California
Coastal Commission for the dune restoration portion of the
project.
B. Proof of ownership or right of possession for all portions
of the proposed project, including the dune restoration area.
3. The applicant shall meet or exceed all mitigation requirements
set forth in the Environmental Impact Report - Environmental
Impact Statement including:
A. The project shall be modified to reduce the needed
right-of-way for expansion. Reduction of the width"of the
median and the drainage ditch reduces the net loss of dune
to 1.6 acres instead of 3.0 acres. With these reductions, a
12-19 foot strip of dune paralleling the highway will be
paved and an average of 48 feet of dune will separate the
highway from the salt marsh.
B. A 1.6 acre dune habitat shall be created within the 17-acre
Caltrans property as part of the overall restoration plan.
C. An unpaved seven -foot wide drainage ditch shall be
constructed in the sand at the edge of the highway
shoulder. The ditch shall serve to catch storm runoff and
its associated pollutants as well as other point source
pollutants.
D. Caltrans shall provide site specific drainage plans at the
intersection of Pacific Coast Highway/Magnolia Street and
Pacific Coast Highway/Brookhurst Street where fresh water
runoff is expected to concentrate. These plans will divert
runoff into buffer areas so that fresh water runoff does not
have adverse effects on salt marsh vegetation. Caltrans
will cooperate with the City of Huntington Beach to place
culverts on Brookhurst to displace the runoff into the
17-acre parcel.
E. Caltrans shall restore and enhance the remaining dune system
in the following ways:
- Sand removed in construction shall be added to the existing
sand dune to form a 4- to 5-foot high sand hummock along the
edge of the drainage ditch. The addition of sand would fill
in the low-lying areas of the dune and create hummocks where
the dune is now flat, areas that currently allow sheet and
concentrated flow of fresh water into the marsh.
ZA Minutes - 8/14/91 -16- (0605d)
F.
Ice plant eradication shall be carried out by qualified
personnel that know the difference between ice plant and
other succulents such as pickleweed. This must be done
under direct on -site supervision of a qualified biologist.
The types of herbicides used should be included in the
mitigation plan.
G.
Timing of activities around Belding savannah sparrow nest
sites should avoid the March 1 through July 30 breeding
period. Construction on the inland side of Pacific Coast
Highway shall be prohibited during this season.
H.
Native willows should be protected as much as possible.
I.
The mitigation plan should specify that mycaporum shrub
removal should be done by hand.
J.
Any planned irrigation must be done with the use of drip
systems rather than sprinkling which would encourage
non -target plant development.
K.
The plant species palette to be used should not contain any
palm trees which form nesting sites for kestrals which prey
on young least terns.
L.
Construction storage sites shall be located as to not impact
any environmentally sensitive or palentological resources.
4. Construction dust and noise shall be controlled as follows:
A.
Use water trucks or sprinkler systems in all areas where
vehicles travel to keep damp enough to prevent dust raised
when leaving the site;
B. Wet down areas in the late morning and after work is
completed for the day;
C. Use low sulfur fuel (.05% by weight) for construction
equipment;
D. Attempt to phase and schedule construction activities to
avoid high ozone days (first stage smog alerts);
E. Discontinue construction during second stage smog alerts; and
F. Construction shall be limited to Monday - Saturday 7:00 AM
to 7:00 PM. Construction shall be prohibited Sundays and
Federal holidays.
ZA Minutes - 8/14/91 -17- (0605d)
5. Coastal access shall be preserved during construction to the
maximum extent possible. The following conditions shall be met:
A. Beach entrances at Beach Boulevard, Magnolia Street and
Brookhurst Street shall not be closed from Memorial Day
Weekend to Labor Day Weekend. If necessary, the Newland
Street entrance may be closed with the concurrence of the
Department of Parks and Recreation.
B. The Department of Parks and Recreation shall be notified of
any proposed beach access closures at least ninety (90) days
prior to the proposed closure dates.
C. A maximum of two (2) entrances may be closed at any time.
D. Signs shall be posted at beach entrances notifying the
public of proposed closure dates at least thirty (30) days
prior to the closure date.
E. Detour signs shall be posted to direct the public wishing to
use the beach from closed entrances to open entrances.
Signs shall be posted to reduce traffic on Pacific Coat
Highway as much as possible.
F. Crosswalks for pedestrian access to the beach shall be
provided at entrances and shall be maintained.
INFORMATION ON SPECIFIC CODE REQUIREMENTS:
1. The development shall comply with all applicable provisions of
the Ordinance Code, Building Division, and Fire Department.
2. The applicant shall meet all applicable local, State, and
Federal Fire Codes, Ordinances, and standards.
3. The Zoning Administrator reserves the right to revoke Coastal
Development Permit No. 91-22 if any violation of these
conditions or the Huntington Beach Ordinance Code occurs.
THE MEETING WAS ADJOURNED AT 2:30 PM BY THE
THE NEXT -REGULARLY SCHEDULED MEETING OF THE
WEDNESDAY, AUGUST';21,- 1991, AT 1:30 PM.
ZIA&
Scott Hess
Zoning Administrator
:ss
ZONING ADMINISTRATOR TO
ZONING ADMINISTRATOR ON
11
ZA Minutes - 8/14/91 -18- (0605d)